City of Arlington
Mixed Data Center Policies
Texas offers substantial tax breaks on equipment and electricity to large projects meeting investment and job requirements, while large grid connections face studies, fees, and possible emergency power cuts; some requirements apply only to very large loads.
Rating and summary from Texas statewide as there are no scored current or future laws outside temporary restrictions for City of Arlington.
pending · City of ArlingtonProposes limiting standalone data centers to certain industrial zones with special permits and setting data center-specific rules for cooling, noise, setbacks, screening, height, and backup power.Draft Arlington data center zoning ordinance options (presented October 27, 2026; not adopted)
What this means
If enacted, the proposal would make standalone data centers harder to site and approve: they would need a special permit in limited industrial zones, and face restrictions such as a ban on evaporative cooling (“SUP only in LI or IM”). But smaller accessory data centers could be allowed in other non-residential districts, so the proposal is a meaningful hurdle rather than a ban.
Restrictions & requirementsHide restrictions & requirements11
For a stand-alone data center as a principal use, the proposal would require a Specific Use Permit (SUP) and limit the use to LI or IM zoning districts. In a PD district, the data center would have to be specifically identified, and an SUP would still be required. Proposed principal-use zoning
The proposal would prohibit evaporative cooling systems for stand-alone principal-use data centers and accessory data centers within a building. Cooling-system standards
A stand-alone principal-use data center would have to be at least 300 feet from single-family, multifamily, mixed-use, or approved SB 840 projects, measured property line to property line. Minimum setback
The proposal would require ground equipment screening with masonry at least one foot taller than the equipment or 10 feet tall, whichever is greater, and rooftop equipment screening at 1.5 times the equipment height. Equipment screening standards
A stand-alone principal-use data center could be no more than 75 feet tall, excluding rooftop screening. Maximum height
The proposal would impose operating and verification requirements for noise: limits on generator-testing times, pre-construction ambient testing, limits on low- and high-frequency sound (including nighttime), and post-construction testing and remediation if needed. Noise standards
A stand-alone principal-use data center would need a decommissioning plan addressing removal of external equipment and hazardous materials, as well as adaptive reuse. Decommissioning plan
An accessory data center within a building would be allowed only in a non-residential district, must serve the primary user of a principal use in the same building, and must occupy less than 50% of the building’s gross floor area. Projects that do not meet all accessory-use criteria would be treated as principal uses. Accessory-use criteria
For an accessory data center within a building, outside backup generators would not be permitted; an outside backup energy storage system would be allowed only subject to size limitations. Accessory backup-power standards
An accessory equipment box would have to serve a principal use in the same building or an adjacent structure, have no more than 200 square feet of aggregate area and be no more than 12 feet tall; generators and separate utility-scale backup energy storage systems would not be allowed. Equipment-box limits
The proposal would require data-center design to meet UDC Section 5.6, except where superseded by the proposed data-center standards. Design criteria
Benefits & exceptionsHide benefits & exceptions5
Proposed: A stand-alone data center could seek a specific-use permit in a Light Industrial or Industrial Manufacturing district, or in a Planned Development that specifically identifies the use; a specific-use permit would still be required. Permitted locations for principal use
Proposed: An in-building accessory data center could be located in any non-residential district if it serves as an accessory to the principal use in the same building, whose primary user is the data center’s user, and occupies less than 50% of the building’s gross floor area. If it does not meet all these criteria, it would be treated as a principal use. Accessory use in any non-residential district
Proposed: An accessory data-center equipment box could be allowed by right in any district if accessory to a principal use in the same building or an adjacent structure. The aggregate size would be limited to 200 square feet and height to 12 feet; generators and separate utility-scale backup energy storage systems would not be allowed. Allowed by right as an accessory use
Proposed: An in-building accessory data center would not require parking beyond what is required for the principal use. If the space is identified as an accessory data center, the zoning administrator could exempt it from the building’s overall parking calculation. No parking requirement beyond the principal use
Proposed: Outdoor backup energy storage systems for an in-building accessory data center could be permitted, subject to size limits; outside backup generators would not be permitted. Outside Backup Energy Storage System permitted