City of Coleman
Mixed Data Center Policies
Texas offers substantial tax breaks on equipment and electricity to large projects meeting investment and job requirements, while large grid connections face studies, fees, and possible emergency power cuts; some requirements apply only to very large loads.
Rating and summary from Texas statewide as there are no scored current or future laws outside temporary restrictions for City of Coleman.
failed · City of ColemanApplies the city’s general zoning, permitting, and inspection rules to data centers, but sets no special rules for them.No Coleman-specific data center law identified
What this means
A data center would need to comply with the zoning rules and go through ordinary permits and inspections, including a $25 application fee (zoning ordinance, permit information). These are modest requirements, and the sources describe no data-center-specific restrictions or incentives.
People behind it
- City Manager
Responsible for administering and enforcing the zoning ordinance.
Restrictions & requirementsHide restrictions & requirements15
Land and buildings may be used only for uses specified for their zoning district. The ordinance does not expressly identify data centers, so whether one is allowed depends on how the proposed use fits the district’s use schedule; unlisted uses are expressly prohibited in the Downtown District. uses specified for the district
Development must comply with the applicable zoning-district standards and City ordinances. A building permit may be issued only if the City Manager determines the proposal complies. issue a building permit
Development-approval applications require a nonrefundable fee before processing. Applications requiring Planning Commission or Zoning Board of Adjustment review generally must be filed at least 21 days before the public hearing. No application shall be processed
If conditional-use approval is required, the Planning Commission holds a public hearing and may impose conditions or deny the request. A building permit must be obtained within 12 months after approval; the City Manager may grant an extension of up to 12 additional months. conduct a public hearing
If special-use approval is required, public hearings and action by the Planning Commission and City Council are generally required. A written protest by owners of at least 20% of the affected area or of land within 200 feet triggers a three-fourths Council vote. Approval generally expires unless a building permit is obtained within 12 months, with a possible extension of up to 12 months. favorable vote of at least three-fourths
A zoning-map amendment requires Planning Commission and City Council review and public hearings. A written protest meeting the ordinance’s 20% threshold requires a three-fourths Council vote. public hearing on each proposed change
A Planned Development rezoning application must cover at least one acre and include a concept plan. Work requiring a building permit cannot begin until a site plan for that phase is approved; a written protest meeting the 20% threshold requires a three-fourths Council vote. No application shall be accepted
Expansion of a lawful nonconforming use requires Planning Commission approval. A nonconforming use or structure not operated for six continuous months is considered abandoned, and total destruction or obsolescence bars rebuilding as a nonconformity. No nonconforming use may be enlarged
Projects subject to the City’s building regulations must comply with its adopted codes, including the 2018 International Building, Residential, Mechanical, Plumbing, and Fire Codes and the 2017 National Electrical Code, with amendments. adopted the following codes
Permit applications have a $25 fee, and the permit itself costs extra, with the amount depending on the work. Permit Application fee: $25
Contractors must register with the City and provide proof of insurance. Licensed electricians and plumbers pay no registration fee; general contractors and contractors doing HVAC, alarm, telecommunications, paving, roofing, or other listed work pay $50 for a two-year registration. All contractors must register with the city
Commercial occupancies must obtain a certificate of occupancy before opening to the public. All commercial occupancies must obtain a certificate of occupancy
Permits are valid for six months (180 days); if work is not completed within that period, a new permit is required. Permits are good for 6 months (180 days)
The Building Official may revoke a permit or approval if the holder does not comply with its terms during construction. authority to revoke a permit or approval
Inspections are required at specified construction stages, including foundation, framing, and final inspections; inspectors require 24 hours’ notice. Inspectors require 24 hour notice
Benefits & exceptionsHide benefits & exceptions4
Planned Development (PD) zoning allows site-specific development standards and phased site plans. An application requires at least one acre and approval; it does not guarantee approval of a data center. PD applications require at least one acre.
For uses allowed by right, the Building Official issues a permit if the proposed development complies with applicable city ordinances. This applies only if a data center qualifies as a by-right use in its district. Uses allowed by right.
Local utility distribution lines are allowed in every listed zoning district, which can facilitate siting utility infrastructure. The ordinance does not require utilities to provide service or capacity. Local utility distribution lines.
A lawfully established nonconforming use may continue if zoning rules change. Expansion is restricted and generally requires Planning Commission approval. Nonconformities shall be allowed to continue.