City of Williamsport

Anti-Data Center Policies

Williamsport enacted a 180-day period to address zoning gaps that exclude data centers; during it, the city reportedly cannot accept proposals for review. The measure may delay challenges but does not ban every project.

Incentives

Financial Incentive
2

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · City of Williamsport
Declares Williamsport’s zoning rules invalid for excluding data centers and related facilities, and starts a process to revise them.Williamsport City Council Resolution No. 10088

What this means

The measure would start a 180-day process to fix zoning that excludes data centers and related facilities. During that period, the city reportedly could not accept a data-center proposal for review, making it a significant short-term barrier even though the process aims to address the zoning exclusion.

People behind it

  • Presented the resolution; it was prepared with the help of Solicitor Justin Houser. In presenting the resolution

  • The city solicitor who helped prepare the resolution. Prepared with the help of Solicitor Justin Houser

Restrictions & requirementsHide restrictions & requirements1
  • The zoning ordinance excludes data centers and ancillary buildings or uses, including power-generating facilities; Resolution #10088 declares that exclusion substantively invalid and proposes a curative amendment.

Benefits & exceptionsHide benefits & exceptions1
  • Declares the zoning ordinance substantively invalid to the extent it excludes data centers and related buildings or uses, including power-generating facilities, and proposes a curative amendment. The resolution starts a process to address the exclusion but does not itself approve a data center or establish its permitted locations or conditions.

Sources

current law · Williamsport City
City Council adopted Resolution No. 10088 by a 6-0 vote, declaring the zoning ordinance substantively invalid as to data centers and starting a 180-day curative amendment period.Williamsport City, Lycoming County — data-center resolution 10088

What this means

The measure starts a protected period for local officials to fix gaps in their zoning rules. This can delay developers who need to challenge the old rules, but it does not by itself prohibit every data-center project.

Sources

pending · City of Williamsport
Would allow data centers in the city’s heavy manufacturing district only with conditional-use approval and impose data-center-specific rules on siting, noise, utilities, water use, safety, environmental review, and eventual decommissioning.N/A — no enacted Williamsport data-center-specific law or ban identified

What this means

The draft would allow data centers, but only as a conditional use in the MH district, on sites of at least five acres, with substantial setbacks and buffers—significant limits on where and how they could be built (conditional use and minimum lot size). Operators would also face extensive impact studies, annual reporting, a decommissioning bond, and a new conditional-use application for expansions, making development and operation materially harder (impact analysis requirements).

People behind it

  • The ordinance draft identifies City Council as the body enacting the measure; the Council also passed the resolution initiating the zoning review (“by the City Council”).

  • Presented the resolution that began the city’s zoning review process (“In presenting the resolution”).

  • The article says the resolution was prepared with help from the city solicitor (“prepared with the help of Solicitor Justin Houser”).

Restrictions & requirementsHide restrictions & requirements23
  • Data centers would require conditional-use approval in the MH zoning district. “Conditional Use”

  • A data center would need a lot of at least five acres. “A minimum of five (5) acres”

  • Buildings would be limited to 45 feet in height, including rooftop equipment, and one story. “maximum building height”

  • Principal buildings, accessory structures and data-center substations would need 120-foot property-line setbacks, increased to 200 feet from property lines adjoining a sensitive-receptor facility. Parking would need 25-foot setbacks from roads and property lines. “set back at least (120) feet”

  • Impervious coverage by the data center and its accessory uses could not exceed 70% of the lot. “shall not exceed (70%)”

  • Parking would have to provide one space per employee on the largest shift, three visitor spaces, and additional parking for needed company vehicles and equipment. “One space for each employee”

  • At least one off-street loading space would be required, and loading bays could be located on only one façade of the principal building. “only permitted to be located on one façade”

  • Noise would be capped at 50 dBA CNEL at the boundary of property containing a sensitive receptor and 70 dBA at the boundary of other developed property. Sound lasting no more than a cumulative minute per hour could exceed those limits by up to 10 dBA; specified emergencies, snow removal and road repair are exempt. “shall not exceed 50 dBA”

  • Applicants would need preconstruction and post-construction sound studies by a certified or equivalent engineer, reviewed by a City-selected noise-control engineer. The preconstruction study must accompany the conditional-use application; the post-construction study is required before occupancy, and later as-built testing may also be required. “preand postconstruction sound studies”

