Anti-Data Center Policies

Addison requires special-use approval for data centers and imposes enclosure and parking standards, creating added approval and design constraints without a categorical ban.

current law · Town of Addison
Addison’s UDC contains targeted data-center land-use standards, rather than a separate building-code measure.Addison Unified Development Code, Appendix A (current code)

What this means

Data-center-specific special-use designation, enclosure rule and parking standard add approval and design constraints, without a categorical ban. General fees are not treated as data-center-specific regulation.

Restrictions & requirementsHide restrictions & requirements3
  • The use table designates data centers for Special Use Permit approval in the listed districts.

  • Section 4.3.5.A requires all activities inside an enclosed structure, excluding generators.

  • The data-center parking rate is one space per 1,000 square feet GFA. General building codes, fees and procedures are not included as separate targeted provisions.

Benefits & exceptionsHide benefits & exceptions1
  • The data-center-specific enclosed-activity rule excludes generators. This is an exception to that rule, not an exemption from all other regulation.