Bristol County
For Bristol County, see Rhode Island’s statewide laws and regulations below. No additional county-specific measures are listed in our research.
Neutral Data Center Policies
Rhode Island’s listed rules do not set meaningful requirements or incentives for building or operating physical data centers; the cited order addresses how state agencies handle data instead.
Incentives
Tax benefits2
Proposes a sales and use tax exemption for qualified data center owners or operators, covering qualified data center equipment and valid for thirty years after certification takes effect.
Proposes a sales and use tax exemption for qualified data center owners or operators, covering qualified data center equipment and valid for thirty years after certification takes effect.
current law · StatewideEstablishes a statewide data governance structure and federated data platform to coordinate state data use, improve public access and transparency, and make data more available for state analysis and external research.Rhode Island Executive Order 24-06 (2024)
What this means
This order concerns how state agencies share, protect, and analyze data; its “Data Center of Excellence” is not a rule about physical data centers. It adds no meaningful requirements, incentives, or restrictions for building or operating them (data operations).
People behind it
- Daniel J. McKee
Issued Executive Order 24-06 as Governor of Rhode Island.
- Department of Administration (DOA)
Directed to help create the statewide data governance structure, establish the Chief Data Officer position, and support the AI Center of Excellence.
- Executive Office of Health and Human Services (EOHHS) Data Ecosystem
Directed to help create the single statewide data governance structure.
Show 10 more peopleShow fewer people
- Office of the Postsecondary Commissioner (OPC) RILDS
Directed to help create the single statewide data governance structure.
- Division of Enterprise Technology Strategy and Services (ETSS)
Houses the Chief Data Officer position and works through its Data Center of Excellence on statewide data policies and activities.
- Chief Data Officer
Responsible for developing and maintaining the Data Center of Excellence and establishing the AI Center of Excellence, with DOA support.
- Data Center of Excellence
Develops strategies and recommendations to improve state data operations, quality, use, sharing, and readiness for AI.
- AI Center of Excellence
Develops AI policies and procedures, a state AI code of ethics, and risk analyses and safeguards.
- Rhode Island state agencies
Must participate in data governance, identify and share data as legally permissible, and identify secure and transparent AI opportunities.
- AI Task Force
Established to assess AI risks and opportunities and advise state policymakers.
- Department of Labor and Training (DLT)
Must collaborate on AI training and education opportunities and identify ways to incorporate AI training into existing programs.
- Rhode Island Department of Education (RIDE)
Must collaborate on AI training and education opportunities and identify ways to incorporate AI training into existing programs and higher education curricula.
- Office of the Postsecondary Commissioner (OPC)
Must collaborate on AI training and education opportunities and identify ways to incorporate AI training into existing programs and higher education curricula.
Sources
failed · StatewideWould require the Public Utilities Commission to create a separate tariff and rate classification for large energy-use facilities using at least 20 megawatts, including data centers, to allocate their transmission, distribution, energy, capacity, and ancillary-service costs and reduce the risk of cost shifting to other customers (S2427).Rhode Island S2427 (2026)
What this means
The bill applies to qualifying facilities that use or could use at least 20 MW and primarily provide certain data-processing services. It would require a separate electricity rate and a contract of at least 10 years with a minimum payment, which could raise costs and make expansion or operation less flexible, though it does not ban development.
People behind it
- Senator Lauria
Identified as an introducer of Senate Bill 2427.
- Senator Euer
Identified as an introducer of Senate Bill 2427.
- Senator DiMario
Identified as an introducer of Senate Bill 2427.
Show 8 more peopleShow fewer people
- Senator Ujifusa
Identified as an introducer of Senate Bill 2427.
- Senator Felag
Identified as an introducer of Senate Bill 2427.
- Senator Valverde
Identified as an introducer of Senate Bill 2427.
- Senator Vargas
Identified as an introducer of Senate Bill 2427.
- Senator Britto
Identified as an introducer of Senate Bill 2427.
