San Elizario’s zoning rules do not specifically address data centers, and unlisted uses are prohibited; some industrial uses may apply, leaving uncertainty that could require review or cause delays.
current law · City of San ElizarioRestricts data-center development through general zoning rules, but does not establish any data-center-specific standards.San Elizario zoning ordinance
What this means
The ordinance does not name data centers, and says uses not specifically permitted are prohibited. But the industrial district allows some potentially related activities, so a data center might fit an existing category; uncertainty could mean extra review or delay, not a clear ban.
People behind it
- Maya Sanchez
Listed as responsible for the agenda item on approving the timeline for public hearings and adoption of the comprehensive plan and zoning ordinance.
- Zoning Administrator
Responsible for administering and enforcing the zoning ordinance.
Restrictions & requirementsHide restrictions & requirements6
The ordinance does not expressly list data centers as a use. It prohibits uses not specifically allowed by right or by conditional use permit, so a data center would need to be classified under a listed use to determine whether it is allowed. Any use not specifically permitted
If a data center is classified as a conditional use in its zoning district, it requires a conditional use permit and a public hearing; approval requires a 75% concurring vote of the Board of Adjustment. The Board may impose conditions, and the permit generally expires if the use does not begin within the specified time or, if none is specified, within two years; it also terminates after the use ceases for two years. A concurring vote of 75%
If the proposed use requires a zoning change, the ordinance requires public-hearing and notice procedures. A proposed change may require a three-fourths City Council vote if the Planning and Zoning Commission recommends denial or a qualifying protest is filed; after denial, the same matter generally cannot be reconsidered for six months absent a substantive change in conditions. three-fourths (3/4) vote
In the Industrial District, operations must meet limits on emissions and dust crossing property lines, odors, toxic or noxious matter, vibration, and glare or direct illumination across property lines. No use shall be located or operated
A building cannot be used, occupied, or changed to a new use until the City issues a certificate of occupancy confirming compliance with the building code and zoning ordinance. No building hereafter erected
For a facility located in the Industrial District, the district standards include a one-acre minimum lot area, 60-foot front yard, 50-foot side yard, 10-foot rear yard, 60% maximum lot coverage, and 65-foot maximum structure height. Minimum lot area 1 acre