City of Ganado

Neutral Data Center Policies

Ganado has no data-center-specific ban or incentive, but construction may require general permits and fees, including a building-permit fee, creating a modest added burden.

current law · City of Ganado
Creates no data-center-specific regulations; the ordinance contains only generally applicable city rules.Ganado ordinance book, Code of Ordinances (2009)

What this means

The ordinance has no data-center-specific ban or incentive, but construction may require permits and fees, including a building-permit fee. These are modest, general requirements, so the net effect is a small added burden rather than a major obstacle.

Restrictions & requirementsHide restrictions & requirements10
  • New buildings and additions, repairs, or alterations require a building permit. The application must include a detailed plot plan and electrical and plumbing specifications for city review; the listed fee is $10 for construction costing up to $1,000, plus $3 for each additional $1,000. Interior remodeling without new electrical or plumbing service is excepted. building-permit requirements

  • Contractors or builders doing work for which a building permit is required must pay a $25 license tax, register with the building official, and provide evidence of public-liability and workers’ compensation insurance. contractor license and insurance requirements

  • Construction is subject to the city’s adopted building, mechanical, plumbing, electrical, and fire-prevention codes. Electrical installation or alteration requires a permit; the electrical permit schedule has a $10 minimum and additional listed charges, and aluminum wire is prohibited. adopted building code, electrical permit and wiring rules

  • Where a project entails subdivision or replatting, Board of Code Enforcement approval is required. A preliminary plat must be approved before construction work begins, and a final plat must be approved before lots are sold; filing fees and submission materials are required. plat approval and construction timing

  • Construction of a commercial development project requires Board of Code Enforcement approval. The code’s commercial-development definition includes factory/industrial uses and storage buildings of 5,000 square feet or more. commercial development approval

  • In areas of special flood hazard, a development permit is required before land or structures are located, altered, or changed in use. New construction and substantial improvements must meet flood-protection standards, including elevation or floodproofing requirements; the code defines substantial improvement as work costing at least 50% of the structure’s market value. floodplain permit and compliance rules

  • Work involving construction, alteration, or repair of streets, sidewalks, alleys, driveways, or curbs requires a city permit, plans and specifications, a fee, and a bond or other financial guarantee. Excavation or openings in a street, alley, or public highway also require a permit and a guarantee to restore the area. public-right-of-way construction permit

  • Water and sewer connections carry tap fees, and the city requires buildings and residences to connect when water and sewer service is deemed available. For example, the listed 3/4-inch water tap fee is $245 and the 4-inch sewer tap fee is $300; monthly service rates also apply. water and sewer tap fees, connection requirement

  • Unreasonably loud, offensive, or disturbing noise is prohibited when its character, intensity, and duration are detrimental to the life, health, or safety of an ordinary reasonable person. unreasonable-noise prohibition

  • During a declared water emergency, water use is subject to conservation rules, including lawn-watering schedules; during an extreme emergency, lawn watering is eliminated, and bulk sales of water in truckload quantities are prohibited during either kind of emergency. emergency water restrictions

Benefits & exceptionsHide benefits & exceptions3
  • Tax abatement is available for commercial-industrial improvements in Reinvestment Zone No. 2, a specifically described 300-by-300-foot tract; the designation lasts five years or until the applicable abatement agreement expires, whichever comes first (eligible improvements and designation period).

  • A half-cent sales and use tax funds a Development Corporation for specified infrastructure, including streets, roads, drainage, water facilities, and sewer and wastewater distribution and treatment; the ordinance does not guarantee funding for any particular project (the listed infrastructure uses).

  • Within city limits, the city provides requested water and sanitary-sewer main extensions to the nearest point where the property abuts a public street, alley, easement, or right-of-way at no cost to the owner, apart from tap fees, if the property has not been divided into more tracts than existed on May 1, 1999. The no-cost extension is limited to service for one single-family residence; the owner pays for any larger-capacity main (extension terms and limits).