- Senator Gallo
Identified as an introducer of Senate Bill 2427.
- Senator McKenney
Identified as an introducer of Senate Bill 2427.
- Public Utilities Commission
Would administer the measure by establishing the large-energy-use-facility service classification, approving tariffs and contracts, and submitting biennial reports.
Restrictions & requirementsHide restrictions & requirements8
Facilities that use or are able to use at least 20 megawatts and primarily provide covered data-processing or data-infrastructure services are placed in a special regulatory category. The definition covers services such as cloud storage, application hosting, and data entry.
The Public Utilities Commission must establish a separate service classification, tariff, and rate schedule for qualifying large energy use facilities rather than allowing them to use ordinary commercial or industrial rates.
The tariff must allocate or directly assign to qualifying facilities the costs of transmission, distribution, energy, capacity, ancillary services, and related risks, while preventing those costs from being shifted to other customer classes.
Before approving the tariff or rates, the commission must consider whether they could increase costs or risks for other customers, affect grid efficiency, reliability, or resiliency, interfere with Rhode Island’s clean-energy and emissions policies, or require generation contracts that support those policies.
An electric company providing service to a qualifying facility must enter into a contract covering the facility’s electricity service, including applicable transmission, distribution, energy, capacity, and ancillary services.
The required service contract must last at least 10 years, specify the service start date or estimated start date, and require the facility to pay a commission-determined minimum amount or percentage based on projected electricity use for the contract term.
The contract may impose an additional charge for electricity demand exceeding the contracted level.
Any direct-access arrangement, green-power rate, voluntary renewable-energy rate, or special contract used by a qualifying facility must still comply with the bill’s tariff and contract requirements.
Benefits & exceptionsHide benefits & exceptions4
Requires the Public Utilities Commission to create a separate service classification, tariff, and rate schedule for large energy use facilities, allowing data centers to receive electricity service under a dedicated framework rather than a general commercial or industrial classification. The facility must use or be capable of using at least 20 megawatts and primarily provide qualifying data-processing or infrastructure services.
Requires an electric company serving a qualifying large energy use facility to enter into a contract covering applicable transmission, distribution, energy, capacity, and ancillary electricity services. The contract must specify the service duration and start date, and must last at least 10 years.
Allows a qualifying large energy use facility to continue using direct access, a green power rate, a voluntary renewable energy rate, or a commission-approved special contract, provided the arrangement complies with the bill's requirements.
Allows the electricity-service contract for a qualifying large energy use facility to address delays in the utility's service commencement when the delay is within the parties' reasonable control, including by establishing applicable terms and conditions.
Sources
failed · StatewideWould require the Public Utilities Commission (PUC) to establish a distinct retail electricity classification for large energy-use facilities, including eligible facilities that use or can use at least 20 megawatts, such as certain data-center and data-processing operations.Rhode Island H7270 (2026)
What this means
The proposal would not ban data centers or control where they are built, but facilities able to use at least 20 MW would face a separate electricity rate and a utility contract lasting at least 10 years with minimum payments (large energy use facility contract requirements). Those terms could add costs and reduce flexibility, though rules aimed at assigning service costs to the data centers would help protect other customers.
People behind it
- Representative Speakman
Named sponsor who introduced H7270
- Representative Spears
Named co-sponsor of H7270
- Representative Carson
Named co-sponsor of H7270
Show 8 more peopleShow fewer people
- Representative Cortvriend
Named co-sponsor of H7270
- Representative McGaw
Named co-sponsor of H7270
- Representative Boylan
Named co-sponsor of H7270
- Representative McEntee
Named co-sponsor of H7270
- Representative Cotter
Named co-sponsor of H7270
- Representative Handy
Named co-sponsor of H7270
- Representative Alzate
Named co-sponsor of H7270
- Public Utilities Commission
Agency assigned responsibility for establishing the large-energy-use-facility service classification, tariffs, contracts, and related reporting under the measure
Restrictions & requirementsHide restrictions & requirements6
Facilities that use or can use at least 20 megawatts and primarily provide covered data-processing or data-infrastructure services are subject to a separate electricity-service classification with its own tariff and rate schedule (facility definition and 20-megawatt threshold) (separate classification and tariff).
