For Northwest Hills Planning Region, see Connecticut’s statewide laws and regulations below. No additional county-specific measures are listed in our research.

Pro-Data Center Policies

Connecticut offers qualifying data centers long-term tax exemptions on property, equipment, services, and electricity, but projects must meet investment thresholds and agree on fees with each host municipality before construction. The state also provides applicant assistance and interagency coordination.

Incentives

Tax benefitsGrants and cash rebates

The proposed bill would provide tax credits, grants and research funding for the development of artificial intelligence data centers.

Tax benefitsGrants and cash rebatesPreferential financing

Retains the existing qualified-data-center tax-agreement framework, including conditional 20- or 30-year terms and the existing financial-transactions-tax provision. Separately raises the general state financial-assistance cap from $10 million to $25 million and changes broader financing programs, which may assist independently eligible projects. These are not unconditional or entirely new data-center benefits.

Tax benefitsFee waivers
2

Establishes conditional property and sales/use tax exemptions, including electricity purchases. Higher-investment qualifying centers also receive an exemption from any future state financial-transactions tax or fee. Electricity tax relief is classified as a tax benefit, not a utility-rate incentive.

Creates conditional property and sales/use tax exemptions, including electricity purchases. Higher-investment qualifying centers also receive an exemption from any future state financial-transactions tax or fee. Electricity tax relief is classified as a tax benefit, not a utility-rate incentive.

current law · Statewide
Retains the existing qualified-data-center tax-agreement framework, including investment conditions and potential 20- or 30-year terms; the restatement does not create every listed benefit anew.Connecticut Public Act 26-122 / SB 307 (2026)

What this means

The principal data-center change removes the standalone office while preserving DECD applicant assistance and interagency coordination. The incentive agreement framework is retained rather than broadly newly created, so the direct change to development conditions is limited.

People behind it

  • Introduced the bill.

  • Listed as a co-sponsor of SB-307.

  • Listed as a co-sponsor of SB-307.

Show 5 more peopleShow fewer people
  • Listed as a co-sponsor of SB-307.

  • Listed as a co-sponsor of SB-307.

  • Administers the Connecticut Small Business Boost program and other programs established or revised by the measure.

  • Carries out administrative, funding, reporting, permitting, and program-implementation duties under the measure.

  • Administers or collaborates with the Department of Economic and Community Development on specified program components.

Restrictions & requirementsHide restrictions & requirements8
  • Retained incentive framework (not newly created by PA 26-122): A data center seeking the statutory tax exemption must apply to the Commissioner of Economic and Community Development and enter into an approved agreement demonstrating that it will be used as a qualified data center.

  • Retained incentive framework (not newly created by PA 26-122): Within five years after the agreement becomes effective, the data center must make a qualified investment of at least $50 million if located in an enterprise zone or federal opportunity zone, or at least $200 million if located elsewhere.

  • Retained incentive framework (not newly created by PA 26-122): An agreement generally lasts 20 years and must include a five-year qualifying period for meeting the required investment threshold.

  • Retained incentive framework (not newly created by PA 26-122): A qualified data center must pay an annual administrative fee set by the commissioner, capped at $50,000, during the qualifying period or until the required investment is reached, whichever occurs first.

  • Retained incentive framework (not newly created by PA 26-122): If the data center makes at least $200 million in a qualifying zone or $400 million elsewhere, the commissioner must extend the agreement term to 30 years.

  • Retained incentive framework (not newly created by PA 26-122): The agreement must include provisions requiring assessment and payment of otherwise exempt taxes, plus penalties and interest, if the data center fails to meet the agreement or qualified-data-center requirements.

  • Retained incentive framework (not newly created by PA 26-122): The agreement's requirements apply to subsequent owners, operators, operator affiliates, and colocation tenants for the agreement's remaining term, as long as the facility continues to be used as a qualified data center.

  • Retained incentive framework (not newly created by PA 26-122): The 30-year financial-transactions-tax exemption is available only to a qualified data center, its operator or affiliate, and its colocation tenants after the applicable higher investment threshold is met: $200 million in a qualifying zone or $400 million elsewhere.

