City of Terrell Hills

Mixed Data Center Policies

Texas offers substantial tax breaks on equipment and electricity to large projects meeting investment and job requirements, while large grid connections face studies, fees, and possible emergency power cuts; some requirements apply only to very large loads.

Rating and summary from Texas statewide as there are no scored current or future laws outside temporary restrictions for City of Terrell Hills.

failed · City of Terrell Hills
Establishes general zoning and permitted-use rules but contains no data-center-specific regulations.No data-center-specific municipal regulation identified

What this means

The rules limit land uses by zoning district, and data centers are not among the listed uses for the limited commercial districts, creating a significant obstacle to finding an allowed location (commercial uses). Building also requires permits and plans, but the rules do not specifically address data centers, so the exact effect depends on how the city classifies them (permit requirements).

People behind it

  • Responsible for implementing the ordinance’s provisions.

  • Responsible for administering and enforcing the zoning regulations.

Restrictions & requirementsHide restrictions & requirements7
  • Zoning limits buildings and land to uses permitted in their district. The B district lists residential, multifamily, and office uses (with limits on merchandise sales); the C district lists specified commercial uses. Neither section expressly names data centers, so a data center’s eligibility is not established by these lists alone. District use limits C-district permitted uses

  • Construction requires a building permit before excavation or construction. The application must include a scaled plat and written plans and specifications sealed by a Texas-licensed architect or professional engineer; foundation plans must be sealed by a licensed professional engineer. Permit and plan requirements

  • A building cannot be used, occupied, or changed to a new use until the building inspector issues a certificate of occupancy and compliance. The application is due with the building-permit application, and issuance follows completion in conformity with the applicable requirements. Certificate required before use

  • In B and C districts, new buildings must meet district setbacks: both require a 25-foot front yard and side clearance of at least 20 feet from a side-street property line and 10 feet from other specified lot lines; B requires a rear yard of 20% of lot depth, capped at 25 feet, while C requires 25 feet. B-district setbacks C-district setbacks

  • If a project requires a zoning change, the application goes through planning and zoning commission review and public hearings before council action. An application to rezone the same property cannot be filed within one year after the council denies a rezoning request; certain protests or commission disapproval require a three-fourths council vote for the change to take effect. Zoning-change procedures and voting threshold

  • If a project subdivides land, it generally requires plat approval. Preliminary plats must be submitted at least 10 days before the commission meeting; a final plat must be submitted within six months after preliminary approval, or that approval expires. Required improvement plans and engineering calculations, and applicable performance or maintenance security, can add project requirements and costs. Platting deadlines and requirements

  • Violations of the zoning article can result in a misdemeanor fine of up to $100, with each day a violation continues treated as a separate offense. Violation penalties

Benefits & exceptionsHide benefits & exceptions5
  • Certain amending plats, minor plats or replats may be approved by the city manager without further action by the planning and zoning commission or city council. The minor-plat route is limited to four or fewer lots on an existing street and projects that do not require a new street or extension of municipal facilities. City manager authority to approve

  • A qualifying subdivision may use a short-form platting procedure that omits the preliminary plat, if its lots front on a previously dedicated street, require no new streets, alleys, easements or public property, have utilities and drainage in place without alterations, and pass staff review. Short form procedure

  • A final plat is considered approved by the planning and zoning commission unless it is disapproved within 30 days after filing with the city secretary. Act on the final plat within 30 days

  • A building actually under construction with a building permit when the article is passed, and completed within one year, does not have to change its plans, construction or designated use because of the article. Later zoning amendments also do not affect existing buildings or premises, buildings under construction, or permits already issued. Existing buildings and permits

  • A lawful use that does not conform to the zoning rules may continue, subject to reasonable conditions for protecting adjacent property; if the use is discontinued, future use must conform. Lawful use may be continued