City of Quinlan
Neutral Data Center Policies
Quinlan’s zoning ordinance does not specifically address data centers, so the City Council may need to decide where they are allowed. Building permits and a certificate of occupancy are required.
current law · City of QuinlanRegulates data centers only under general zoning and land-use rules; it does not specifically mention or regulate data centers.Quinlan Zoning Ordinance (Exhibit 14A)
What this means
The ordinance does not specifically ban or target data centers, but because that use is not listed, the City Council may need to decide which zoning districts allow it (new or unlisted uses). Building permits and a certificate of occupancy are also required (permits and certificates). These are modest potential delays, with no data-center-specific incentives or protections.
People behind it
- City Council
Introduced, passed, and approved the ordinance adopting the revised zoning rules and regulations.
Restrictions & requirementsHide restrictions & requirements8
Only uses listed for a zoning district are allowed. A new or unlisted use is referred by the Building Inspector to the City Council for classification by resolution, with the Council considering its nature and compatibility with district uses. The ordinance does not specifically name data centers, so this provision does not itself ban them. Districts may be used only for listed uses and unlisted uses go to the City Council.
Permanent structures require a building permit before construction and a certificate of occupancy before occupancy; a change to a different use classification also requires a certificate of occupancy. Building plans are reviewed, and foundation, plumbing, electrical, and framing inspections occur before the occupancy certificate. Permit and occupancy requirements.
If a proposed use is authorized in its district only by Specific Use Permit, the City Council must hold a public hearing and may impose conditions that must be met before a certificate of occupancy is issued. The application must include a scaled site plan and specified project information. SUP public hearing and site-plan requirements and Council may impose conditions.
In I-1, most business, service, and processing activity must occur in enclosed areas; uses are subject to limits on dust, fumes, odor, smoke, glare, noise, and fire hazards, and nearby storage must be enclosed or screened. In I-2, manufacturing and processing must meet specified environmental and performance standards, including a property-line noise limit of 75 dB(A) for no more than 15 minutes in any hour. These requirements apply if the use is allowed in the relevant district. I-1 operating and screening conditions and I-2 performance standards.
A Planned Development district requires at least 3 acres and Council approval of a conceptual plan and development plan. A public hearing is generally required for the development plan, though it may be waived in specified circumstances; an initial development plan must be submitted within 6 months after conceptual-plan approval or the conceptual plan is subject to reapproval. PD minimum acreage and plan requirements and plan timing and hearing provisions.
In an FP flood-plain area, permitted uses are limited to those specified in the ordinance. A building or structure cannot be erected there until the City Council approves it after engineering studies determine it will not be subject to flood damage or obstruct floodwaters or endanger people or property. Limited FP uses and approval and engineering-study requirement.
If a project requires a zoning change, the City must hold a public hearing; owners within 200 feet receive written notice at least 10 days beforehand, and the hearing notice must be published at least 15 days beforehand. A zoning change cannot be granted until after the 30th day following the required owner notice. A protest meeting the stated 20% threshold requires a three-fourths Council vote for the change to take effect. Hearing and notice requirements and 30-day and protest-vote provisions.
Projects must meet the lot-area, yard-setback, height, lot-coverage, and other dimensional standards for their zoning district, subject to the ordinance’s stated qualifications and the separate PD standards. District dimensional schedule.
Benefits & exceptionsHide benefits & exceptions3
The Planned Development (PD) district allows a mix of uses and flexibility in land and building design, with standards set in the approval ordinance. A PD requires at least three acres, and its uses and plans require City Council approval. Flexibility in the use and design of land and buildings
If a data center use is not listed, the Building Inspector refers it to the City Council, which determines the appropriate zoning district based on the proposed use and its compatibility with district uses. A determination as to the appropriate classification
A lawful use that becomes nonconforming may generally continue, but it cannot expand beyond the lot or tract it occupied when the ordinance took effect, except for approved off-street parking. Nonconforming rights cease if the use is abandoned. A nonconforming use may be continued