City of Oak Point
Anti-Data Center Policies
Oak Point requires most non-single-family projects to obtain site-plan approval and meet landscaping, open-space, parking, and design rules, adding time and cost. The available text does not establish where data centers are allowed.
current law · City of Oak PointRequires proposed data centers to follow applicable zoning and site-plan rules, but contains no data-center-specific requirements.Oak Point Zoning Ordinance, Chapter 14, Exhibit 14A
What this means
The ordinance does not specifically address data centers, but non-single-family projects generally need site-plan approval and must meet requirements for landscaping, open space, parking, and building design, adding cost and time (site-plan approval required; 7% open space). The permitted-use table is not included here, so the document alone cannot establish where data centers would be allowed; overall, the general requirements are a meaningful but not clearly prohibitive burden.
Restrictions & requirementsHide restrictions & requirements14
A data-center use must be permitted in its zoning district or specifically authorized by a Planned Development ordinance; uses not listed in the permitted-use table are classified by the Planning and Zoning Commission. The supplied ordinance does not establish whether data centers are permitted in any particular district. Only uses specified as permitted may be established.
A Special Use Permit may be required for an otherwise unpermitted use. The application is due at least 30 days before the Planning and Zoning Commission meeting, requires public hearings, notices and property signs, and the permit generally expires after one year unless a building permit is obtained and construction started or the use begins. Significant alterations require a separate permit. The City Council may grant a Special Use Permit.
A zoning change requires Planning and Zoning Commission review and recommendation before City Council action, public hearings, and advance notice; signs must be posted at least 21 days before the Commission hearing. A written protest by owners of at least 20% of specified nearby or affected land requires a three-fourths Council vote. A request denied with prejudice cannot be resubmitted for six months. No zoning request may be acted on before Commission recommendation.
Non-single-family uses require City approval of both a Concept Plan and a Development Plan before building permits. Applications are due 30 days before the relevant Commission meeting; public hearings are required, and building permits may be submitted for no more than one year after Development Plan approval. All uses, with the exception of single-family residential, shall require review and approval of a Site Plan.
Non-single-family buildings must use masonry as the primary exterior material; secondary materials are limited to 20% of a facade, excluding doors and windows. All exterior facades shall be constructed of masonry as their primary construction material.
Non-single-family buildings are subject to architectural design rules, including articulation of at least 60% of a facade facing a public right-of-way. Mechanical equipment and satellite dishes must not be visible from a public right-of-way, and ground-mounted service and mechanical equipment must be at the rear and integrated into structural bays or enclosed service areas. A minimum of 60% of the length of a building facade.
Non-single-family developments must provide off-street parking. Warehouse, wholesale, manufacturing, and other industrial-type uses require one space per 1,000 square feet; for unlisted uses, the City Manager or designee reviews or determines the parking ratio using current planning and transportation practices. Warehouse, Wholesale, Manufacturing and Other Industrial Type Uses.
Nonresidential developments must provide 7% of net lot area as qualifying open space. If developed under a Planned Development, nonresidential uses have a separate 10% common-open-space requirement, which the City Council may reduce in specified circumstances. 7% of the net lot area shall be provided as open space.
Nonresidential developments must provide and maintain screened off-street loading areas, each at least 12 by 30 feet. The required number depends on use and floor area: generally one plus another per 40,000 square feet or fraction for hotels, offices, restaurants, and similar uses, and one plus another per 20,000 square feet or fraction for other commercial uses. A service area shall consist of an area at least 12 feet by 30 feet.
A non-single-family or nonresidential use adjacent to a residential use must provide a continuous solid visual screen 6 to 8 feet high. Screening is also required for service or loading areas visible from specified public or residential locations and for open storage in non-single-family districts. A continuous unbroken and solid visual screen.
A Certificate of Occupancy is required before occupancy or use of a newly erected or structurally altered building, and for a change in use; it cannot be issued until the work or proposed use conforms to City ordinances. No certificate shall be issued until the completed construction or alteration conforms.
If a data-center use or structure is legally nonconforming, it may not be expanded beyond the lot or tract, and the size or function of a nonconforming use may not be expanded. Abandonment for at least six months ends nonconforming rights; a nonconforming structure destroyed by more than 60% of its reasonable value generally cannot be rebuilt except in conformity. The size or function of the nonconforming use shall not be expanded.
A Planned Development request for nonresidential development must cover at least five acres. The district’s permitted uses and development requirements must be specified in its approving ordinance. The minimum acreage for a PD district request shall be five (5) acres for nonresidential development.
Violations may result in a fine of up to $2,000, with each day of violation treated as a separate offense; the City may also seek an injunction. each and every day that the provisions of this Ordinance are violated.
Benefits & exceptionsHide benefits & exceptions2
The City Council may grant a Special Use Permit for an otherwise unpermitted use. The application requires public hearings and is subject to conditions; the permit generally expires after one year unless a building permit is obtained and construction starts, or the use begins, during that period. The City Council may grant a Special Use Permit.
A Planned Development district can specify permitted uses and development requirements, allowing flexibility to combine uses or modify ordinary zoning provisions. A nonresidential PD request must cover at least five acres; the City must approve its governing ordinance and plans, and the district must meet the ordinance’s purpose and other stated limits. A PD district may combine and mix uses.