Sullivan County
This restriction takes precedence while in effect. The rating below excludes temporary restrictions.
Slightly Pro-Data Center Policies
Sullivan County bars covered high-intensity, revenue-generating data-mining facilities, not ordinary computing businesses. Its new district limits data-center locations and imposes buffering and utility, noise, and water-use controls.
Rating from Tennessee statewide as there are no scored current or future laws outside temporary restrictions for Sullivan County.
Specific to Sullivan County only.
current law · County measureThis county moratorium temporarily prohibits covered data-mining centers, cryptocurrency-mining operations, blockchain-computing centers, and similar high-intensity, third-party revenue-generating facilities from locating, being constructed, or operating in Sullivan County, and pauses related county permits and zoning approvals.Sullivan County, Tennessee Resolution No. 2025-11-07, as amended (2026)
What this means
The proposal would bar covered data-mining facilities from being built or operated and deny them county approvals while the restriction applies. But it targets high-intensity, revenue-generating mining operations—not ordinary businesses using computing equipment—so it is not a ban on all data centers.
Timing
- Ends
- 180 days after adoption
The measure includes a temporary moratorium on data-center development. The sources do not state an explicit calendar expiration date or indicate that the moratorium is indefinite.
Restrictions & requirementsHide restrictions & requirements2
Data centers may be developed only in property designated within the newly created data-center zoning district; locations outside that district are not authorized for data-center use.
Establishing a data center requires the property to undergo the applicable zoning approval process before construction or operation can begin.
Benefits & exceptionsHide benefits & exceptions1
Creates a zoning district specifically intended for data centers, establishing a designated location where data-center development may occur.
Sources
current law · Countywide for the Sullivan County PMD-3 zoning amendment; City of Bristol for the separate proposed city data-center ordinanceWould create PMD-3, the Planned Manufacturing District (Data and Energy Processing District), for high-intensity, technology-driven and energy-dependent uses such as data centers, battery storage, cryptocurrency mining, and large-scale data-mining facilities, with safeguards addressing utility capacity, energy and water use, noise, vibration, heat, light, and electromagnetic interference through the amendment text.Sullivan County, Tennessee PMD-3 Planned Manufacturing District (Data and Energy Processing) zoning amendment (2026)
What this means
The proposal creates a new district for data and energy processing, but limits where data centers can go and adds buffering and utility, noise, and water-use controls. These are meaningful siting and compliance hurdles, though the proposal does not ban data centers.
Timing
The sources identify a temporary moratorium on establishing permanent campgrounds, approved by the Bristol City Council on 2026-03-24, but do not state an expiration date, duration, or extension condition.
People behind it
- Darlene Calton
Sponsor of Resolution No. 2026-06-01 concerning the zoning amendments.
- David Hayes
Co-sponsor of Resolution No. 2026-06-01 concerning the zoning amendments.
- Greg Raleigh
Applicant who proposed the rezoning of 118 Anco Place for an automotive repair shop.
Show 34 more peopleShow fewer people
- Sullivan County staff
Proposed and submitted the PMD-3 data and energy processing zoning text amendment for review.
- Gary Stidham
Sponsor of Resolution No. 2026-04-02 providing funding to PetWorks Animal Services.
- John T. Gardner
Co-sponsor of Resolution No. 2026-04-02 and sponsor or co-sponsor of several subsequent county resolutions.
- Zane Vanover
Sponsor or co-sponsor of county resolutions concerning the litter grant, school grants, TVA funds, recyclable-plastic collection, and the sheriff’s co-response agreement.
- Commissioner
Unnamed co-sponsor listed on Resolution No. 2026-06-03 concerning the donated recycling-center property.
- Joyce Crosswhite
Co-sponsor of the FY 2026 school grant resolutions.
- Mark Ireson
Co-sponsor of the FY 2026 school grant resolutions.
- Sam Jones
Co-sponsor of the FY 2026 school grant resolutions and the proposed four-way-stop resolution.
- Larry Crawford
Co-sponsor of the FY 2026 school grant resolutions.
- Jessica Means
Co-sponsor of the FY 2026 school grant resolutions.
- Hershel Glover
Sponsor of Resolution No. 2026-06-08 appropriating Helene debris-reimbursement funds for the Nellie Pratt Swinging Bridge.
- Dwight King
Co-sponsor of Resolution No. 2026-06-08 and sponsor of Resolution No. 2026-06-14 concerning the General Fund budget.