The special tariff must allocate or directly assign the costs of serving these facilities to them and must mitigate the risk that other customer classes pay costs associated with their electricity demand, creating a potential additional cost obligation for covered facilities (allocate the costs of serving the class) (mitigate the risk of shifting costs).
When approving the tariff or rate schedule, the Public Utilities Commission must consider whether it could increase costs or risks for other customers, affect grid efficiency and reliability, or impede clean-energy and greenhouse-gas-reduction goals; these criteria can constrain approval of the facility’s proposed electricity service (factors the commission shall consider).
An electric company must require a covered facility to enter into a service contract covering applicable transmission, distribution, energy, capacity, and ancillary services before providing electricity service (required electricity-service contract).
The required contract must last at least 10 years, specify when service will begin, and require the facility to pay a minimum amount or percentage based on projected electricity use; it may also impose an additional excess-demand charge (ten-year minimum and payment obligation) (excess-demand charge).
Using direct access, a green-power rate, or a voluntary renewable-energy rate does not exempt a covered facility from the bill’s contract requirements; any such arrangement must still comply with the new section (alternative electricity arrangements must comply).
Benefits & exceptionsHide benefits & exceptions4
Requires the Public Utilities Commission to create a separate electricity-service classification, tariff, and rate schedule for large energy use facilities. The classification applies to facilities that use or can use at least 20 megawatts and primarily provide covered data-processing or data-infrastructure services.
Allows the tariff to allocate the costs of serving large energy use facilities to that class or directly assign those costs to the individual facility, providing a defined framework for recovering the costs of its electricity service.
Requires the electric company to enter into a service contract with each large energy use facility covering applicable transmission, distribution, energy, capacity, and ancillary services. The contract must last at least ten years, specify when service will begin, and require the facility to pay a minimum amount or percentage based on projected usage; it may also include an excess-demand charge.
Preserves a large energy use facility’s ability to use direct access, a green power rate, a voluntary renewable energy rate, or a commission-approved special contract, provided the arrangement satisfies the measure’s requirements.
Sources
failed · StatewideWould create a 30-year sales-and-use tax exemption for qualified equipment used at certified qualified data centers in Rhode Island, including computing, networking, power, cooling, water-conservation, monitoring, security, and related equipment (bill text).Rhode Island H7695 (2026)
What this means
The bill would give qualifying data centers a 30-year sales and use tax exemption on eligible equipment, a substantial incentive to build and operate in Rhode Island (30-year exemption). But projects would have to meet high investment, labor, and clean-energy thresholds, and data centers would be subject to labor standards, so the benefits are limited to large projects with added obligations (investment and labor requirements).
People behind it
- David Bennett
Democratic
Primary sponsor and introducing representative of H 7695.
- John Edwards
Democratic
Co-sponsor of H 7695.
- Evan Shanley
Democratic
Co-sponsor of H 7695.
Show 10 more peopleShow fewer people
- Robert Phillips
Democratic
Co-sponsor of H 7695.
- William O'Brien
Democratic
Co-sponsor of H 7695.
- Terri-Denise Cortvriend
Democratic
Co-sponsor of H 7695.
- Scott Slater
Democratic
Co-sponsor of H 7695.
- Deborah Fellela
Democratic
Co-sponsor of H 7695.
- Mary Messier
Democratic
Co-sponsor of H 7695.
- Rhode Island Commerce Corporation
Administers the qualified data center certification, compliance review, penalties, and related rules under the proposed measure.
- Director
Reviews applications, certifies qualified data centers, issues certifications, and administers compliance under the proposed measure.
- Director of Revenue
Consults with the Director on applications and implementation of the proposed sales and use tax exemption.
- Department of Revenue
Receives penalties assessed for noncompliance under the proposed measure.
