Mixed Data Center Policies

Hutto’s enacted rules allow data centers in heavy-industrial areas with some relaxed parking and height limits, but projects remain restricted to those areas and may need extra approval or more land for home buffers.

Rating from Texas statewide as there are no scored current or future laws outside temporary restrictions for City of Hutto.

current law · City of Hutto
Sets rules for where data centers can be built and how they must be designed, including limits on height, building placement, buffering, parking, and loading.Unified Development Code § 10.308.18, Data Center (Ordinance O-2024-007; codified in Hutto UDC)

What this means

The measure would make data centers easier to build in heavy-industrial areas and ease some parking and building-height rules. But projects remain limited to industrial areas, some still need extra approval, and larger buffers from homes can require more land, so the overall benefit is modest.

Timing

Ends
Upon final disposition, with a maximum duration of six months from the first public notice.

Building permits will not be issued for proposals that would violate proposed code text or map amendments pending before the Commission. The restriction ends upon final disposition or after six months from the first public notice, whichever comes first.

People behind it

  • Adopted the Unified Development Code as a city ordinance.

  • Administer, interpret, and enforce the Code.

  • Administers Chapter 7 of the Code.

Show 1 more peopleShow fewer people
  • Administers and implements the Code’s floodplain provisions.

Restrictions & requirementsHide restrictions & requirements14
  • Data centers are limited to LI and I districts under the UDC, which requires a Planning and Zoning Commission recommendation and City Council approval. A council-meeting account instead says they may be permitted by right in heavy-industrial areas and require conditional approval in light-industrial zones.

  • Height limits are described differently: the UDC lists a 120-foot maximum for data centers, while a council-meeting account says data-center buildings in light-industrial zones are subject to a 60-foot limit.

  • I-district land may not be designated on tracts abutting residential neighborhoods or designated or planned arterial roads, restricting where data centers may locate in that district.

  • Industrial or light-industrial development next to residential-zoned property must provide a buffer yard at least 1.5 times the maximum building height allowed in the district or 1.5 times the industrial use’s height. The described buffer requirements also include an 8-foot masonry wall and specified landscaping.

  • New non-residential structures and major additions require site plan review, and construction requires a building permit conditioned on compliance with applicable regulations and, where applicable, site plan approval.

  • Industrial building design standards govern materials and colors, façades, and screening of mechanical and utility equipment. These standards do not apply to industrial structures over 200,000 square feet.

  • A traffic study may be required for development projected to generate at least 100 peak-hour vehicle trips. A Traffic Impact Analysis is required for specified applications generating more than 2,000 average daily trips; the City may require updates or an independent licensed traffic engineer.

  • Operations may not cause electrical or radio-frequency disturbance that adversely affects nearby equipment, excessive light or glare across property lines, or offensive odors perceptible at the property line. Storage, use, and handling of hazardous substances or waste are prohibited.

  • Road-adequacy requirements may require rights-of-way and thoroughfare dedication or improvements, including proportional work on adjacent or substandard roads. Development approval may be conditioned on phasing or delaying development, reducing its intensity, constructing improvements, or participating in excess costs.

  • Drainage systems must meet design and construction standards, with certified engineering computations showing no adverse downstream impact from a 100-year event. Detention must not increase peak runoff at discharge points for the 2-, 10-, 25-, and 100-year storms.

  • Subdivision construction plans must include a comprehensive grading plan, and disturbed areas must be permanently stabilized; the City Engineer may require additional erosion controls or permanent cover.

  • Development in special flood-hazard areas requires a permit and must meet flood-resistance standards. Where base flood elevation data is provided, nonresidential structures must be elevated to that level or meet specified floodproofing standards; floodway encroachments are prohibited unless engineering analysis shows no increase in flood levels. Subdivision proposals exceeding 50 lots or five acres, whichever is less, must generate base flood elevation data and provide adequate drainage and flood-resistant utilities.

  • Water and wastewater systems must comply with City utility criteria, standard details, and applicable TCEQ criteria. Plans must be prepared by or under the supervision of a registered professional engineer, and variations require utility approval.

