City of Bellaire

Mixed Data Center Policies

Texas offers substantial tax breaks on equipment and electricity to large projects meeting investment and job requirements, while large grid connections face studies, fees, and possible emergency power cuts; some requirements apply only to very large loads.

Rating and summary from Texas statewide as there are no scored current or future laws outside temporary restrictions for City of Bellaire.

failed · City of Bellaire
Requires data centers to follow Bellaire’s general zoning, site-plan, and operating standards, without creating data-center-specific rules.No identified Bellaire data-center-specific law

What this means

The rules do not name data centers, so it is unclear where they would be allowed. But unlisted uses may be prohibited unless specifically approved, and site-plan and development requirements could add costs and delays.

People behind it

  • Held a public hearing, determined that the Comprehensive Plan changes should be implemented, and adopted the ordinance.

  • Held a public hearing on the amendments and made recommendations to the City Council.

Restrictions & requirementsHide restrictions & requirements11
  • The ordinance does not specifically classify data centers as a land use. A data center must be allowed in its zoning district; otherwise it requires a specific use permit or is prohibited.

  • In the UV-T district, industrial or manufacturing uses and warehousing, wholesaling, and distribution facilities are prohibited. A data center classified as one of those uses cannot operate there.

  • In the North Bellaire Special Development District, uses other than municipal and utility functions must be proposed and approved as a planned development. A planned development must cover at least two acres, and its uses are limited to the ordinance’s stated list.

  • Site-plan review is required for development in the R-MF, CMU, UV-D, and UV-T districts and the North Bellaire Special Development District. Applications must provide specified project information; officials may require a traffic-impact analysis.

  • In North Bellaire, applications involving a change in use or increased development intensity must include a traffic-impact analysis and provide reasonable mitigation for attributable traffic impacts. Applications also receive Planning and Zoning Commission review and a recommendation to City Council.

  • North Bellaire development is limited to 85 feet in height and 80 percent site coverage. Qualifying boundaries with residential districts require a 65-foot yard and an additional height-based setback plane; buildings must also be at least 50 feet from the Loop 610 Service Road right-of-way.

  • Uses must comply with citywide operating standards for noise, air pollution, odors, hazardous materials, vibration, open storage, and glare. In residential zones, noise limits include 55 dB(A) by day and 50 dB(A) at night for L90, and 65 dB(A) by day and 60 dB(A) at night for L10.

  • On property with known TCEQ-identified affected soil or groundwater, a licensed engineer’s Soil and Groundwater Management Plan must be approved before a soil-disturbing building permit is issued. The applicant pays for city-contracted third-party monitoring and testing and must document HAZWOPER training for earthwork contractors; violations can halt construction or result in permit revocation.

  • Landscaping, screening, and buffering requirements apply to covered nonresidential development and related parking. They can be triggered by a building enlargement exceeding 1,000 square feet or a new or expanded parking lot adding at least one space, and include planting and ongoing maintenance requirements.

  • Planned-development amendments and specific use permits require a nonrefundable application fee and specified application materials. A specific-use application includes a survey and scaled site plan and, unless waived, a landscape plan and traffic analysis or trip-generation report.

  • Proposed zoning amendments, planned developments, and specific use permits are subject to public-hearing procedures. For zoning-district changes, owners within 500 feet must receive mailed notice; notices must be published at least 10 days before a Planning and Zoning Commission hearing and 15 days before a City Council hearing, and required signs must be posted at least 15 days before the hearing.

Benefits & exceptionsHide benefits & exceptions1
  • A lawfully existing use may continue as a nonconforming use under the code’s procedures and requirements. This could protect an existing data center if it qualifies as a lawful use, but the provision does not specifically name data centers. Lawfully existing uses may continue.