Benefits & exceptionsHide benefits & exceptions7
  • Retained incentive framework (not newly created by PA 26-122): Qualified data centers may enter into agreements with the Department of Economic and Community Development for the tax exemptions provided under the data-center program. To qualify, they must make an investment of at least $50 million within five years in an enterprise or federal opportunity zone, or $200 million elsewhere. The agreement generally lasts 20 years and may require an annual administrative fee of up to $50,000 during the qualifying period. The agreement requirements

  • Retained incentive framework (not newly created by PA 26-122): The tax-exemption agreement for a qualified data center must apply to subsequent owners, operators, operator affiliates, and colocation tenants, provided the facility continues to be used as a qualified data center. Applicable to any subsequent owner

  • Retained incentive framework (not newly created by PA 26-122): The commissioner must extend the agreement from 20 years to 30 years if the qualified data center reaches an investment of at least $200 million in an enterprise or federal opportunity zone, or $400 million elsewhere. Extend to thirty years

  • Retained incentive framework (not newly created by PA 26-122): A qualified data center that meets the higher investment threshold, along with its operator, operator affiliate, and colocation tenants, is exempt from state financial-transactions taxes or fees on trades of stocks, bonds, derivatives, and other financial products for 30 years from completion of facility construction. Exempt from any financial transactions tax or fee

  • Administrative change in PA 26-122: The Department of Economic and Community Development must act as a liaison for data-center applicants and qualified data centers with other state agencies, provide assistance from the preapplication phase through post-operation, and seek coordinated, efficient, and timely agency responses. Serve as the liaison

  • Restated permit-ombudsman process: A data-center project that meets the statutory eligibility criteria, such as creating at least 100 jobs, locating in an enterprise zone, being in a brownfield, or satisfying other listed economic-development criteria, may use the state permit-ombudsman process for expedited permit review. The process cannot waive environmental statutory or regulatory requirements or change substantive permitting standards. Expediting review of permit applications

  • Broader economic-development change: The act raises the general limit on financial assistance that state economic-development agencies may award to an applicant or business project during a two-year period from $10 million to $25 million, unless a General Assembly act specifically authorizes the assistance. This can permit larger state financial assistance packages for qualifying data-center projects. More than a total of twenty-five million dollars

Sources

current law · Statewide
Provides qualifying data centers with long-term tax exemptions if they meet investment thresholds, while requiring owners to negotiate a fee agreement with the host municipality before construction.Connecticut General Statutes § 32-286 — Qualified Data Centers

What this means

The measure offers major long-term tax savings on data center property, equipment, services, and electricity for projects meeting investment thresholds (tax exemptions). Owners must meet those thresholds and negotiate a fee agreement with each host municipality before construction, so the benefits come with conditions (host municipality agreement).

People behind it

  • Listed as an introducer of H.B. No. 6514, the qualified data center incentives bill.

  • Listed as an introducer of H.B. No. 6514, the qualified data center incentives bill.

  • Listed as an introducer of H.B. No. 6514, the qualified data center incentives bill.

Show 9 more peopleShow fewer people
  • Listed as an introducer of H.B. No. 6514, the qualified data center incentives bill.

  • Listed as a co-sponsor of H.B. No. 6514.

  • Listed as a co-sponsor of H.B. No. 6514.

  • Listed as a co-sponsor of H.B. No. 6514.

  • Identified in the 2026 act title as making recommendations for commerce-statute revisions; administers the data center incentive program and processes applications.

  • Reviews applications, approves and enters incentive agreements, and oversees the program.

  • Provides tax-exemption certificates and may collect taxes, penalties, and interest when an incentive agreement is terminated.

  • Negotiate fee agreements with qualified data center owners and may address noncompliance under those agreements.

  • Notifies a qualified data center of a municipality’s determination that a host municipality fee agreement is not being met.

Restrictions & requirementsHide restrictions & requirements6
  • To qualify for the tax-exemption agreement, a data center must make a qualified investment within five years: at least $50 million in an enterprise or federal opportunity zone, or $200 million elsewhere. Only eligible, nonduplicative costs count, and costs for property outside the facility are excluded. The investment must be made by the fifth anniversary.

  • The owner must enter into a negotiated host municipality fee agreement before construction, rehabilitation, renovation, or repair begins. An agreement is required for each facility and, if a facility crosses municipal boundaries, with each municipality; it must address payment of otherwise-exempt property taxes and possible penalties and interest. No construction may commence without an agreement.

  • The data center must pay an annual fee set by the commissioner, capped at $50,000, during the five-year qualifying period or until it reaches the required investment, whichever comes first. The annual fee may not exceed fifty thousand dollars.