Restrictions & requirementsHide restrictions & requirements7
A data center must make a qualified investment of at least $200 million if located in a designated enterprise zone or federal qualified opportunity zone, or at least $400 million elsewhere, by the sixth anniversary of certification.
A data center must spend at least $30 million on direct or indirect labor performed physically at the facility by the sixth anniversary of certification.
A data center must invest at least $10 million in a Rhode Island renewable energy resource or energy storage system by the sixth anniversary of certification.
An owner or operator must apply to the Rhode Island Commerce Corporation for certification and provide information including the site, anticipated facility size, investment, projected six-year labor costs, and an affirmation that the facility will meet the qualification requirements.
After the sixth anniversary of certification, the owner or operator must submit compliance documentation and may owe penalties for shortfalls: 7% of an investment shortfall, 7.5% of a labor-cost shortfall, or 10% of a renewable-energy or storage-investment shortfall. If more than one penalty applies, only the highest applicable rate is imposed.
From the seventh through the thirtieth year after certification, the owner or operator must spend at least $5 million annually on direct or indirect labor, file documentation within 45 days after each anniversary, and pay a 7.5% penalty on any annual labor-expenditure shortfall.
By defining a qualified data center as a covered project under the Labor Standards in Renewable Energy Projects chapter, the bill subjects it to that chapter's labor requirements, including prevailing-wage, apprenticeship-program, and labor-peace requirements; the labor-peace requirement does not apply to maintenance work at qualified data centers.
Benefits & exceptionsHide benefits & exceptions11
Exempts certified qualified data center equipment from Rhode Island sales and use taxes. The exemption covers equipment purchased or leased for computing, networking, data storage, power supply, cooling, water conservation, security, monitoring, modular facilities, and other property essential to operating the data center.
Makes the sales and use tax exemption available for thirty years after certification, beginning on the certification’s effective date.
Allows a data center to receive certification based on expected compliance with the qualification requirements, rather than requiring all investment and labor thresholds to be completed before certification.
Requires the Commerce Corporation director to approve or deny a completed application within sixty days, and provides that failure to act within that period constitutes approval. The director must issue the resulting written certification within fourteen days.
Gives applicants an opportunity to cure deficiencies when the director proposes to deny certification.
Allows the certification’s effective date to be the application date or a prospective date stated in the application, up to five years after submission, allowing a project to plan for a future start of the exemption.
Sets a lower minimum qualified investment of $200 million for a data center in a Rhode Island enterprise zone or federal qualified opportunity zone, compared with $400 million elsewhere in the state.
Allows qualified investment costs to be aggregated across the owner, operator, and qualifying colocation tenants, and includes costs such as land, buildings, site assessment, engineering, construction, renovation, repair, operation, and data center equipment.
Provides that shortfalls in the required investment, labor spending, or renewable-energy or energy-storage investment result in specified monetary penalties—rather than expressly ending the tax exemption. After the review or payment of an assessed penalty, the corporation must issue a certificate of compliance.
Permits qualified data centers to satisfy continuing operating requirements through annual labor expenditures of at least $5 million from the seventh through the thirtieth year, with a 7.5 percent penalty on any annual labor shortfall and issuance of an annual compliance certificate after review or payment.
Includes qualified data centers within the labor-standards law’s definition of a covered project and requires labor peace during deployment by prohibiting covered labor organizations from engaging in picketing, work stoppages, boycotts, or other economic interference. Maintenance work at qualified data centers is excluded from the labor-peace requirement.
Sources
failed · StatewideWould create a 30-year sales and use tax exemption for certified qualified data-center equipment in Rhode Island, targeting facilities that meet investment, labor, and renewable-energy or storage thresholds under the proposed certification process.Rhode Island S2346 (2026)
What this means
The bill would offer a large benefit: a 30-year sales and use tax exemption for equipment at qualifying data centers. But eligibility requires substantial investment, labor and clean-energy spending, plus ongoing labor spending and reporting, so this is a strong incentive with meaningful conditions—not an unrestricted tax break. The exemption lasts 30 years and qualification includes major investment and labor requirements.
