Loading map…

City of Bryan

Neutral Data Center Policies

Bryan allows data centers by right on 124.65 acres, but requires a 200-foot buffer from homes, sound barriers near residences, and underground utility lines.

current law · City of Bryan
Allows data centers on a designated Bryan site while prohibiting cryptocurrency mining and requiring setbacks, noise barriers, equipment screening, parking, and underground utility lines.Planned Development–Mixed Use (PD-M) data center development regulations for the 162.6-acre Dodd Family Holdings tract

What this means

The measure would make data centers an allowed use on 124.65 acres, creating a clear path to build them there. It also adds requirements, including a 200-foot buffer from homes, sound barriers near residences, and underground utility lines, so the overall benefit is modest. Data centers are permitted by right

People behind it

  • Property owner that requested the annexation.

Restrictions & requirementsHide restrictions & requirements11
  • Cryptocurrency mining is prohibited in data centers. “Cryptocurrency mining shall be prohibited”

  • Data centers must be set back at least 35 feet from property lines adjacent to public rights-of-way and 15 feet from all other property lines. “at least 35 feet”

  • Data centers may not be located within 200 feet of a residential structure. “within 200 feet”

  • Mechanical equipment must be visually screened from ground-level view from existing or planned public rights-of-way and adjoining parcels, while allowing necessary ventilation. If data-center mechanical equipment is within 400 feet of a residential structure, it must also have an acoustical barrier on all four sides. “fully visually screened from view” “within 400 feet of a residential structure”

  • A vehicular loading or unloading area within 100 feet of any property line must be screened by a solid visual barrier at least six feet high. “within 100 feet of any property line”

  • Building facades next to an existing or planned public right-of-way must change at least one listed design element—material, pattern, texture, color, or accent material—every 150 linear feet. “every 150 linear feet”

  • Data centers must provide at least two off-street parking spaces, plus one additional space for every two employees on the largest work shift. “one (1) off-street parking space per each two employees”

  • If a data center is gated, it must provide sufficient on-site idling areas for vehicles waiting to enter; those areas must appear on a site plan and keep waiting vehicles out of public rights-of-way and private drives. “sufficient on-site idling areas”

  • The developer must pay to extend public utilities from the closest available public line to and through the district, and electric and communications lines serving properties in the district—including private lines from the property line to structures—must be underground. “at the expense of the developer”

  • If the upper reaches of a FEMA-designated watercourse are not adequately mapped, the property owner must commission engineering studies for City submission and review. “engineering studies shall be commissioned by the property owner”

  • The district’s development must comply with the City’s generally applicable C3 development standards, as well as Innovation Corridor Overlay requirements for landscaping, lighting, and off-street parking. “shall comply with development standards” “Innovation Corridor Overlay District”

Benefits & exceptionsHide benefits & exceptions3
  • The ordinance assigns 124.65 acres to the PD-M district, where data centers are permitted by right. Development remains subject to the applicable C3 standards and the PD-M’s additional requirements; cryptocurrency mining is prohibited.

  • The PD-M sets a specific data-center parking minimum: two spaces plus one space per two employees on the largest work shift.

  • The staff report says water and sanitary-sewer infrastructure under construction will be available for point-of-use connections or extension. Availability is after construction is complete; utility extensions are at the developer’s expense, and annexation does not require the City to provide service beyond its capacity.

Sources