West Providence Township
Anti-Data Center Policies
West Providence Township’s enacted ordinance requires setbacks, cooling and water-use controls, and noise limits with sound testing. Approval remains possible, but these limits narrow where and how data centers can operate.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · West Providence TownshipThe rules are in Ordinance No. 07-13-26, which the Board of Supervisors adopted on July 13, 2026, according to the signed copy.West Providence Township, Bedford County — data-center ordinance (No. 07-13-26)
What this means
The measure imposes setbacks from homes or other protected places, cooling and water-use rules and noise limits and sound testing. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.
Restrictions & requirementsHide restrictions & requirements25
Supervisors approve applications with a land development plan; no conditional use hearing, Section 7
Section 5.C(2) applies the 1,000 ft residential setback to all principal buildings, accessory structures, and substations, and the Data Center Accessory Use definition includes generators, cooling towers, and related equipment (local copy of the ordinance).
65-ft height limit; no rooftop equipment limit, Section 5.B
100-ft riparian forest buffer on each side, wider on steep slopes and at wetlands, Section 5.Y
Single 57 dBA CNEL limit at property lines, Section 5.F
Water feasibility study for non-public sources; no bar on wells for cooling, Section 5.S
Section 5.V(2)(d) and (e) require a Closed Loop Cooling System that recirculates water in a sealed system and bar open-loop, once-through, and discharge-based cooling, but the closed-loop definition allows heat release through a cooling tower and no water-use rate or noise showing is set for evaporative systems.
Projected water demand disclosed, Section 5.S
Sewer capacity certification and discharge description; no cooling discharge plan, Section 5.S
Stormwater plan under the SALDO and DEP rules, Section 5.U
Tier 4 generators required; no emissions testing or reports, Section 5.M
Heat islands must be disclosed in the impact analysis, Section 5.Q
Disposal of materials must meet state and federal rules, Section 5.Q
Utility capacity verification and a third-party final electrical inspection, Section 5.I
On-site generation addressed and required for critical operations, Section 5.M
Substations screened and placed at the side or rear, and on-site lines of 34.5 kV or less buried, Section 5.L
Planted buffer of 100 to 300 ft along lines within 500 ft of homes, Section 5.P.
Ground equipment fully screened and rooftop equipment screened on all sides; no 12-ft or acoustic standard, Section 5.P
Emergency Response Plan to county and fire department, radio coverage, and 24-hour contact signage; no annual updates, Sections 5.N and 5.T
Applicant must confirm responders have needed supplies; no funding, Section 5.T
Stored materials must be disclosed; no storage setbacks or containment, Section 5.Q
Third-party electrical inspection; no annual fire inspection, Section 5.I
Vehicle trips described only; no traffic study
Security of 100% of cost net of salvage; no 110% or removal deadline, Section 6
General $600 civil penalty, and approval revoked if altered out of conformity, Section 7