Berlin Township
Anti-Data Center Policies
Berlin Township’s enacted ordinance limits data-center noise and building height, requires sound testing and setbacks from homes and other protected places, and may raise project and review costs; approval remains possible.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Berlin TownshipThe Board of Supervisors enacted Data Center Ordinance No. 2026-1 on June 16, 2026, to take effect five days after enactment, and the township secretary provided a signed copy by email on October 21, 2026.Berlin Township, Wayne County — data-center ordinance (No. 2026-1)
What this means
The measure imposes noise limits and sound testing, setbacks from homes or other protected places and building-height limits. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.
Restrictions & requirementsHide restrictions & requirements16
Conditional use; no approval expiration, Item 2.1.a
Environmental impact statement and wetland delineation required, Item 2.1.b
DCET Campus defined and planned as one unit through a master plan, Items 1 and 2.1.b
Master plan for the whole campus; parcels added only with Township approval, Item 2.1.b
65 dBA day and 55 dBA night, 55 dBA next to homes, Item 2.1.iv.1
Preliminary study with the conditional use and permit application and as-built study 6 months after occupancy, Item 2.1.iv.1
Hydrologist water analysis and feasibility study with safe yield; no pump test, Item 2.1.ii
Projected water needs disclosed; no cap, reporting, or drought plan, Item 2.1.ii.2
Utility interconnection agreement confirming capacity; no electrical inspection, Item 2.1.iii.1.
Power generation plants defined; small modular reactors only by special exception, Item 1
Known impacts on electric rates must be set forth; utility financial security required, Item 2.1.iii.1
100-ft woodland buffer along all exterior property lines, Item 2.1.c.
Trip generation required, but a traffic and/or community impact study may substitute, Item 2.1.b and c.6
As-built sound study 6 months after occupancy, Item 2.1.iv.1.b
Items 2.1.iv rescind and allow revocation of the zoning permit for sound violations, and Item 2.5 requires written notice of violations before injunctive relief and fines, but no hearing precedes revocation.
Item 2.3 requires a $20,000 escrow to pay Township professional fees incurred in processing the zoning permit application, and Items 2.1.ii and 2.1.iv have Township-selected firms prepare studies at the developer's expense, but the review is at the zoning stage rather than land development review.
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Conditional use under a standalone ordinance; no zoning ordinance
Sources