People behind it
- Senator DiPalma
Named as an introducing sponsor of S2346.
- Senator Ciccone
Named as an introducing sponsor of S2346.
- Senator Britto
Named as an introducing sponsor of S2346.
Show 7 more peopleShow fewer people
- Senator Gallo
Named as an introducing sponsor of S2346.
- Senator Urso
Named as an introducing sponsor of S2346.
- Senator Tikoian
Listed as a sponsor in the Senate Commerce Committee notice for S2346.
- Rhode Island Commerce Corporation
Administers the qualified data center incentive, including certification, compliance reviews, penalties, and rulemaking.
- Director of the Rhode Island Commerce Corporation
Reviews and certifies applications for the sales and use tax exemption and issues compliance certificates.
- Director of Revenue
Consults with the Commerce Corporation director on qualification and implementation of the sales and use tax exemption.
- Rhode Island Department of Revenue
Receives penalties assessed for noncompliance with the qualified data center requirements.
Restrictions & requirementsHide restrictions & requirements8
To qualify for the incentive, a data center must achieve a qualified investment of at least $200 million in an enterprise or federal opportunity zone, or $400 million elsewhere, by the sixth anniversary of certification.
To qualify, the owner or operator must spend at least $30 million on direct or indirect labor for work physically performed at the facility by the sixth anniversary of certification.
To qualify, the owner or operator must invest at least $10 million in a Rhode Island renewable energy resource or energy storage system.
An owner or operator must apply to the Rhode Island Commerce Corporation, provide site, investment, square-footage, and labor information, and obtain certification before qualified data center equipment can receive the sales and use tax exemption.
The sales and use tax exemption is limited to 30 years, and its effective date may be delayed to a prospective date no more than five years after the application.
On the sixth anniversary of certification, the owner or operator must submit compliance reports and supporting documents; failure to meet the investment, labor, or renewable-energy requirements triggers penalties of 7%, 7.5%, or 10% of the applicable shortfall, respectively.
From the seventh through the thirtieth year after certification, the owner or operator must spend at least $5 million annually on direct or indirect labor, submit annual compliance documentation within 45 days after each anniversary, and pay a 7.5% penalty on any labor-expenditure shortfall.
By defining a qualified data center as a covered project under the Labor Standards in Renewable Energy Projects chapter, the measure subjects its construction and operation to that chapter's applicable labor requirements, including prevailing-wage, apprenticeship-program, and labor-peace requirements; the labor-peace requirement does not apply to maintenance work at qualified data centers.
Benefits & exceptionsHide benefits & exceptions11
Exempts certified qualified data center equipment from Rhode Island sales and use taxes. The exemption covers equipment purchased or leased for data processing, storage, retrieval, or communication, including servers, networking equipment, power systems, cooling systems, water-conservation systems, security equipment, modular data centers, and other essential personal property.
Makes the sales and use tax exemption available for 30 years beginning on the certification’s effective date. The effective date may be the application date or a prospective date up to five years after the application is submitted.
Allows qualifying investment costs incurred and paid by the data center’s owner, operator, and colocation tenants to be aggregated on a nonduplicative basis when satisfying the investment threshold.
Sets a lower investment threshold for data centers in designated enterprise or federal opportunity zones: at least $200 million, compared with at least $400 million elsewhere in Rhode Island.
Permits an owner or operator to apply for certification through a Commerce Corporation application covering the site, anticipated facility size, investment, labor costs, and expected compliance with the qualified-data-center requirements.
Requires the director to approve or deny a completed application within 60 days. If the director does not act within that period, the application is deemed approved and written certification must be issued within 14 days.
Requires written reasons for a denial and provides the applicant an opportunity to cure deficiencies, making it possible to correct an application instead of receiving an immediately final denial.