  • The tax-incentive agreement generally lasts 20 years, and its provisions continue to apply to subsequent owners, operators or their affiliates, and colocation tenants for the agreement’s remaining term, provided the facility continues to be used as a qualified data center. The agreement shall be applicable to any subsequent owner.

  • If the municipality finds the host-fee agreement is not being followed, the data center has 180 days after notice to cure the noncompliance. If it does not, the agreement may be terminated and the data center or property owner becomes liable for the previously exempt property taxes from the date of noncompliance. The qualified data center shall cure such noncompliance.

  • If the state terminates the tax-incentive agreement for noncompliance, the host municipality fee agreement also terminates, and applicable sales and use taxes, penalties, and interest may become due; the state may collect them and place a lien on the data center’s real estate. The commissioner terminates an agreement.

Benefits & exceptionsHide benefits & exceptions7
  • Owners, operators, and colocation tenants may apply for tax-incentive agreements if the facility will be a qualified data center and meets the five-year investment minimum: $50 million in an enterprise or federal opportunity zone, or $200 million elsewhere. Agreements generally last 20 years, and the data center pays an annual administrative fee of up to $50,000 during the qualifying period or until it reaches the investment minimum, whichever comes first. The five-year investment thresholds

  • Qualifying data centers receive sales and use tax exemptions for eligible data-center equipment, specified services used to develop or operate the facility, and all electricity used by the data center. The exemption also applies to the data center’s contractors and subcontractors. The equipment, services and electricity exemption

  • The agreement provides a property-tax exemption for real property, buildings, structures, and qualifying enterprise information technology equipment at the data center. The owner must first enter a negotiated host-municipality fee agreement; facilities in contiguous municipalities require agreements with each municipality. The property-tax exemption

  • During the agreement term, the exemptions can cover additional data-center buildings and equipment, as well as additional equipment, services, and electricity acquired later. Property-tax exemption may also cover an additional facility acquired by the owner, provided it has a host-municipality fee agreement. Additional buildings, equipment and facilities

  • The agreement must be extended to 30 years if investment reaches $200 million in an enterprise or opportunity zone, or $400 million elsewhere. The 30-year extension thresholds

  • A data center meeting those higher investment thresholds, along with its operator or affiliate and colocation tenants, is exempt for 30 years from any state financial-transactions tax or fee imposed on trades of stocks, bonds, derivatives, or other financial products. The financial-transactions tax exemption

  • The Department of Economic and Community Development must act as a liaison, assist applicants and data centers from preapplication through post-operation, and seek coordinated and timely responses from state agencies. The 2026 act assigns these duties to the department rather than a separate office. The department’s data-center assistance duties

Sources

current law · Statewide
Creates long-term tax incentives for qualifying data centers that meet investment thresholds and requires owners to make fee agreements with host municipalities before construction begins.Connecticut H6514 (2021)

What this means

The measure offers long-term property, sales, and electricity tax exemptions to qualifying data centers, making development and operation substantially cheaper. The benefits require large investments and a negotiated agreement with the host municipality, so they are significant but not unconditional.

People behind it

  • Introducer of House Bill 6514

  • Introducer of House Bill 6514

  • Introducer of House Bill 6514

Show 7 more peopleShow fewer people
  • Introducer of House Bill 6514

  • Co-sponsor of House Bill 6514

  • Co-sponsor of House Bill 6514

  • Co-sponsor of House Bill 6514

  • Administers the qualified data center incentive agreements and related program

  • Administers the tax exemption certificates and collection of taxes, penalties, and interest under the measure

  • Established to coordinate and support applicants, qualified data centers, and state agencies

Restrictions & requirementsHide restrictions & requirements5
  • Before construction, rehabilitation, renovation, or repair begins, the owner must negotiate a host-municipality fee agreement; agreements are required for each host municipality and each additional facility. The owner has entered into a negotiated host municipality fee agreement

  • Access to the tax-incentive agreement requires DECD approval and a qualified investment within five years: at least $50 million in an enterprise or federal opportunity zone, or $200 million elsewhere. at least fifty million dollars

  • The DECD agreement must require an annual fee, set by the commissioner at no more than $50,000, during the qualifying period or until the investment threshold is reached, whichever comes first. not to exceed fifty thousand dollars