  • Air, dust, smoke, glare, exhaust, heat, vibration and humidity from an activity would have to be managed so they are not perceptible at or beyond the property line. “not perceptible at or beyond the property line”

  • Data-center equipment would have to be housed in a metered, grounded, pre-engineered metal-encased structure rated to resist an internal electrical fire for at least 30 minutes, with baffles that automatically close in a fire. Battery or other energy-storage systems would have to meet NFPA 855 or similar standards and include battery-specific fire suppression. “resist an internal electrical fire for at least 30 minutes”

  • Before conditional-use approval, applicants would have to verify adequate utility capacity and infrastructure, show that existing customers’ service would not be reduced and usage fees would not increase, and show that cooling and operations would not negatively affect the region. Required off-site infrastructure upgrades would be funded by the developer. A third-party final electrical inspection would be required before occupancy. “upgrades to infrastructure to be funded by the developer”

  • Generators would have to meet EPA Tier 4 emissions standards. Applicants would have to disclose the generator count and aggregate fuel storage before conditional-use approval; later generator increases would be subject to the expansion requirements, and testing would be restricted to weekdays. “EPA Tier 4 emissions standards”

  • Lighting would be subject to shielding, spill-light and operating limits: no more than 0.1 footcandle on residential property or 0.5 initial footcandle on nonresidential property; LEDs could not exceed 3000K; fixtures could not be mounted more than 20 feet above grade; and routine parking and traffic-way lighting would be extinguished within half an hour after closing, subject to stated reduced-lighting or motion-sensor options. “shall at no time exceed 0.1 Footcandle”

  • Substations would require year-round opaque landscaping or an at-least-eight-foot screen wall. On-site substations would have to be on the side or rear of the principal building, screened from public view and outside a required front yard. On-site power lines at or below 34.5 kV would have to be buried. “Onsite power lines of 34.5 kV and below must be buried”

  • Cooling would have to use a closed-loop water-circulation system approved by the municipal engineer, unless the applicant demonstrates to the engineer’s satisfaction that an alternative uses less water and less energy. “closed-loop water circulation system”

  • Operations would have to provide buffer yards and screening along property boundaries, except at site entrances and exits. Enhanced berm-and-planting buffers apply based on building footprint: under 100,000 square feet, 100 feet along street frontage and near sensitive receptors and 50 feet elsewhere; from 100,000 to 250,000 square feet, 150 feet along street frontage and near residential properties or sensitive receptors and 50 feet elsewhere; over 250,000 square feet, 300 feet along street frontage and near those properties or receptors and 50 feet elsewhere. The Planning Commission may waive requirements in this buffer subsection. “minimum 300-foot buffer yard”

  • Before the conditional-use hearing, applicants would have to submit a licensed-professional environmental and community impact analysis, covering such matters as water and electricity demand, traffic, noise, air emissions, emergency services, waste, stormwater, property values and local fiscal effects. Applicants would also have to assess consistency with City and County comprehensive plans and identify critical impact areas and mitigation measures. “Prior to the commencement date of the Conditional Use hearing”

  • Applicants using public water or sewer would have to consult the relevant authorities before applying and provide their written assessment of community impacts and available capacity. Private wells or surface-water withdrawals could serve as the primary cooling source only if the water authority documents that public supply lacks capacity, and a licensed-professional feasibility study is required. Applicants would also need a drought-response plan; untreated wastewater could not be discharged to stormwater systems or surface waters, and pretreatment by dilution is prohibited. “may only be used as a primary cooling water source if”

  • Before land development, applicants would have to submit an emergency response plan for review by the City fire and police bureaus and County emergency management agency. It must address emergency procedures, equipment adequacy, site access and hydrants, biennial first-responder training at the operator’s expense, and annual fire-safety inspections. Identified equipment deficiencies would have to be addressed at the owner’s or operator’s expense, and the facility would need a City-approved Knox Box. “adequate equipment and training will be provided at owner or operator’s expense”

  • Owners would have to file an engineer-certified annual resource-use report by March 1, including electricity and water use, water sources and reuse, and an updated emergency response plan. Failure to report, comply with approval conditions or provide accurate information could lead to a zoning violation and, after due process, possible revocation of the certificate of occupancy. “on or before March 1 of each year”

  • Any physical expansion or equipment increase would require a permit modification and a new conditional-use application for review and approval. “submit a new Conditional Use application”

