City of Round Rock
Pro-Data Center Policies
Round Rock’s enacted ordinance allows a data center and its related substation on separate parcels at a specific 57-acre site and removes minimum parking requirements, while retaining design, security-wall, and landscaping conditions.
current law · City of Round Rock; the 57.15-acre property governed by PUD No. 155Allows a data center on a designated 57-acre Round Rock site, with a supporting electric substation, and sets site-specific rules for its design, security, and landscaping.Chisholm Planned Unit Development (PUD) — data center zoning ordinance
What this means
The measure would expressly allow data centers on one parcel and a related electric substation on another, creating a clear path to develop the 57.15-acre site. It also removes minimum parking for data centers, though building design, security-wall and landscaping rules add conditions; overall, this is a meaningful but site-specific benefit.
People behind it
- City Council
Approved the ordinance rezoning the property as PUD No. 155. The ordinance was approved.
- Craig Morgan
As mayor, was authorized and directed to enter into the PUD No. 155 Development Plan. The Mayor is hereby authorized and directed.
Restrictions & requirementsHide restrictions & requirements6
Data centers are permitted only in Parcel Area 1. Parcel Area 2 may have a primary electric substation only in conjunction with a data center in Parcel Area 1; Parcel Area 3 does not list data centers as a permitted use. Uses not specifically covered by the plan are subject to C-1a zoning, rather than the former C-1 district. The permitted uses are assigned by parcel area.
Data center buildings facing IH-35 must incorporate at least three listed design features, change wall planes and exterior finish at intervals no greater than 80 feet, and have no overhead doors facing IH-35. No overhead doors shall face IH-35.
Data center structures must be enclosed within a perimeter wall or fence. Walls must meet specified finish, material, and sight-line requirements and be 8 to 20 feet high; decorative view fencing is allowed only under stated conditions, including screening mechanical yards and substations with qualifying walls. Structures shall be entirely contained within a perimeter wall or fence.
When Parcel Areas 1 or 2 are developed for data center or substation use, landscaped buffers at least 8 feet wide must be installed where shown on the concept plan, with planting quantities and, for some buffer types, evergreen-species requirements. Buffers that measure at least eight (8) feet wide.
If Parcel Area 2 is developed as an electric substation, Monarch Tree #960 may be removed without a separate Council request only with required mitigation and preservation of trees #963 and #964. The special removal permission does not apply if Parcel Area 2 is developed for C-1a uses. Tree # 960 may be removed.
Plan changes beyond the limited minor-change authority must follow the original PUD application procedure. Minor changes may be approved administratively up to 10% of a numerical standard, but changes in land use, density, building height, or site coverage—and certain other listed changes—cannot use that route. All changes not permitted above shall be resubmitted.
Benefits & exceptionsHide benefits & exceptions7
Parcel Area 1 expressly allows a data center, alongside uses permitted in the C-1a district. “Data Center”
Parcel Area 2 allows a primary electric substation when established in conjunction with a data center on Parcel Area 1; C-1a uses are also allowed there. “in conjunction with a Data Center Use”
For zoning and subdivision, the property is governed by the PUD, and its terms control where they conflict with the City Code; matters not specifically covered default to C-1a rules. “this Plan shall supersede”
No minimum parking is required for data center use or for a primary electric substation. “no minimum parking shall be required”
For data center and/or electric-substation development on Parcel Areas 1 and 2, the PUD waives interior parking-lot landscaping, parking-lot landscape buffers, and foundation treatment. “shall not be required”
If Parcel Area 2 is developed as an electric substation, Monarch Tree #960 may be removed without a separate City Council request, provided required mitigation is supplied and trees #963 and #964 are preserved. This allowance does not apply if Parcel Area 2 is developed for C-1a uses. “may be removed without separate City Council request”
The Planning and Development Services Director may administratively approve minor plan changes, including adjustments to site layout, building configuration, driveways, and project phasing, up to 10% of a numerical standard. This route excludes, among other things, changes in land use and increases in density, building height, or site coverage; other changes must follow the original PUD procedure. “administratively approve a minor change”