  • A municipality may notify the data center of noncompliance with its fee agreement; the center has 180 days to cure, after which the agreement may be terminated and property taxes, penalties, and interest may become due on previously exempt property. not later than one hundred eighty days

  • DECD may terminate its agreement if the agreement or data center requirements are not met; termination ends the municipality fee agreement and can make exempted state taxes, penalties, and interest payable. requirements of such agreement or of a qualified data center are not being met

Benefits & exceptionsHide benefits & exceptions5
  • A DECD agreement can provide sales and use tax exemptions for qualifying data-center equipment, related taxable services, and electricity used by the center. Covered equipment includes computing, power, cooling, water-conservation, networking, monitoring, security, and modular-center equipment. The applicant must meet the investment requirement within five years: at least $50 million in an enterprise or federal opportunity zone, or $200 million elsewhere. The agreement generally lasts 20 years, extended to 30 years at higher investment levels. The exemption covers qualified equipment, services, and electricity.

  • A DECD agreement can exempt real property, buildings, and structures at a qualified data center, as well as enterprise information technology equipment, from the state property tax. The exemption also covers qualifying additional buildings and equipment acquired during the agreement; additional facilities require a host municipality fee agreement. The exemption applies to real property and enterprise information technology equipment.

  • For centers meeting the higher investment thresholds—$200 million in an enterprise or federal opportunity zone, or $400 million elsewhere—the measure exempts the center, its operator or operator affiliate, and colocation tenants from any state financial-transactions tax or fee on specified financial products. The exemption lasts 30 years from facility completion. The exemption applies for a period of thirty years.

  • The Office of Data Infrastructure Administration and Security must assist applicants and data centers from preapplication through post-operation, liaise with state agencies, and seek coordinated, efficient, and timely responses. The office shall provide assistance.

  • The agreement’s provisions continue to apply to a subsequent owner, the operator or its affiliate, and colocation tenants while the facility remains a qualified data center, helping preserve the agreement’s terms through changes in ownership or operation. The provisions of the agreement shall be applicable.

Sources

failed · Statewide
Would eliminate state tax exemptions for qualified data centers.Connecticut SB 79 (2024)

What this means

If enacted, the proposal would remove tax breaks for qualified data centers, including sales and use tax exemptions, increasing project costs. It does not propose a ban or address every part of the incentive program, so the added burden is meaningful but limited.

People behind it

  • Identified as the bill's introducer.

  • Administers the Data Center Tax Incentive Program addressed by the measure.

  • Administers and provides information about the data center tax incentive program.

Restrictions & requirementsHide restrictions & requirements5
  • The bill eliminates qualified data centers’ exemptions from the taxes imposed under chapters 203 and 219, increasing the taxes and costs associated with building or operating a data center. The bill eliminates the exemptions

  • To qualify for the data center tax incentive, a facility must make a minimum investment of $50 million if located in an enterprise or opportunity zone, or $200 million if located elsewhere. Qualified Investments

  • The required investment must be made by the fifth year of the facility’s agreement with the Department of Economic and Community Development. the required investment will be made by the fifth year

  • Data center owners and developers must enter into a tax incentive agreement with the Department of Economic and Community Development, generally for a 20-year term. enter into tax incentive agreements with DECD

  • Before beginning a capital project, the owner or developer must enter into a host fee agreement with the municipality where the data center will be located. must enter into fee agreements with the municipalities

Sources

failed · Statewide
Would require AI data centers to use at least 50% renewable energy, adopt energy-storage and water-saving measures, and report their energy use, water use, and emissions, while providing development incentives.Connecticut HB 5076 (2025)

What this means

The proposal would require AI data centers to use at least 50% renewable energy, add energy storage and grid infrastructure, conserve water, and report energy, water, and emissions—requirements that could add meaningful costs. Tax credits, grants, and research funding could offset some of that burden, but the proposal gives no details on their size or availability. The bill’s requirements and proposed incentives

People behind it

  • Introduced the proposed bill; state representative for the 128th District.

Restrictions & requirementsHide restrictions & requirements4
  • Artificial intelligence data centers must obtain at least 50% of their energy consumption from renewable sources.

  • Artificial intelligence data centers must use energy-storage systems and modern grid infrastructure.

  • Artificial intelligence data centers must implement water-conservation measures.

  • Artificial intelligence data centers must report their energy consumption, water consumption, and emissions annually.

