Roxbury’s zoning regulations prohibit uses they do not list, creating a major barrier to data centers. They do not name data centers specifically, so their treatment may depend on how town officials classify them.

current law · Town of Roxbury
Prohibits data centers as unlisted uses; the regulations do not specifically address them.Roxbury Zoning Regulations (2025)

What this means

Data centers are not listed as an allowed use, and the regulations say uses not specified are prohibited. That creates a severe barrier to building or operating one, though the regulations do not specifically name data centers, so their treatment could depend on how town officials classify the use.

People behind it

  • Adopted the zoning regulations and is responsible for their review, updates, and administration (responsible for the review, updates, and administration).

Restrictions & requirementsHide restrictions & requirements8
  • An unlisted use is prohibited. Data centers are not named in the permitted principal-use list, and the regulations state that a use not listed is prohibited. The document does not specifically classify data centers.

  • Construction, alteration, or development generally requires a Zoning Permit, and a Building Permit cannot issue first. Before a building or land use is occupied, a Determination of Zoning Compliance is also required; Zoning Permits generally expire after 12 months unless the stated conditions are met. The permit requirements apply generally to development and do not establish a data-center-specific approval path.

  • Zone-based dimensional limits apply to development, including minimum parcel areas of 3 acres in Zones A and B, 4 acres in Zone C, and 1 acre in Zone D; a 25% maximum impervious coverage; and principal-building height limits of 40 feet and 2½ stories. Setbacks also vary by zone. The area and dimensional requirements apply unless another regulation indicates otherwise.

  • The parking table sets a default of one space per 350 square feet of gross building floor area for every other use not listed. The regulations also require parking sufficient for expected users and require accessible spaces under state law.

  • For development requiring Site Plan or Special Permit approval, stormwater rules require pollutant reduction, groundwater recharge and runoff-volume reduction, and peak-flow control for 10-, 25-, and 100-year storms. An alternative may be approved by Special Permit when site conditions prevent compliance, with a positive recommendation from an engineer hired by the Commission at the applicant’s expense. The stormwater requirements are tied to those approval types.

  • A soil erosion and sediment control plan is required for development other than a primary or accessory dwelling unit when the cumulative disturbed area exceeds one-half acre. The threshold is based on disturbed area.

  • Exterior lighting must be shielded and aimed to prevent visible light sources, glare, or a bloom beyond the property; LED lighting must be 3000 Kelvin or less unless the Commission allows a higher temperature. The lighting requirements apply to exterior lighting generally.

  • If a Site Plan is required, the application carries a town fee and must include detailed plans signed and sealed by an appropriate professional; the Commission may require additional information. Site-plan work generally must be completed within five years, subject to extensions. The application requirements and deadlines apply when that approval is required.

Benefits & exceptionsHide benefits & exceptions1
  • A lawfully established data center that later becomes nonconforming may continue in its existing form. Expansion is not automatic: it requires a Special Permit and must meet the regulation’s conditions, including limits on further intrusion into nonconforming setbacks and a finding of an overall reduction in the impact of the nonconformity.