Loading map…

Town of Orange

Slightly Pro-Data Center Policies

Orange allows data centers in the Office Park District with site-plan approval, but minimum lot size and limits on height, setbacks, and coverage constrain where and how they can be built.

current law · Town of Orange
Allows data centers in Orange’s Office Park District, subject to site plan approval.Orange Zoning Regulations, Chapter 383 (Zoning)

What this means

The rule expressly allows data centers with site-plan approval, making them a permitted use in the district. However, lot-size, height, setback, and coverage limits constrain where and how they can be built, so the overall benefit is modest.

Restrictions & requirementsHide restrictions & requirements6
  • A data center in the Office Park District requires site plan approval. Permitted by site plan approval

  • A data-center lot must generally be at least five acres and have a minimum square dimension of 300 feet. Minimum lot area: five acres

  • Buildings are limited to four stories and 60 feet in height. Maximum height: 60 feet

  • Required setbacks are 50 feet from a street line, rear property line, or residence-district boundary, and 25 feet from other property lines. From street line: 50 feet

  • Maximum floor area and maximum ground coverage are each 20%. Maximum floor area: 20%

  • Outside storage and retail use are prohibited in the district. Outside storage

Benefits & exceptionsHide benefits & exceptions5
  • Data centers are expressly permitted in the Office Park District through site plan approval. “Data centers” are among the uses permitted by site plan approval.

  • Buildings may accommodate single or multiple tenants and two or more permitted or special uses; this does not allow a convalescent care or hospice use to be combined with other permitted or special uses on the same lot. Multi-tenant buildings and combined uses.

  • Customary accessory uses may include off-street parking and private garages, provided they are on the same lot as the use they serve. An Office Park District lot cannot provide access to a use permitted in a Commercial or Industrial District. Accessory-use standards.

  • A warehouse may be considered as a special use if it is accessory to a permitted or special use. Accessory warehouses.

  • A lot need not front on a public road if the Commission finds that proper and adequate access is available through shared access or driveway easements. Access by easement.

Sources

current law · Town of Orange
Allows data centers in Orange’s Office Park District with site plan approval, subject to the district’s lot size, height, setback, and building coverage limits.Orange Zoning Regulations, Chapter 383, Article XIB, § 383-96.10(D) (Data centers)

What this means

The measure makes data centers an expressly permitted use with site plan approval, creating a clear path to build them in the Office Park District. Development is still limited by rules such as a five-acre minimum lot and 20% maximum floor area and ground coverage, so the overall effect is a modest benefit rather than an unrestricted green light.

Restrictions & requirementsHide restrictions & requirements7
  • A data center requires site plan approval; it is not listed as a use allowed without that approval. Permitted by site plan approval

  • A lot generally must be at least five acres and have a minimum square dimension of 300 feet. Public-road frontage is not required if the Commission finds shared access or driveway easements provide proper and adequate access. Minimum lot area: five acres

  • Buildings are limited to four stories and 60 feet in height. Maximum height: 60 feet

  • Setbacks are required: 50 feet from a street line, rear property line, and residence district boundary, and 25 feet from another property line. From street line: 50 feet

  • Maximum floor area and maximum ground coverage are each limited to 20%. Maximum floor area: 20%

  • Outside storage and retail use are prohibited; manufacture, processing, or assembly of goods is also prohibited unless ancillary to a permitted or special use. Outside storage

  • A lot in the Office Park District cannot be used for access to a use permitted in a Commercial or Industrial District. No part of a lot

Benefits & exceptionsHide benefits & exceptions4
  • Data centers are permitted in the Office Park District through site plan approval; the district generally requires a minimum lot area of five acres. “Data centers”

  • A data center may be in a single- or multi-tenant building that contains two or more permitted or special uses. The exception barring combination with other uses applies to convalescent care or hospice facilities. “single and multi-tenant occupancy”

  • Customary, incidental accessory uses are allowed on the same lot as the permitted use; examples include off-street parking and private garages. “off-street parking spaces and private garages”

  • Public-road frontage is not required if the Commission finds proper and adequate access is available through shared access or driveway easements. “Frontage on a public road is not required”

Sources

Cookie preferences · Report missing data