Benefits & exceptionsHide benefits & exceptions4
  • Provides tax credits for the development of artificial intelligence data centers.

  • Provides grants for the development of artificial intelligence data centers.

  • Provides research funding for the development of artificial intelligence data centers.

  • Requires artificial intelligence data centers to utilize energy storage systems and modern grid infrastructure, supporting their operation; the measure does not specify funding or other assistance for that infrastructure.

Sources

failed · Statewide
Requires the state to study energy-efficiency standards for AI data centers, including renewable energy, demand-response options, and limits on diesel backup generators, and report its findings by February 1, 2026.Connecticut SB 1292 (2025)

What this means

The substitute bill requires DEEP to study possible efficiency standards, renewable energy, demand response, and limits on diesel generators, but it does not impose those requirements on data centers now (the study’s topics). The study could lead to future rules, but this measure itself creates no meaningful barrier or benefit to building or operating data centers.

People behind it

  • Sponsor of the bill and committee that introduced it.

  • Co-sponsor of the bill.

  • Responsible for conducting the study and submitting its report.

Show 2 more peopleShow fewer people
  • Designated to consult on the study.

  • Designated to consult on the study.

Sources

failed · Statewide
Would have required state agencies to study the energy and environmental impacts of large data centers connected directly to power plants rated at 50 megawatts or more; the bill did not become law.Connecticut 2024 amendment to HB 5469, An Act Concerning Data Centers

What this means

The measure requires agencies to study certain large data centers and report their findings, but it does not add approval requirements or restrict construction or operation. The study applies to centers directly connected to a power plant rated at least 50 megawatts (study scope).

People behind it

  • Introduced the bill and reported it joint favorable.

  • Offered Senate Amendment Schedule A, LCO No. 5469, which replaced the bill's original provisions.

  • Co-sponsored the bill.

Show 7 more peopleShow fewer people
  • Co-sponsored the bill.

  • Co-sponsored the bill.

  • Assigned, with the Department of Economic and Community Development, to study the specified impacts of large data centers and report the results.

  • Assigned, with the Department of Energy and Environmental Protection, to study the specified impacts of large data centers and report the results.

  • Required to consult on the study under the amended measure.

  • Required to consult on the study under the amended measure.

  • Required to consult on the study under the amended measure.

Sources

failed · Statewide
Requires state agencies to study how large data centers directly connected to power plants of at least 50 megawatts could affect grid reliability, clean-energy goals, and energy affordability and supply.Connecticut SB 299 (2024)

What this means

The measure would require a study of large data centers’ effects on electric-grid reliability, but it does not make the study a condition for construction or operation (initiate an uncontested proceeding). It could inform future policy, but creates no direct restrictions, costs, or benefits for data center developers.

People behind it

  • Introduced SB-299.

  • Offered amendment LCO 5469, which replaced the bill’s original text.

  • Listed as a co-sponsor of SB-299.

Show 5 more peopleShow fewer people
  • Listed as a co-sponsor of SB-299.

  • Listed as a co-sponsor of SB-299.

  • The original bill assigned it to initiate a proceeding evaluating data centers’ impact on electric distribution system reliability; the amendment instead named it as a consultant.

  • The amendment assigned it, jointly with the Department of Economic and Community Development, to study specified impacts of certain large data centers.

  • The amendment assigned it, jointly with the Department of Energy and Environmental Protection, to study specified impacts of certain large data centers.

Sources

failed · Statewide
Would have barred new data-center tax-incentive applications starting July 1, 2026, but the bill did not pass.Connecticut SB 245 (2026)

What this means

The bill would stop new data center applicants from receiving the specified tax exemptions after July 1, 2026, raising costs for some future projects (applications could not be accepted after that date). It would not ban construction or add rules on operating data centers, so the impact is a meaningful financial hurdle rather than a broad restriction.

People behind it

  • Identified as the bill’s sponsor and introducing committee.

  • Listed as a co-sponsor.

  • Listed as a co-sponsor.

Show 5 more peopleShow fewer people
  • Listed as a co-sponsor.

  • Listed as a co-sponsor.

  • Listed as a co-sponsor on the bill status page.

  • Listed as a co-sponsor on the bill status page.

  • Listed as a co-sponsor on the bill status page.

