Sterling Township
Anti-Data Center Policies
Sterling Township’s enacted ordinance allows data centers but requires cooling and water-use controls, noise limits and sound testing, and minimum site sizes, adding construction and compliance costs.
Incentives
Financial Incentive2
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Sterling TownshipEstablishes data-center-specific zoning rules in Sterling Township, though the provided ordinance text doesn’t show what those rules require or prohibit.Sterling Township proposed zoning ordinance amendment, Section 809 (data centers)
People behind it
- Timothy Tuite
Moved to adopt Ordinance 2026-1, the zoning amendment concerning data centers.
- Roger Swingle
Seconded the motion to adopt Ordinance 2026-1, the zoning amendment concerning data centers.
Sources
current law · Sterling TownshipThe current rules are in Ordinance 2026-1, which the Board of Supervisors adopted by a 3 to 0 vote on June 8, 2026.Sterling Township, Wayne County — data-center ordinance (No. 2026-1)
What this means
The measure imposes cooling and water-use rules, noise limits and sound testing and minimum site-size requirements. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.
Restrictions & requirementsHide restrictions & requirements16
Planned Business Park (PBP) District only, § 809.A.3
250-ft lot line setback next to residential uses is optional, since meeting district standards is an alternative, § 809.D.1
Optional 250-ft setback from sound-sensitive uses only, § 809.D.1
Base ordinance noise standards apply, § 809.D.2
Section 809.F limits a data center campus to 5 dBA above the ambient sound level, day and night, on receiving properties outside the DCO District, with analyses using octave band analysis and one-hour average levels.
Octave band analysis required; no dBC limit, § 809.F
Sound analyses and post-construction audits; timing at application and permit not set, § 809.F.4 and F.5
Generator testing exempt from sound limits; no hours rule, § 809.F.2
Hydrogeologic study where water cooling is proposed; no pump tests or well bar, § 809.B.4
Closed-loop or modified closed-loop water cooling required; evaporative cooling not restricted, § 809.B.4
Accessory substations screened by a wall, § 809.C.1
Equipment fully enclosed or screened by a wall; no height standard, § 809.C.1
Master firefighting plan coordinated with the fire department; no annual update, radio, or contacts, § 809.C.6
Applicant must meet fire department requests for training and equipment, § 809.C.6.
Decommissioning plan with financial security; not 110% or 6 months, § 809.C.7 and § 809.H
Security updated every 3 years, not after the first year, § 809.H
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Conditional use in the Planned Business Park District
Sources
expired · Sterling TownshipThe supervisors approved Resolution 2026-09, a 180-day moratorium extension on data centers, and sent a draft data center ordinance to Wayne County and the township Planning Commission for review.Sterling Township, Wayne County — data-center resolution 2026-09
What this means
While in force, the measure paused covered data-center applications or development for 180 day. That stops affected projects from moving ahead during the pause, even though it is not a permanent ban.
Timing
- Ends
- 180-day; exact operative ending date not independently verified.
The supervisors approved Resolution 2026-09, a 180-day moratorium extension on data centers, and sent a draft data center ordinance to Wayne County and the township Planning Commission for review.
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data