Loading map…

Town of Jacksboro

Slightly Pro-Data Center Policies

Tennessee rules can limit how much utilities and municipalities absorb data-center-specific infrastructure costs, while allowing certain cost allocations and independent power. Qualifying large projects that meet investment and job requirements can receive equipment tax breaks and a reduced electricity tax.

Rating and summary from Tennessee statewide as there are no scored current or future laws outside temporary restrictions for Town of Jacksboro.

failed · Town of Jacksboro
Would permit data centers and crypto-mining facilities only in an industrial zone, subject to limits on noise, water and power use, building height, setbacks, and landscaping; the proposal still needs town council approval.None identified: Jacksboro data-center-specific laws or bans

What this means

The ordinance would allow data centers only in M-1 industrial areas, and the article says Jacksboro has no industrial zone yet, so the town would need to create one. Strict noise, water-use and power requirements, plus a 1,000-foot separation from residential areas, would make finding a suitable site and operating a facility substantially harder.

Restrictions & requirementsHide restrictions & requirements9
  • Enterprise data centers, cryptocurrency mining and advanced compute facilities are allowed only as restricted uses in the M-1 industrial district. Permitted uses with restrictions

  • Continuous noise at the property line is limited to 55 dBA from 7 a.m. to 10 p.m. and 45 dBA from 10 p.m. to 7 a.m. Applications must include a certified sound engineer’s acoustical study showing noise at the nearest residential property line will not exceed baseline by more than 3 dBA. Noise limits and acoustical study

  • Cooling towers, associated electrical substations, outdoor mechanical equipment and buildings must be at least 100 feet from a public right-of-way, 50 feet from adjacent industrial property lines, and 1,000 feet from a residentially zoned district or existing sensitive receptor. Required separation distances

  • Buildings, including roof-mounted HVAC, cooling towers and ventilation equipment, may not exceed 35 feet in height. Maximum building height

  • Facilities must use closed-loop cooling. Once-through municipal-water cooling and highly evaporative open-loop cooling towers are prohibited, and municipal potable water cannot be used for cooling. Any supplemental water must be reclaimed greywater or privately sourced non-potable water, subject to local environmental agency approval. Cooling and water-use requirements

  • Applications must include a letter from the local electrical utility confirming the grid can support the facility’s peak load without jeopardizing service reliability for residential or commercial customers. Utility will-serve letter

  • Facilities drawing more than 10 megawatts continuously must have a renewable-energy integration plan or participate in utility demand-response programs to curtail load during grid emergencies. More than 10 megawatts

  • A landscaped buffer at least 50 feet wide is required along property lines facing a public right-of-way or non-industrial property. Minimum 50-foot-wide buffer

  • For each 100 linear feet of buffer, operators must plant at least four large evergreen trees, two deciduous canopy trees and 15 evergreen shrubs, with shrubs at least 4 feet tall when planted. Planting requirements

Benefits & exceptionsHide benefits & exceptions1
  • Enterprise data centers, cryptocurrency mining, and advanced compute facilities are designated as permitted uses in the M-1 industrial district, subject to restrictions. Jacksboro does not currently have an industrial zone, so the city council would need to create one for this provision to apply. The ordinance adds these uses as permitted uses with restrictions