  • In the Old Town zoning district, specified exterior changes to structures in a historic district or with designated or pending historic designation require a certificate of appropriateness. Covered work includes visible changes to contributing structures, additions, demolition or relocation, and new detached structures; ordinary in-kind repair is exempt.

Benefits & exceptionsHide benefits & exceptions12
  • Data centers are listed as a distinct use in the LI and I industrial districts. The UDC describes them as conditional, requiring a Planning and Zoning Commission recommendation and City Council approval; the council presentation instead says they may be permitted by right in heavy-industrial areas, while light-industrial proposals require further approval. The approval status in heavy industrial is therefore described differently in the sources.

  • The UDC allows data centers to reach 120 feet, subject to its criteria for industrial uses. The council presentation separately describes a 60-foot limit for light-industrial projects, increased from 45 feet; next to residential uses, that increase requires larger buffers, including a height-related setback, an eight-foot masonry wall, and landscaping.

  • Data centers have a reduced parking standard of one space per 5,000 square feet. The council presentation also states a maximum of 2,500.

  • Industrial architectural design standards do not apply to industrial structures larger than 200,000 square feet.

  • The code establishes vested development rights with approval-specific starting dates and expiration periods. For example, a building-permit right is dated from a complete application and expires after 180 days, while site-plan approval expires after one year.

  • A legally established nonconforming use may continue, and the right runs with the land. A nonresidential nonconforming use may expand by up to 20% in gross floor area, but cannot be reestablished if discontinued for 12 consecutive months or 18 months over three years.

  • A road improvement may count as adequate if it is included, funded, and approved in a two-year public capital plan. It may also qualify in a three-to-five-year plan if the applicant agrees to phase development to match the schedule.

  • The City may share the cost of required road improvements to achieve proportionality. The property owner pays initially, and the City's agreed share is reimbursed when funds become available.

  • At the City's sole discretion, required road dedications or improvements may be deferred to a later development stage under an agreement specifying their amount and timing.

  • At the City's sole discretion, an applicant may offer an equivalent cash contribution instead of road dedications or improvements; accepted funds must be earmarked for the specified improvements.

  • The City may aggregate improvement costs across affected roads or intersections and require improvements to only some of them.

  • An applicant may appeal road-adequacy conditions as not roughly proportional to the development's traffic impacts. The City Council may waive requirements that are not roughly proportional.

Sources

pending · City of Hutto
Does not impose data-center-specific rules; it replaces Hutto’s general development code.Ordinance No. O-2026-057, Unified Development Code repeal-and-replace amendments (data-center provisions and standards refinement direction)

What this means

The code has no data-center-specific ban or incentive, but general development rules could modestly raise costs or affect site design: it calls for shorter blocks and more street connections and sets development standards for infrastructure. More flexible parking rules may offset some burden, so the likely net effect is small rather than a major barrier.

People behind it

  • Named with the proposed ordinance replacing the Unified Development Code. Agenda attribution

  • Identified on the agenda for the proposed strategic partnership agreement amendments and the signs ordinance. Agenda attribution

  • Named with proposed investment and fiscal policies, budget amendments, and the preliminary bond-offering memorandum resolution. Agenda attribution

Show 7 more peopleShow fewer people
  • Named with the resolution to accept the Hutto Lake Playground infrastructure improvements. Agenda attribution

  • Named with the resolution authorizing execution of FY 2027 outside-agency funding agreements. Agenda attribution

  • Named with proposed municipal-services and development-agreement measures and the resolution waiving annexation fees. Agenda attribution

  • Named with the sales-tax audit discussion and the proposal to seek a three-vehicle Tesla Cybertruck test. Agenda attribution

  • Named with the proposal to bring back a three-vehicle Tesla Cybertruck test. Agenda attribution

  • Named with the discussion of cost estimates and long-term planning for a city-owned fire department. Agenda attribution

  • Named with the street-closure signage discussion and the sales-tax-sharing agreement measure. Agenda attribution

Sources

Cookie preferences · Report missing data