City of Muleshoe
Neutral Data Center Policies
Muleshoe’s enacted rules limit shipping containers to storage and require permits and follow siting rules, effectively blocking container-based data centers. Ordinary-building data centers are largely unaffected.
current law · City of MuleshoeRegulates temporary and permanent shipping and storage containers citywide, but does not specifically target data centers.Shipping, Cargo, and Storage Containers regulation (Ordinance O-558-0526; Muleshoe Code, Article 3.09)
What this means
Data centers built in ordinary buildings are largely unaffected. Container-based data centers would face permits and siting rules, and the ordinance says containers may only be used for storage, which would block their use to operate a data center; the overall impact is limited because it applies only to container-based facilities.
People behind it
- City Council of the City of Muleshoe
Identified as seeking regulations and as the body that ordained and adopted the ordinance; the ordinance states that the City Council desires to provide regulations.
Restrictions & requirementsHide restrictions & requirements5
For projects using shipping, cargo, or non-steel storage containers, the ordinance requires an active building permit. Temporary permits may last no more than 180 days. The fee is $35 minimum plus $0.12 per square foot.
Containers may be used only for storage; human habitation is prohibited. This restriction applies to both temporary and permanent container use.
Permanent containers must have a foundation and a pre-designed anchoring system approved by the city, and must comply with setbacks. They must be behind the primary structure and in the rear half of the property; stacking is prohibited.
Permanent containers may not be used to store hazardous materials or refuse or debris, and must be secure, structurally sound, stable, in good repair, and painted a neutral color.
Temporary containers must be on private property, outside city rights-of-way, and must not obstruct neighboring properties. They must be painted a neutral color. If electricity is installed, the city department must be informed and tie-downs are required.