City of Hunters Creek Village

Mixed Data Center Policies

Texas offers substantial tax breaks on equipment and electricity to large projects meeting investment and job requirements, while large grid connections face studies, fees, and possible emergency power cuts; some requirements apply only to very large loads.

Rating and summary from Texas statewide as there are no scored current or future laws outside temporary restrictions for City of Hunters Creek Village.

failed · City of Hunters Creek Village
Limits land uses to those allowed in residential or business districts; it does not specifically mention or regulate data centers.No data-center-specific local law identified in Hunters Creek Village, Texas

What this means

The ordinance does not specifically ban data centers, but it limits where buildings and businesses may operate and requires building permits and compliance with district rules. Data centers are not clearly listed as an allowed business use, so approval and site requirements could add meaningful uncertainty, cost, or delay; the ordinance’s permitted business uses do not expressly include data centers.

People behind it

  • Recommended enactment of the new zoning ordinance and prepared district regulations. recommended the enactment of a new Zoning Ordinance

  • Enacted the ordinance and is authorized to adopt amendments. BE IT ORDAINED BY THE CITY COUNCIL

  • Responsible for administering and enforcing the ordinance. administered and enforced by the Building Official

Restrictions & requirementsHide restrictions & requirements7
  • Zoning limits land and buildings to uses permitted in the district. District R permits single-family dwellings and specified accessory, public, and specially approved uses; District B lists permitted uses and prohibits uses not on that list. The ordinance does not specifically name data centers, so it does not establish that they qualify as a permitted use. Permitted uses in District R and prohibited uses in District B

  • Construction, remodeling, enlargement, improvement, alteration, or conversion of a building, structure, or fence requires a building permit. Permit applications must include scaled plot plans and other specified information; plans may take up to two weeks to inspect before a permit is issued. Building permit requirement and plan review

  • A certificate of occupancy is required for a newly erected or structurally altered building, use of vacant land, and specified changes in use. The occupancy or use cannot begin until the certificate is issued. Certificate of occupancy requirement

  • In District B, nonresidential uses are subject to minimum lot requirements of 7,500 square feet, 75 feet of width, and 100 feet of depth; buildings generally must be at least 35 feet from a street line and 15 feet from a business-district boundary. The ordinance allows a boundary setback of 2 feet for a building under 15 feet tall with no windows facing a residential area. Business-district lot and setback rules

  • In District B, structures generally may not exceed 35 feet in height; aerial antennas may reach 45 feet, measured from the curb bounding the property line. Business-district height limit

  • The City may set fees and charges for building permits, certificates of zoning compliance, appeals, and other zoning matters; no action may be taken on an application or appeal until applicable fees are paid in full. Fees and payment condition

  • A violation of the ordinance can result in a fine of up to $200, and each day the violation continues is a separate offense. Violation penalty

Benefits & exceptionsHide benefits & exceptions4
  • A data center that was a lawful use when the ordinance or a later amendment took effect may continue operating as a nonconforming use, subject to the ordinance’s conditions. For a use involving a building, abandonment for six consecutive months—or twelve months within three years—ends this protection. A lawful use may be continued.

  • A legally existing building that does not meet the ordinance’s dimensional or other structure requirements may continue to be used while it remains otherwise lawful. It cannot be altered to increase its nonconformity, and reconstruction is restricted if destruction exceeds 50 percent of its replacement cost. Such structure may be continued.

  • Projects with lawful construction actually begun before the ordinance or an amendment took effect, and diligently continued, are not required to change their plans, construction, or designated use because of the new rules. Actual construction was lawfully begun.

  • Building permits issued before the ordinance took effect are not abrogated by it. Any permits issued before the effective date.