  • Applicants would have to submit a decommissioning plan addressing removal of data-center equipment and infrastructure and restoration for reuse. Before occupancy, owners would also have to provide financial security equal to 110% of estimated decommissioning cost minus salvageable value; the City could require a new estimate every five years, with security adjusted accordingly. “110% of the estimated decommissioning cost minus the salvageable value”

Benefits & exceptionsHide benefits & exceptions6
  • Data centers are listed as a conditional use in the MH district, providing a route to seek approval there. Conditional Use to the added Data Centers rows under the following column: MH

  • The measure recognizes a range of supporting accessory uses and structures, including backup generators, substations, utility lines, cooling and water facilities, and security buildings. They must be secondary to the data center and on the same tract or adjacent parcels developed as a unified project; energy generation for normal operations is excluded. Ancillary uses or structures secondary and incidental to a Data Center use

  • A dedicated data-center electric substation may be located on the same or adjacent site, or immediately across a road right-of-way, providing a defined option for serving data-center users. specifically for Data Center users on the same or adjacent site

  • Applicants may propose a cooling system other than the required closed-loop system if they demonstrate to the municipal engineer’s satisfaction that it uses less water and less energy. may propose an alternative cooling system

  • Noise limits allow sound to exceed the stated standards by up to 10 dBA for a cumulative minute per hour, and do not apply to specified emergency utility work, snow removal, or road repair. may exceed the standards above by up to ten (10) dBA

  • The noise limits do not apply to a sensitive receptor established next to the data center after the operator receives a certificate of completion or occupancy. established adjacent to the Data Center after the date of issuance

Sources

pending · City of Williamsport
Would require data centers to obtain conditional-use approval and meet specific rules for siting, noise, utilities, environmental impacts, emergency response, and eventual decommissioning.Draft Williamsport data center zoning amendment, proposed Section 1341.39

What this means

The proposal would allow data centers as a conditional use in the MH district, but it limits where they can go and requires extensive studies and reviews before approval (conditional-use requirement; environmental and community impact analysis). Tight height and setback limits, along with a new conditional-use application for expansions, would make building and growing facilities significantly harder (height and setback limits; expansion requirements).

People behind it

  • The draft ordinance says the Council desires to add data center provisions and that the ordinance is enacted by the Council. desires to add provisions

Restrictions & requirementsHide restrictions & requirements26
  • Data centers in the MH district require conditional-use approval rather than being allowed as of right (“C” for Conditional Use).

  • A data center must be built on a site of at least five acres (“minimum of five (5) acres”).

  • Buildings are limited to 45 feet in height, including rooftop equipment, and one story (“maximum building height”).

  • Principal buildings, accessory structures, and data center substations must be at least 120 feet from property lines, or 200 feet from property lines adjoining a sensitive-receptor facility. Parking must be at least 25 feet from public-road rights-of-way and property lines (“set back at least (120) feet”).

  • Impervious coverage by the data center and its accessory uses cannot exceed 70% of the lot (“shall not exceed (70%)”).

  • Parking must include one space per employee on the largest shift, three visitor spaces, and spaces for needed company vehicles and equipment; at least one loading space is required, and loading bays may be on only one façade of the principal building (“One space for each employee”).

  • Noise is capped at 50 dBA CNEL at the boundary of a property containing a sensitive receptor and 70 dBA CNEL at the boundary of other developed properties. A sound lasting no more than one cumulative minute per hour may exceed those limits by up to 10 dBA; specified emergency and public-safety activities are exempt (“shall not exceed 50 dBA”).

  • Applicants must submit pre-construction and post-construction sound studies by a qualified noise-control engineer; the pre-construction study is due with the conditional-use application, and the post-construction study is required before occupancy. Noise violations must be remedied before occupancy, and the City may later request an as-built study (“preand postconstruction sound studies”).

  • Air, dust, smoke, glare, exhaust, heat, vibration, and humidity from the use must not be perceptible at or beyond the property line (“not perceptible at or beyond the property line”).

  • Data center equipment must be housed in metered, grounded, pre-engineered metal structures with a fire rating that resists an internal electrical fire for at least 30 minutes and with baffles that automatically close in a fire. Battery energy storage systems must meet NFPA 855 or similar standards and have battery-specific fire suppression (“resist an internal electrical fire for at least 30 minutes”).