Allows a qualified data center to remedy certain shortfalls identified at the sixth-anniversary review through monetary penalties calculated from the unmet investment, labor, or renewable-energy or storage requirement. After review or payment of an applicable penalty, the Commerce Corporation must issue a certificate of compliance within 14 days.
Permits qualified data centers to satisfy the required $10 million renewable-energy or energy-storage investment through either a Rhode Island renewable-energy resource or a Rhode Island energy-storage system.
Allows a certified data center to continue receiving the incentive while meeting ongoing labor requirements through annual compliance reviews and payment of a penalty equal to 7.5 percent of any shortfall in the required annual labor expenditure.
Exempts maintenance work performed on qualified data centers from the labor-peace-agreement requirement that otherwise applies to covered projects under the Labor Standards in Renewable Energy Projects Act.
Sources
failed · StatewideWould, if enacted, require data centers with at least 50 megawatts of projected or actual demand at one site to bear exclusively the electric infrastructure costs needed to serve them, while requiring utilities to establish dedicated rate classes, tariffs, contracts, or other cost-recovery mechanisms for them.Rhode Island H7331 (2026)
What this means
If enacted, this would add meaningful costs and reporting duties for data centers with projected or actual demand of at least 50 MW: they would have to cover attributable electric-infrastructure costs and report water use each year (costs borne exclusively by that data center; annually submit). The 50-MW threshold limits the impact to large facilities, and water plans and restoration security are discretionary, so the bill creates a meaningful but not severe barrier rather than a ban.
People behind it
- Rep. Brian Kennedy
Democratic
Bill sponsor and lead introducer of H7331
- Rep. Samuel Azzinaro
Democratic
Listed bill sponsor and co-introducer of H7331
- Rep. Hagan McEntee
Democratic
Listed bill sponsor and co-introducer of H7331
Show 7 more peopleShow fewer people
- Rep. Teresa Tanzi
Democratic
Listed bill sponsor and co-introducer of H7331
- Rep. Terri-Denise Cortvriend
Democratic
Listed bill sponsor and co-introducer of H7331
- Rep. John Edwards
Democratic
Listed bill sponsor and co-introducer of H7331
- Rep. David Bennett
Democratic
Listed bill sponsor and co-introducer of H7331
- Rep. Mia Ackerman
Democratic
Listed bill sponsor and co-introducer of H7331
- Rep. Katherine Kazarian
Democratic
Listed bill sponsor and co-introducer of H7331
- Rep. Grace Diaz
Democratic
Listed bill sponsor and co-introducer of H7331
Restrictions & requirementsHide restrictions & requirements8
Applies the bill’s requirements to data centers with a projected or actual electric demand of at least 50 MW at a single site.
Requires data centers to bear exclusively all costs reasonably attributable to electric generation, transmission, or distribution facilities needed to serve them, including planning, construction, expansion, operation, and maintenance costs.
Requires electric distribution companies to establish dedicated rate classes, tariffs, contracts, or other cost-recovery mechanisms for covered data centers.
Requires the Energy Facility Siting Board to consult with the Public Utilities Commission on ratepayer impacts and electric cost allocation for applications involving electric facilities intended, in whole or in part, to serve a covered data center.
Allows the Energy Facility Siting Board to condition approval of an application for electric facilities serving a covered data center on the applicant obtaining Public Utilities Commission approval of rates, tariffs, contracts, or other mechanisms that comply with the data-center cost-allocation requirements.
Requires each covered data center to submit an annual report to the Department of Environmental Management describing average daily water withdrawal, peak daily water withdrawal, cooling technologies, and water recycling or reuse practices.
Authorizes the Department of Environmental Management director to require a covered data center to submit a water-efficiency, conservation, or recycling plan as a condition of a permit.
Authorizes the Department of Environmental Management director to require financial assurance, in a form acceptable to the department, to ensure site restoration if a covered data center is abandoned or ceases operations.
