City of Deer Park

Mixed Data Center Policies

Texas offers substantial tax breaks on equipment and electricity to large projects meeting investment and job requirements, while large grid connections face studies, fees, and possible emergency power cuts; some requirements apply only to very large loads.

Rating and summary from Texas statewide as there are no scored current or future laws outside temporary restrictions for City of Deer Park.

pending · City of Deer Park
Restricts data centers to M1 industrial park districts with a specific-use permit and prohibits using potable, surface, or groundwater for cooling.Proposed zoning changes to address data centers (draft; discussed as DIS 26-053 / DIS 26-054)

What this means

Data centers could be built only in the M1 industrial district and would need a Specific Use Permit, including for expansion or major changes (permitted in the M1 district only with a permit). The ban on using water for cooling and the requirement for operators to fund substations add substantial costs and limits, making this a significant barrier rather than a ban (cooling-water prohibition).

Restrictions & requirementsHide restrictions & requirements11
  • Data centers are allowed only in the M1 Industrial Park District, and only with a Specific Use Permit; they are prohibited in all other zoning districts unless a later ordinance amendment expressly authorizes them. Permitted in the M1 District only upon approval

  • A Specific Use Permit is required to establish, construct, reconstruct, expand, enlarge, or substantially modify a proposed or existing data center. Establishment, construction, reconstruction, expansion, enlargement, or substantial modification

  • The permit covers principal buildings and accessory or support facilities primarily serving the data center on the same site, tract, or campus. Those facilities cannot be separately classified or permitted to avoid the permit requirement, and other permits do not replace it. No accessory or support facility

  • A data center cannot be classified as a Group 15 general office or data-processing/computing service use; the measure excludes data centers from that use group. Shall not include a Data Center

  • The SUP application must include a letter from the owner or authorized representative depicting and identifying the data center’s principal, accessory, and support facilities, as well as listed site features and other major site and offsite improvements. Depict and identify all principal, accessory, and support facilities

  • Data centers may not use potable, surface, or groundwater for non-domestic purposes, and may not use those sources for cooling systems, including climate control. Use of potable, surface or groundwater for cooling systems

  • Data centers must fund, design, build, and maintain substations with capacity to power or support the entire data center facility, campus, buildings, components, and systems. Substations shall be required to be funded

  • Data centers and associated support facilities must comply with the city’s currently adopted editions of the listed building, fire, electrical, mechanical, and energy codes, and other applicable adopted codes and ordinances. Comply with the currently adopted editions

  • Where required by the adopted building and fire codes, data centers must have automatic sprinkler and fire alarm/detection systems; required systems must be designed, installed, inspected, tested, and maintained under applicable code provisions and as permitted by the Fire Marshal. Where an automatic sprinkler system is required

  • Data centers must meet the specified ERCES standards in NFPA 1 Section 11.10, NFPA 1225, and the International Fire Code; the measure also requires core system components and testing thresholds, with enforcement by the Fire Marshal. Must meet the NFPA 1 Section 11.10 and NFPA 1225

  • Data centers must provide off-street parking under the requirements for the applicable use, including parking for administrative, operations, maintenance, security, and other personnel regularly assigned to the facility. Shall include parking for administrative, operations, maintenance

Benefits & exceptionsHide benefits & exceptions2
  • Data centers are allowed in the M1 Industrial Park District with an approved Specific Use Permit, although they are prohibited in other districts unless a later amendment authorizes them. Permitted in the M1 – Industrial Park District only upon approval

  • A data center’s administrative or office space does not, by itself, make the whole facility an office use; the Group 26 parking rule also says the office component alone does not determine the facility’s use classification. Shall not, by itself, cause the entire Data Center to be classified as an office use