  • Before conditional-use approval, applicants must document adequate utility capacity and safe infrastructure, show that the project will not reduce service to existing customers or increase their usage fees, and fund required off-site utility upgrades. Electrical work must pass a third-party final inspection before occupancy, and the use must not cause electrical interference or line-voltage fluctuations (“upgrades to infrastructure to be funded by the developer”).

  • The power-related requirements call for passive-cooling and daylight design, alternative energy where possible, waste-heat recovery with measurable implementation goals, and LED lighting. Reclaimed water must be used for cooling if available; potable water may be proposed only if the applicant demonstrates that reclaimed wastewater, stormwater, industrial wastewater, or other reclaimed water is unavailable (“If potable water will be proposed for cooling”).

  • Generators must meet EPA Tier 4 emissions standards. Applicants must disclose the generator count and aggregate fuel storage before conditional-use approval; generator testing is restricted to weekdays, and later generator increases are subject to the expansion requirements (“EPA Tier 4 emissions standards”).

  • Lighting is subject to shielding and spill limits: no more than 0.1 footcandle on residential properties or 0.5 initial footcandle on non-residential properties; LED color temperature cannot exceed 3000K, and luminaires cannot be mounted more than 20 feet above the illuminated grade. Parking and traffic-way lighting generally must switch off within 30 minutes after closing, subject to specified reduced-activity and security-lighting allowances (“shall at no time exceed 0.1 Footcandle”).

  • Substations require year-round opaque landscaping or a screen wall at least eight feet high. On-site substations must be beside or behind the principal building, screened from public view, and outside a required front yard; on-site power lines of 34.5 kV or less must be buried (“minimum of 8 feet in height”).

  • Cooling must use a closed-loop water circulation system unless the applicant demonstrates to the municipal engineer’s satisfaction that an alternative uses less water and less energy (“closed-loop water circulation system”).

  • Sites must provide boundary buffers and screening, with enhanced berm-and-planting buffers along collector or arterial roads and near sensitive receptors. Required buffer widths vary by building footprint: under 100,000 square feet, 100 feet along street frontage and near receptors and 50 feet elsewhere; 100,000–250,000 square feet, 150 feet along street frontage and near receptors and 50 feet elsewhere; over 250,000 square feet, 300 feet along street frontage and near receptors and 50 feet elsewhere. The Planning Commission may waive specified buffer requirements (“combined footprint of the principal structure or structures”).

  • The buffer rules also prescribe dense plantings, including specified numbers and minimum sizes of evergreen, canopy, ornamental, and shrub plantings, with a complete visual screen at least 12 feet high required within three years. No impervious surface is allowed in a buffer except access drives, sidewalks, and associated improvements (“complete visual screen”).

  • Before the conditional-use hearing begins, the applicant must provide an environmental and community impact analysis by a qualified professional. It must address, among other things, water and electricity demand, traffic, emergency services, property values, stormwater, waste, noise, air emissions, and effects on sensitive environmental areas; the applicant must also provide specified site, permit, and financial-impact information (“Prior to the commencement date of the Conditional Use hearing”).

  • Applicants using public water or sewer must consult the relevant authority before applying and submit its written assessment of community impacts and available capacity. Private wells or surface-water withdrawals may be used as the primary cooling source only if the water authority documents that public supply lacks capacity, and then a licensed-professional feasibility study is required. Applicants must provide a drought-response plan; untreated wastewater cannot be discharged to stormwater systems or surface waters, and dilution pretreatment is prohibited (“Private wells or direct withdrawals”).

  • Sensitive-receptor sites require equipment such as substations, generators, and HVAC units to be oriented away from receptors unless physically impossible, with screening provided (“oriented away from abutting Sensitive Receptors”).

  • Applicants must provide a qualified-professional emergency response plan for review by local fire, police, and county emergency-management agencies. The plan must address response procedures, equipment and access adequacy, biennial first-responder training at the operator’s expense, and annual fire-safety inspections; identified equipment deficiencies must be addressed at the owner’s or operator’s expense. A City-approved Knox Box is also required (“adequate equipment and training will be provided at owner or operator’s expense”).

  • Owners must submit an annual resource-use report by March 1, covering electricity, water, reuse, and an updated emergency response plan. The report must be certified by a licensed professional engineer and is generally open to public inspection; failure to report, comply with approval conditions, or provide accurate information can lead to enforcement and potential occupancy-certificate revocation after due process (“on or before March 1 of each year”).

