Wilkins Township allows data centers in C-1 and M-1 districts with conditional-use approval, but noise, setback, water and sewage rules, studies, and operating standards add costs. Although one description calls the ordinance proposed, it is labeled enacted.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Township of WilkinsAllows data centers in C-1 and M-1 zones only with conditional-use approval and sets rules for their height, setbacks, energy, backup power, noise, water, wastewater, screening, vibration, landscaping, and parking.Wilkins Township Zoning Ordinance, Chapter 450 (data center-specific provisions, including proposed Ordinance No. 1142)
What this means
The measure creates a path to build data centers in C-1 and M-1 districts through conditional-use approval, which is a modest benefit. But developers would face meaningful requirements, including noise and vibration studies, limits on water and sewage sources, and building and operating standards, so the overall effect is only slightly supportive. Conditional-use districts Operating requirements
People behind it
- Wilkins Township Board of Commissioners
Identified in proposed Ordinance No. 1142 as the body seeking to add the data center provisions and as the body enacting the ordinance.
Restrictions & requirementsHide restrictions & requirements14
Data centers and accessory uses require conditional-use approval and are allowed only in C-1 Commercial and M-1 Manufacturing districts, rather than as a permitted use throughout the Township. Conditional Use in the C-1 and M-1 Zoning Districts
Building height is capped at 120 feet in C-1 and 60 feet in M-1; accessory-use structures may not exceed the principal building’s height. Buildings and accessory uses must be centered on the parcel and set back 30 feet on all sides. maximum building height
Energy use must meet the latest ASHRAE 90.4 Energy Standard for Data Centers. latest version of ASHRAE 90.4
Nonrenewable on-site backup generation may be used only for emergencies when local grid power is unavailable; daily power needs must come from the grid or renewable sources. The definition of accessory uses also excludes energy-generation systems intended to supply normal operations. only be used for emergency back-up power
Backup and emergency generator testing is limited to 9:00 a.m. through 5:00 p.m. between the hours of 9am and 5pm
Windmills and wind turbines are prohibited as renewable-energy sources and may not be erected or installed. Windmills and wind turbines are prohibited
Screening is required for mechanical equipment, backup-power equipment, and dumpsters within 30 feet of a public road, residential zoning district, or sensitive-receptor lot line. Certain roof- or ground-level equipment visible from a height of 20 feet at an adjacent property line also triggers facade screening and design changes at intervals no farther apart than 150 feet or three times the building’s average height, whichever allows the less frequent changes. Screening shall be required
Noise is subject to maximum levels at receiving properties: 60 dB(A) by day and 55 at night for mixed-use residential; 60 by day and 50 at night for residential; and 70 by day and 65 at night for commercial, manufacturing, and industrial zones. The proposed ordinance also says the limits apply or noise may not exceed surrounding ambient levels by more than 10 dB. maximum sound levels
A pre-construction noise study must accompany the initial site-plan submission. A post-construction study is due to the Township Manager 1 to 12 months after the first Certificate of Occupancy. Studies must be prepared by a Pennsylvania-licensed professional engineer; if limits are exceeded, mitigation must be identified and incorporated into the site plan. pre-construction noise study
A vibration study is required to ensure vibration from the data center or accessory use cannot be felt beyond its property line. vibration study shall be required
Public water is the only permitted water source; streams, wells, cisterns, and similar structures cannot supply the use. Public Water shall be the only source
Public sewage is the only permitted means of discharging wastewater and greywater; septic tanks and similar holding structures are prohibited. Public Sewage shall be the only means
A landscaping plan must be provided, including sufficient plantings, planting strips, screening, formal gardens, shade trees, and natural barriers. A landscaping plan shall be provided
Parking must provide one space per six people at maximum permitted occupancy or one space per 600 square feet of gross floor area or lot area devoted to the use, whichever requires more spaces. whichever is greater
Benefits & exceptionsHide benefits & exceptions3
Data centers and their accessory uses may seek conditional-use approval in the C-1 Commercial and M-1 Manufacturing districts. Approval is not automatic; the application must satisfy the applicable procedures and criteria. Conditional-use eligibility
The measure expressly includes a range of accessory facilities—such as electrical substations, utility lines, cooling and water facilities, and security buildings—when they are secondary to the data center and located on the same lot as part of a unified development. It excludes energy-generation systems intended to supply normal operating power. Accessory-use definition
The measure sets specific dimensional limits: maximum data-center height is 120 feet in C-1 and 60 feet in M-1; accessory uses may be no taller than the principal building; and buildings must be centered on the parcel with 30-foot setbacks on all sides. Dimensional standards
Sources
current law · Wilkins TownshipThe Board of Commissioners adopted Ordinance No. 1142 on March 30, 2026, adding these rules to Chapter 450 (Zoning) as Section 450-50T.Wilkins Township, Allegheny County — data-center ordinance (No. 1142)
What this means
The measure imposes noise limits and sound testing, setbacks from homes or other protected places and water-supply requirements. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.
Restrictions & requirementsHide restrictions & requirements9
60 dBA day and 50 dBA night at residential lot lines, up to 70 and 65 dBA at commercial and industrial lots, § 450-50T(8), Table 1
Preconstruction study with site plan and post-construction study, § 450-50T(8)(e)-(f)
Generator testing only 9 a.m. to 5 p.m., § 450-50T(5)
Vibration study; none felt beyond property line, § 450-50T(9).
Public water only; wells, streams, and cisterns barred, § 450-50T(10)
Grid or renewable power only; on-site fossil generation limited to backup, § 450-50T(4)
Equipment within 30 ft of road, residential district, or sensitive receptor screened, § 450-50T(7)(a)
Post-construction noise study after opening, § 450-50T(8)(f)
Township Manager enforces noise studies and mitigation, § 450-50T(8)(h)
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Conditional use in the C-1 and M-1 districts
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data