Loading map…

City of Tulia

Mixed Data Center Policies

Texas offers substantial tax breaks on equipment and electricity to large projects meeting investment and job requirements, while large grid connections face studies, fees, and possible emergency power cuts; some requirements apply only to very large loads.

Rating and summary from Texas statewide as there are no scored current or future laws outside temporary restrictions for City of Tulia.

failed · City of Tulia
Does not specifically regulate data centers; the C-2 district lists general commercial uses and requires site-plan approval for commercial projects.No Tulia data-center-specific regulation identified in available sources

What this means

In the C-2 district, uses are limited to those listed, and data centers are not named, so approval could be uncertain. A project would also face a 30-foot/two-story height limit, a floor-area cap equal to the lot area, and site-plan approval; these could add meaningful costs or limit designs. Only listed uses are allowed, 30 feet or 2 stories, floor area, site plan approval

Restrictions & requirementsHide restrictions & requirements7
  • In the C-2 district, land and buildings may be used only for R-1, R-2, or C-1 permitted uses or uses specifically listed for C-2. Data centers are not expressly listed. The permitted-use list

  • C-2 structures may not exceed 30 feet or two stories. No structure shall exceed 30 feet or 2 stories

  • C-2 lots must have at least 5,000 square feet of area and 50 feet of width. There are ordinarily no front, rear, or side setback requirements, but a side yard abutting an R-1 or R-2 district must meet that district’s minimum side setback, and a side yard next to a side street must be at least 10 feet. C-2 lot and setback requirements

  • A site plan must be submitted to and approved by the building official before a zoning permit is issued for a commercial or multiple-family use or structure in C-2. Site plan approval before a zoning permit

  • The total floor area of buildings on a C-2 lot may not exceed the lot’s square footage. Floor-area limit

  • Previously existing or used structures, including accessory buildings, may not be moved onto and installed in C-2. Restriction on moving existing structures

  • C-2 buildings must be newly constructed of wood frame, metal frame, concrete, or masonry, either built on site or prefabricated and moved on site, and must meet city-adopted building, plumbing, electrical, and fire codes. Accessory buildings also must be affixed to the real estate and meet those codes. Building and accessory-building requirements

Sources

Cookie preferences · Report missing data