City of Hedwig Village
Mixed Data Center Policies
Texas offers substantial tax breaks on equipment and electricity to large projects meeting investment and job requirements, while large grid connections face studies, fees, and possible emergency power cuts; some requirements apply only to very large loads.
Rating and summary from Texas statewide as there are no scored current or future laws outside temporary restrictions for City of Hedwig Village.
failed · City of Hedwig VillageRequires added stormwater detention when lot coverage increases on non-single-family properties; it does not specifically regulate data centers.No data-center-specific law or ban identified in Hedwig Village
What this means
The measure would require flood-detention mitigation when a non-single-family lot increases its covered area, which could add some cost or work for data center construction or expansion. The requirement is limited to projects that increase lot coverage, so its overall effect appears minor. The ordinance describes this detention requirement.
People behind it
- City Council of the City of Hedwig Village
Identified as the body issuing the ordinance amending Chapter 38.
Restrictions & requirementsHide restrictions & requirements1
Ordinance No. 861 requires mitigating detention when lot coverage is increased on non-single-family lots, which may add a requirement for a data-center project that increases coverage on such a lot. “require mitigating detention when increasing lot coverage”