The Data Center Divide

City of Victoria

Mixed Data Center Policies

Texas combines substantial, long-term sales-tax breaks for qualifying large data centers with grid-connection studies, fees, and infrastructure costs that can make projects slower and more expensive. Some large facilities may also face emergency power reductions or grid-stability requirements; the tax benefits have demanding eligibility conditions.

Rating and summary from Texas statewide as there are no scored current or future laws outside temporary restrictions for City of Victoria.

current law · City of Victoria
Binding municipal data-center standards, not a countywide rule.City of Victoria Unified Development Ordinance, Chapter 21, § 21-146(e) (as amended by Ordinance 2025-66 and subsequent 2026 amendments)

People behind it

  • Development Services Director presenting data-center revisions at third reading.

  • Moves third-reading approval.

  • Seconds the motion.

Restrictions & requirementsHide restrictions & requirements4
  • Maximum 55 decibels at any time as heard from any property line; specified low-frequency disturbances may not exceed ambient sound by more than 5 dBA at residential property lines.

  • Closed-loop or similar cooling must eliminate continuous fresh-city-water draw for cooling; open-loop evaporative cooling is prohibited.

  • At least 1,500 feet from residential uses, measured property line to property line.

  • Pre-permit acoustical analysis and independent compliance report ninety days after temporary certificate of occupancy; Water Management Plan and water-use effectiveness no more than 0.50 liters/kWh within three years of operation.