City of Lancaster

Pro-Data Center Policies

Lancaster city allows data centers on the designated property, with buildings up to 110 feet, subject to site-plan approval and parking, landscaping, and design requirements.

current law · City of Lancaster
Allows data centers on a 99.981-acre site in Lancaster, subject to specific limits on building height, parking, landscaping, and design.Ordinance for Zoning Case Z24-9 (99.981-acre data-center Planned Development)

What this means

The measure would make data centers a permitted use on the property, a substantial benefit for building and operating them (“Data Center P”). It also allows buildings up to 110 feet, but requires site-plan approval and sets parking, landscaping, and design rules, so the benefit comes with practical conditions (“maximum building height is 110 feet”).

People behind it

  • Project applicant on whose behalf Kimley-Horn submitted the initial planned-development application.

  • Applicant whose tract was added through a supplemental planned-development application.

  • Prepared and submitted the planned-development application packages on behalf of the applicants.

Show 1 more peopleShow fewer people
  • Kimley-Horn senior vice president who signed the application letters submitting the proposals.

Restrictions & requirementsHide restrictions & requirements11
  • A data center requires an approved PD site plan before a building permit can be issued; sites larger than 10 acres require Planning and Zoning Commission approval. PD site plan approval

  • At the site-plan stage, City staff may require preliminary drainage and utility studies or a traffic impact analysis. Studies may be required

  • Data-center development must generally conform to the concept plan, with detailed building, substation, parking, drive, and access layouts addressed in the later site plan. generally conform to the Concept Plan

  • Development is subject to dimensional limits: building coverage up to 70%, impervious cover up to 80%, at least 20% landscaping and open space, setbacks of 25 feet at the front, interior side, and rear and 50 feet at a street side, and a maximum height of 110 feet above adjacent constructed grade. FAA rules may further restrict height. Dimensional standards

  • Exterior walls must meet specified material and glazing standards: the regulation requires masonry on exterior wall surfaces (excluding doors and windows), limits cementitious fiberboard to 50%, and requires 20% glazing or spandrel glass along Pleasant Run Road or Cornell Road, whichever has the primary public entrance. The City Council may allow case-by-case exceptions to the material requirement upon approval of elevations. Building-material and glazing standards

  • Walls facing a public right-of-way must meet horizontal and vertical articulation standards; the Planning and Zoning Commission may allow exceptions to those standards when reviewing an elevation as part of a site plan requiring its approval. Facade articulation requirements

  • Data centers must provide at least one parking space per 3,000 square feet of first-floor employee-accessible building area or one space per two employees, whichever is fewer. The Director of Planning or designee may modify the requirement based on an occupier parking study, such as one based on employee shifts. Data-center parking requirement

  • Substations, switching stations, and mechanical equipment adjacent to or visible from a right-of-way must be screened with a 6-to-8-foot masonry wall. Screening requirement

  • Detention ponds visible from a right-of-way must be screened with one tree per 1,000 square feet of pond area; other landscaping must follow the Logistics Port Port Industrial standards. Owners are responsible for maintaining required landscaping, and dead plant material must be replaced within 60 days. Landscaping requirements

  • Temporary uses related to construction and development require a building permit. Temporary uses will require a building permit

  • Violations are misdemeanors punishable by a fine of up to $2,000, with each day a violation continues treated as a separate offense; the City may also seek an injunction. Penalty clause

Benefits & exceptionsHide benefits & exceptions7
  • The 99.981-acre property is rezoned as a planned development, and the use table permits data centers by right. Data Center P

  • Data center buildings may be up to 110 feet tall above adjacent constructed grade, subject to possible FAA restrictions. maximum building height is 110 feet

  • Data centers have a tailored parking minimum: one space per 3,000 square feet of first-floor employee-accessible area or one per two employees, whichever requires fewer spaces. The Planning Director or designee may modify the requirement based on an occupancy study, such as employee shift counts. whichever is lesser

  • For data center development, building and substation footprints may be located anywhere within the concept plan, and parking, drives, access points, and other internal infrastructure may be adjusted to serve the development. These changes remain subject to the required PD site plan. may be located anywhere on the Concept Plan

  • Detailed site planning is deferred until the PD site-plan stage; a site plan must be approved before a building permit, and must be approved if it demonstrates compliance with applicable city regulations. Preliminary drainage and utility studies or traffic-impact analyses may still be required, and sites over 10 acres require Planning and Zoning Commission approval. shall be approved if it demonstrates compliance

  • Electrical substations are allowed as accessory uses, and the data-center definition includes ancillary infrastructure such as electrical substations. Substations, switching stations, and mechanical equipment adjacent to or visible from a right-of-way must be screened with a 6- to 8-foot masonry wall. Electrical Substation Accessory use only

  • Temporary construction-related uses—including construction yards and trailers, portable buildings, and asphalt or concrete batch plants—are allowed; temporary uses require a building permit, and portable buildings cannot be primary uses. temporary uses related to construction and development