Restrictions & requirementsHide restrictions & requirements1
  • Effective July 1, 2026, the state may not accept new applications for agreements granting qualified data centers exemptions from taxes under chapters 203 and 219, ending access to those incentives for new applicants. No such application may be accepted on or after July 1, 2026.

Benefits & exceptionsHide benefits & exceptions1
  • Allows prospective owners, operators, or colocation tenants of qualified data centers to apply for exemptions from taxes under chapters 203 and 219, but only if the application is accepted before July 1, 2026. The bill’s application deadline.

Sources

failed · Statewide
Would have required data centers with peak demand of at least 50 megawatts to meet new electricity-supply and ratepayer-protection requirements, but the bill did not become law.Connecticut HB 5469 (2026)

What this means

If enacted, the measure would make large data centers harder to build or operate by requiring covered suppliers to arrange new or added generation for the full expected load, plus a reserve margin, and by allowing long-term financial guarantees to protect other electricity customers (generation and reserve requirement; financial guarantees). These are substantial hurdles for projects with peak demand of 50 megawatts or more, though regulators could waive some requirements, so this is a significant barrier rather than a ban.

People behind it

  • Introduced the bill and was identified as its sponsor.

Restrictions & requirementsHide restrictions & requirements8
  • Beginning July 1, 2026, a provider serving a customer with peak demand of at least 50 MW through a behind-the-meter or other qualifying colocated arrangement would need a PURA colocated-supplier license. license to serve as a colocated electric supplier

  • Obtaining that license would require demonstrating technical, managerial, and financial capability, providing a bond or other security, filing an application and fee, and undergoing PURA review; an interested party could request a public hearing. technical, managerial and financial capability

  • A colocated supplier generally would have to provide 100% of the data center’s anticipated load, plus a PURA-set reserve margin, from generation entering service on or after July 1, 2026, or from qualifying incremental capacity added to an existing resource. PURA could waive some or all of this requirement only under specified ratepayer and energy-planning criteria. not less than one hundred per cent of the anticipated electric load

  • A colocated supplier would have to file annual reports describing its generation and the customer’s load, and comply with the state’s renewable portfolio requirements. For generation sources entering service on or after December 31, 2030, PURA could require additional renewable energy certificates if supported by the Integrated Resources Plan. File an annual report with the authority

  • Colocated suppliers would generally be subject to electric-supplier operating requirements, including applicable environmental, reliability, emergency-cooperation, and other licensing conditions. PURA could waive any of the specified conditions for colocated suppliers. the authority may, in the authority’s discretion, waive any of the requirements

  • For large-load customers interconnecting to the grid after October 1, 2026, a tariff would generally require generation covering 100% of anticipated load plus a PURA-set reserve margin, from a source entering service on or after July 1, 2026, that has not previously cleared an ISO-NE capacity auction. PURA could waive this generation requirement for a customer demonstrating sufficient demand flexibility; the tariff requirement excludes customers served by colocated suppliers. not less than one hundred per cent of the anticipated electric load

  • Under the grid-connected customer tariff, a new large-load customer would need financial guarantees to pay for at least 85% of its requested service for at least 10 years, plus deposits or other security sufficient to protect ratepayers if the project closes or uses less electricity than anticipated. not less than eighty-five per cent

  • A new large-load customer subject to the tariff would have to show that its project is unique and not duplicative of another large-load project, and identify the project’s interdependencies. project proposed by such customer is unique and not duplicative

Benefits & exceptionsHide benefits & exceptions4
  • The bill would recognize behind-the-meter and fully off-grid supplier-customer arrangements as “colocated electric suppliers” and create a PURA licensing route for providing power through them. Operation would still require a license. The definition covers behind-the-meter or unconnected arrangements

  • PURA could waive any of the standard electric-supplier licensing conditions for a colocated supplier, and could waive or modify specified penalties and payment requirements for renewable-portfolio-standard noncompliance. These are discretionary waivers, not automatic exemptions. PURA may waive licensing requirements

  • PURA could waive a colocated supplier’s requirement to provide new or incrementally expanded generation for 100% of the customer’s anticipated load plus a reserve margin, if the waiver is in ratepayers’ best interest and consistent with the state’s energy plans. The bill authorizes a conditional waiver

  • A grid-connected large-load customer not served by a colocated supplier could seek a waiver of the new-generation requirement by demonstrating enough demand flexibility to eliminate the need for that generation. PURA may waive the requirement based on demand flexibility

Sources