  • Any physical expansion or equipment increase requires a permit modification and a new conditional-use application for review and approval (“Any physical expansion or equipment increase”).

  • Applicants must submit a decommissioning plan covering removal of data-center equipment and related infrastructure and restoration for reuse of the site; the plan prioritizes responsible recycling and disposal of electronic equipment through certified e-waste recyclers (“submit a decommissioning plan”).

  • Before occupancy, the owner must provide financial security for decommissioning equal to 110% of estimated cost minus salvageable value. The City may require a new cost estimate every five years and adjust the security; the owner pays the review fees (“110% of the estimated decommissioning cost”).

Benefits & exceptionsHide benefits & exceptions3
  • Data centers are added as a conditional use in the MH district, creating a route to seek approval there, but they are not permitted by right. “Conditional Use to the added Data Centers rows”

  • The measure recognizes data-center accessory infrastructure, including substations, utility lines, cooling and water facilities, and generators for temporary backup power. These uses or structures must be secondary and incidental to the data center and located on the same tract or adjacent parcels developed as a unified project; energy generation intended to supply normal operations is excluded. “including but not limited to”

  • The specified noise limits do not apply to a sensitive receptor established adjacent to a data center after its certificate of completion or occupancy is issued, protecting the facility from those limits as to later-adjacent receptors. “established adjacent to the Data Center after”

Sources

pending · Williamsport City
City Council began a 180-day curative amendment process with Resolution No. 10088 on June 25, 2026, and the city posted the draft on September 29, 2026, with no hearing yet scheduled.Williamsport City, Lycoming County — proposed data-center ordinance (None Adopted)

What this means

The proposal would impose cooling and water-use rules, money set aside for eventual removal and noise limits and sound testing. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements25
  • Conditional use; no expiration of approval stated, Section 1333.05

  • Section 1341.39.V requires a permit modification and a new conditional use application for any physical expansion or equipment increase, but no like-for-like replacement exemption is stated.

  • Single 60 dBA CNEL limit at sensitive receptors, 70 dBA elsewhere, Section 1341.39 H

  • dBC and octave band compliance must be shown; no numeric limit, Section 1341.39 H

  • Pre-construction and post-construction sound studies, Section 1341.39 H

  • Generator testing on weekdays only; no hours cap, Section 1341.39 K(3)(d)

  • Noise/Vibration heading only; no vibration standard, Section 1341.39 H

  • Wells only if public supply insufficient, with feasibility study; no pump tests, Section 1341.39 O

  • Closed-loop required; alternatives allowed, evaporative not restricted, Section 1341.39 O

  • Daily use disclosed and drought plan; no cap or ongoing reporting, Section 1341.39 O and S(7)

  • EPA Tier 4 generators; no annual testing or reports, Section 1341.39 K(3)

  • Waste heat recovery and heat island impacts addressed; no thermal impact plan, Section 1341.39 K and S

  • Utility capacity verified before approval and third-party electrical inspection before occupancy, Section 1341.39 K

  • Backup generators addressed; primary generation excluded from the use, Section 2

  • Substations screened 8 ft and lines of 34.5 kV or less buried; no placement rule, Section 1341.39 R

  • 100 ft to 300 ft planted buffer within 500 ft of residences and sensitive receptors, Section 1341.39 R.

  • Substation and roof equipment screened; 12-ft landscape screen; no acoustic screening, Section 1341.39 R

  • Line-of-sight study for screening; no renderings, Section 1341.39 R(1)

  • Emergency plan, radio coverage, 24-hour signage; no fire company review or annual update, Section 1341.39 U

  • Fuel storage disclosed before approval; no containment rule, Section 1341.39 K(3)

  • Section 1341.39.U(1)(f) requires annual fire safety inspections by a qualified professional for the data center, and Section 1341.39.K(2) requires a third-party electrical inspection before occupancy, but no report to the fire official or deadline to correct deficiencies is required.

  • Trip narrative only; no traffic study, Section 1341.39 S(1)

  • Plan and 110% security minus salvage; no closure notice or removal deadline, Section 1341.39 W and X

  • One post-construction sound study before occupancy, Section 1341.39 H

  • City-selected engineer reviews sound studies; cost assigned only for decommissioning estimate review, Section 1341.39 H and X

Benefits & exceptionsHide benefits & exceptions1
  • Proposed approval pathway: Proposed: conditional use in the MH column of the use table