Benefits & exceptionsHide benefits & exceptions2
Requires electric distribution companies to create one or more dedicated rate classes, tariffs, contracts, or other cost-recovery mechanisms for qualifying data centers, providing a specific framework for obtaining electric service. This applies only to facilities with projected or actual demand of at least 50 MW at one site, and the data center must bear the costs reasonably attributable to facilities needed to serve it.
Preserves data centers’ participation in regional transmission organizations and federally regulated wholesale electricity markets, along with their obligations under federal reliability standards, by stating that the measure does not alter those arrangements.
Sources
failed · StatewideWould require qualifying data centers to bear all electric-system costs reasonably attributable to serving them, covering facilities with projected or actual electric demand of at least 50 MW at a single site, while preventing recovery of those costs from residential and other commercial customers and requiring dedicated rates, tariffs, contracts, or cost-recovery mechanisms.Rhode Island S2776 (2026)
What this means
For data centers with demand of at least 50 MW, the bill would make them pay the costs of electric infrastructure needed to serve them, rather than shifting those costs to other customers (costs would be borne exclusively by the data center). It would also require annual water-use reports and could add water-plan, restoration-assurance, and utility-approval steps, creating meaningful costs and possible delays.
People behind it
- Louis P. DiPalma
Democratic
Senator and bill sponsor; listed as an introducer of S2776.
- Frank Ciccone
Democratic
Senator and bill sponsor; listed as an introducer of S2776.
- John Burke
Democratic
Senator and bill sponsor; listed as an introducer of S2776.
Show 4 more peopleShow fewer people
- Lori Urso
Democratic
Senator and bill sponsor; listed as an introducer of S2776.
- Public Utilities Commission
Would administer the electric cost-allocation requirements, including requiring dedicated data-center rates, tariffs, contracts, or other recovery mechanisms.
- Energy Facility Siting Board
Would administer siting provisions for energy facilities serving data centers and consult with the Public Utilities Commission regarding ratepayer impacts and cost allocation.
- Department of Environmental Management
Would administer data-center water-use disclosures and could require water-efficiency plans and site-restoration financial assurance.
Restrictions & requirementsHide restrictions & requirements6
Data centers with a projected or actual electric demand of 50 MW or more at a single site must bear exclusively the costs reasonably attributable to planning, constructing, expanding, operating, or maintaining generation, transmission, or distribution facilities needed to serve them; those costs cannot be recovered from residential or non-data-center commercial customers. (costs ... shall be borne exclusively by that data center)
Electric distribution companies must establish one or more dedicated rate classes, tariffs, contracts, or other cost-recovery mechanisms for data centers covered by the 50-MW threshold. (establish one or more dedicated rate classes)
For an application involving generation, transmission, or distribution facilities intended wholly or partly to serve a covered data center, the Energy Facility Siting Board must consult the Public Utilities Commission about ratepayer impacts and electric cost allocation, and may condition approval on the applicant obtaining PUC approval of compliant rates, tariffs, contracts, or other mechanisms. (may condition approval)
Each covered data center must annually report to the Department of Environmental Management its average and peak daily water withdrawals, cooling technologies, and water-recycling or reuse practices. (shall annually submit)
The Department of Environmental Management director may require a covered data center to submit a water-efficiency, conservation, or recycling plan as a condition of a permit issued under Title 46. (may require a data center)
The Department of Environmental Management director may require financial assurance, in an acceptable form, to ensure site restoration if a covered data center is abandoned or ceases operations. (may require financial assurance)
Benefits & exceptionsHide benefits & exceptions2
For a data center with projected or actual demand of at least 50 MW at one site, the Public Utilities Commission must require dedicated rate classes, tariffs, contracts, or other cost-recovery mechanisms to provide electric service. The data center must pay costs reasonably attributable to facilities needed to serve it, while those costs cannot be recovered from residential or non-data-center commercial customers.
The Energy Facility Siting Board is the central licensing and permitting authority for major energy facilities, including facilities intended in whole or in part to serve a qualifying data center. Other agencies generally provide findings and recommendations to the board rather than issuing separate permits, which creates a consolidated state permitting process.
Sources