City of Wylie

Anti-Data Center Policies

Wylie allows data centers in industrial districts, but those with at least 5,000 square feet per platted lot need a special permit, adding approval steps and costs, including a utility study and water-system requirements.

current law · City of Wylie
Restricts data centers to specified commercial and industrial zones, requiring special permits and, for larger developments, utility studies and water-service and closed-loop system requirements.City of Wylie Ordinance No. 2026-29 — Zoning Ordinance Land Use Amendments (ZC 2026-04)

What this means

The measure still allows data centers in industrial districts, but facilities with at least 5,000 square feet per platted lot need a special permit. That can add approval steps and costs, including a utility study and, for facilities with a special permit, water-system requirements, so the effect is a meaningful barrier rather than a ban.

People behind it

  • The ordinance states that the Council investigated the amendments and duly passed and approved the measure.

Restrictions & requirementsHide restrictions & requirements4
  • Data centers are listed only in the Commercial Corridor (CC) and Light and Heavy Industrial (LI and HI) districts; they are not listed as permitted uses in the other districts. Data Center

  • A Special Use Permit (SUP) is required in the Commercial Corridor district and for facilities with cumulative building area of 5,000 square feet or more per platted lot. SUP threshold

  • Developments with cumulative building area over 5,000 square feet must provide a utility study showing compatibility with existing city and franchisee infrastructure. Utility study requirement

  • Data centers subject to an SUP must provide a water-provider service letter and use a closed water-loop system. SUP requirements

Benefits & exceptionsHide benefits & exceptions2
  • Data centers are added as a listed use in the Commercial Corridor (shown as S) and Light and Heavy Industrial districts (shown as P*), creating zoning pathways for them in those districts. The ordinance expressly requires a Special Use Permit in the Commercial Corridor. Data Center

  • A size-based Special Use Permit requirement applies to facilities with cumulative building area of 5,000 square feet or more per platted lot; that threshold does not itself trigger an SUP for smaller facilities. The separate Commercial Corridor SUP requirement still applies. cumulative building area at or over 5,000 square feet per platted lot