Wolf Township

Neutral Data Center Policies

Wolf Township allows data centers in its Industrial District with conditional-use approval, but setbacks, height limits, and site, access, waste, and screening requirements add costs and review steps.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Wolf Township
Requires data centers to obtain conditional-use approval in industrial districts and meet specific standards for site access, utilities, waste disposal, accessory-building height, buffers, and screening.Wolf Township Zoning Ordinance, Part 4, § 27-443, “Data Centers”

What this means

The measure would clearly allow data centers in the Industrial District through conditional-use approval, creating a path for development. Approval requires site-design, access, waste, and screening standards, which add some work but are not an outright ban or unusually severe barrier. Data centers would be permitted by conditional use.

Restrictions & requirementsHide restrictions & requirements11
  • Data centers require conditional-use approval and are allowed only in the Industrial District. “permitted by Conditional Use in the Industrial District”

  • Data Center Accessory Uses may include generators for temporary backup power, but may not include energy-generation systems intended to supply the data center during normal operations. “shall not include energy generations systems”

  • Site planning must comply with the commercial land-development requirements in § 22-502, in addition to the data-center-specific standards. “site planning requirements contained in § 22-502”

  • Public-street access must use well-defined entrance and exit lanes, with dividers or planting islands separating the exit lanes from entrance lanes. “limited to well-defined entrance and exit lanes”

  • Painted lines, arrows, and dividers must control parking and vehicle circulation, and customer parking and circulation must be separated from delivery drives and loading areas. “Customer parking and circulation shall be separated”

  • Access drives must meet the township’s specified driveway design and construction requirements. “in accordance with the requirements established”

  • Proposed sewage-disposal and water-supply systems must be designed and constructed under the requirements of §§ 22-405 and 22-406. “sewage disposal and water supply systems”

  • Applicants must submit arrangements for collecting, storing, and disposing of solid waste for township approval; the township may request Pennsylvania DEP review. “submitted to the Township for approval”

  • Data Center Accessory Uses may not exceed the height of the principal building. “no greater than the height of the principal building”

  • Buffer yards must comply with the standards in § 27-506. “Buffer Yards shall be in accordance with § 27-506”

  • Screen plantings must comply with the standards in § 27-507. “Screen Plantings shall be in accordance with § 27-507”

Benefits & exceptionsHide benefits & exceptions2
  • Data centers may seek conditional-use approval in the Industrial District, subject to the ordinance’s procedures and standards: “permitted by Conditional Use in the Industrial District”.

  • The ordinance allows a broad range of accessory facilities—including substations, utility lines, cooling and water-treatment facilities, and generators for temporary power interruptions—on the same tract or adjacent parcels developed as a unified project. It excludes power-generation systems intended to supply the center during normal operations: “sources of electrical power such as generators used to provide temporary power”.

Sources

current law · Wolf Township
The Supervisors adopted these provisions as Ordinance No. 2025-01 on December 8, 2025.Wolf Township, Lycoming County — data-center ordinance (No. 2025-01)

What this means

The measure imposes setbacks from homes or other protected places and building-height limits. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements4
  • Only the I district side yard of 25 feet next to a lot in an R district, a 20 foot rear yard, and a 20 foot buffer yard next to a residential district (Section 27-307.2); below 100 feet

  • I district height limit of 40 feet for principal and accessory structures (Section 27-307.2), with accessory uses no taller than the principal building (Section 27-443.3.F); rooftop equipment is not counted or limited

  • Buffer yard of at least 20 feet next to residential districts (Section 27-307.2 note) and buffer yards under Section 27-506 (Section 27-443.4); below 100 feet

  • Screen plantings per Section 27-507 (Section 27-443.5)

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Conditional use in the I Industrial District

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data