City of Granbury

Anti-Data Center Policies

Granbury permits data centers in its industrial district but requires a 100-foot landscape buffer and annual independent inspections, making facilities harder and costlier to build and operate.

current law · City of Granbury
Requires data centers to meet city standards for noise, visual screening, water use, lighting, construction impacts, and annual third-party inspections.Granbury Zoning Ordinance, Chapter 4, §§ 4.1 and 4.2, Supplemental Standard 43

What this means

The measure allows data centers in the industrial district, but adds substantial costs and design requirements, including a 100-foot landscape buffer and annual third-party inspections (supplemental standards). These conditions make building and operating a facility meaningfully harder, though they do not ban data centers (permitted use).

People behind it

  • The ordinance identifies the Council as wishing to make the amendments and as the body that ordained, passed, and approved the measure. desires to amend the Zoning Ordinance

  • The ordinance authorizes the City Secretary to publish its caption and penalty clause. authorized to publish

Restrictions & requirementsHide restrictions & requirements11
  • Data centers are marked prohibited in the listed zoning districts except the Industrial (I) district, where they are permitted subject to Supplemental Standard 43. Use-table designation

  • Facilities must use best available technology and control technology to mitigate noise, environmental, energy, emissions, water-use, and economic impacts. Annual third-party inspections of noise, visual, and resource-use requirements are required, with results reported to the City. Annual third-party inspections

  • Noise controls are required, including continuous sound-absorptive barriers around mechanical and power equipment, acoustic materials and vibration isolation, and site planning that directs the loudest equipment away from residential or public outdoor areas. Sound-absorptive noise barriers

  • Structures must meet the zoning district’s maximum height unless the City Council authorizes additional height as part of another development approval. The Council must consider stated operational, mitigation, public-interest, and impact criteria at a public meeting and may impose conditions. Council may authorize structures exceeding the maximum height

  • A substantial perimeter visual buffer is required, including a vegetative landscape strip at least 100 feet wide, trees at least 3-inch caliper at planting, and at least 90% opacity within three years. Berms or solid screening walls and neutral, non-reflective finishes are also required; a landscape and screening plan is subject to site-plan review. The buffer must be maintained, with dead or diseased vegetation replaced within six months. 100-foot wide vegetative landscape buffer

  • Facilities must use best-practice closed-loop systems and water-capture and reuse systems, such as rainwater harvesting, stormwater detention, and non-potable reuse. closed-loop systems

  • Facilities with battery energy storage systems or on-site fuel storage must comply with NFPA 855, UL 9540/9540A, SPCC standards, and other applicable laws, and must coordinate with local fire departments annually on emergency response. Annual emergency response coordination

  • A Construction Management Plan must be submitted, including routes, dust control, restricted work hours, and emergency-access protocols. Submit a Construction Management Plan

  • Construction-related traffic must be reduced by ensuring alternative freight modes, including rail, particularly for bulk materials and large components. including rail

  • Outdoor lighting must comply with the zoning ordinance’s outdoor-lighting requirements, be directed downward with shielded fixtures where practicable, use only the minimum necessary illumination, and use controls to reduce lighting during low activity. A professional lighting plan with photometric information must be submitted with the site plan; reasonable measures to reduce non-essential lighting during migratory bird activity are also required. professional lighting plan

  • Violations of the ordinance may be fined up to $2,000 per offense, and each day a violation continues is a separate offense. Each day that a violation is permitted to exist

Benefits & exceptionsHide benefits & exceptions3
  • The Use Table designates data centers and power-generation facilities as permitted uses in the industrial district, rather than requiring a specific-use permit there. The uses are added to the Use Table.

  • The City Council may approve structures above the district’s usual height limit as part of another authorized development approval. Approval is discretionary and requires findings about operational or design necessity, mitigation, public benefits, and avoiding unreasonable impacts; the Council may impose conditions. The City Council may authorize structures exceeding the maximum height.

  • The City may allow reasonable flexibility in the visual-buffer design to accommodate site conditions, engineering needs, and maintenance feasibility, subject to site-plan approval and compatibility with surrounding uses. allowing reasonable flexibility.