- Andrew Cross
Sponsor of Resolution No. 2026-06-09 concerning the sheriff’s hire, training, and recruitment grant.
- Michael Cole
Co-sponsor of Resolution No. 2026-06-09.
- David Akard
Sponsor of Resolution No. 2026-06-10 approving the recycling-services memorandum with Bristol.
- Cheryl Haney
Co-sponsor of Resolution No. 2026-06-10.
- Travis Ward
Sponsor of the proposed four-way-stop resolution and Resolution No. 2026-06-13 concerning the sheriff’s co-response agreement.
- Hunter Locke
Co-sponsor of Resolution No. 2026-06-12 concerning recyclable-plastic pickup.
- Sullivan County Department of Education
Department authorized to recognize, amend, and administer the school grant budgets addressed in Resolutions Nos. 2026-06-04 through 2026-06-07.
- Sullivan County Highway Department
Department responsible for implementing the proposed four-way-stop signage and the Nellie Pratt Swinging Bridge repairs.
- Sullivan County Solid Waste
County department authorized to administer the Bristol recycling-services agreement and the Casella recyclable-plastic agreement.
- Sullivan County Sheriff’s Office
Party responsible for implementing the co-response program and authorized to enter the memorandum with Frontier Health.
- Frontier Health
Party responsible for providing clinicians and behavioral-health services under the co-response memorandum.
- Mark Webb
Moved the Bristol Planning Commission recommendation on the Sullivan County PMD-3 data-center text amendment and the Vance Tank Road rezoning.
- Kelly Graham
Seconded the Bristol Planning Commission motion recommending the Sullivan County PMD-3 data-center text amendment.
- Gary Carrier
Property owner who requested the Vance Tank Road rezoning from Sullivan County R-1 to R-3.
- Matt Holden
Property owner who requested the Vance Tank Road rezoning from Sullivan County R-1 to R-3.
- Mahlon Luttrell
Seconded the Bristol Planning Commission motion recommending the Vance Tank Road rezoning.
- Audrey Zaidi
Property owner associated with the Bristol rezoning request for the Zaidi property.
- Jerome Malinay
Applicant who proposed the Zaidi property rezoning.
- Ardent Development
Development entity identified as the applicant’s organization for the Zaidi property rezoning.
- Harless Homes & Holdings, Inc.
Applicant that submitted the Raytheon Road subdivision concept plan.
- Landon Taylor
Developer who submitted the Taylor Meadows subdivision concept plan.
- PetWorks Animal Services
Organization designated to receive county funding and provide animal-control and shelter services.
Restrictions & requirementsHide restrictions & requirements9
Data centers are intended to be located inside existing or planned industrial parks and surrounded by less-intensive industrial zoning; the PMD-3 District may not directly adjoin residential or agricultural districts.
A PMD-3 lot must contain at least 300,000 square feet and have at least 400 feet of width measured at the building line.
PMD-3 development is subject to a maximum height of 55 feet, unless the local fire department approves a greater height, and a two-story limit.
PMD-3 development must provide 100-foot minimum front, side, rear, corner-side, and arterial-or-collector-road setbacks.
A 50-foot perimeter buffering strip is required in PMD-3. It must be free of buildings, structures, signs, parking, and paved or hard surfaces and must contain year-round evergreen trees and shrubs planted in three staggered rows.
A 10-foot vegetative reserve strip must be maintained along all road frontages, free of structures and parking.
Required yards generally may not use more than 50 percent of their area for driveways; front-property-line parking is prohibited within 10 feet, and required-yard areas may not be used for storage or processing.
Outside storage in PMD-3 is allowed only in areas specifically designated for it on an approved site plan.
For PMD-3 activities classified as disruptive manufacturing, any lot line adjoining commercial or manufacturing property requires an open area at least 100 feet wide; the area may be used for parking or loading but not for storage or processing.
Benefits & exceptionsHide benefits & exceptions3
Creates a new PMD-3 Planned Manufacturing District specifically for high-intensity, technology-driven, energy-dependent uses, including data centers, battery energy storage systems, cryptocurrency mining, and large-scale data-mining facilities.
Adds data- and energy-processing activities to the manufacturing-district use tables, providing a zoning framework under which qualifying data-center uses may be approved in PMD-3 districts.
Allows PMD-3 buildings to exceed the standard 55-foot maximum height when approved by the local fire department, providing flexibility for taller facilities.