West Pennsboro Township

Anti-Data Center Policies

West Pennsboro Township requires conditional-use approval and imposes site, water, and noise requirements on data centers, increasing costs without banning them.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · West Pennsboro Township
Requires data centers in the Industrial District to get conditional-use approval and meet rules for their sites, utilities, traffic, water supply, and noise.West Pennsboro Township Zoning Ordinance No. 2025-03

What this means

Data centers would need conditional-use approval in the Industrial District, at least 25 acres, public water and sewer, and a water-feasibility study. These requirements create significant hurdles and costs, but do not ban data centers outright.

People behind it

  • Responsible for administering the ordinance.

Restrictions & requirementsHide restrictions & requirements8
  • Data Processing Centers require conditional-use approval and must satisfy the ordinance’s approval criteria. The Board of Supervisors must hold a public hearing; the application must be submitted at least four weeks before a regular Planning Commission meeting and sent to the Commission at least 30 days before the hearing. Administrative review may take up to two weeks before the 60-day hearing period begins.

  • A center must be on a lot of at least 25 acres and 200 feet wide. Lot and impervious coverage may not exceed 70%; setbacks must be at least 150 feet front, 100 feet side, and 150 feet rear; and building height may not exceed 75 feet.

  • Public water and public sewer are required.

  • The site must front on and have direct vehicle access to a Minor Arterial or Major Collector Street. A traffic impact study prepared by a Registered Design Professional must be reviewed and approved by the Township Engineer.

  • The zoning-permit application must include a qualified professional’s water feasibility study assessing projected demand and effects on nearby wells, streams, and groundwater. Approval requires sufficient water and no adverse impact on nearby existing wells. Susquehanna River Basin Commission review and approval is also required if withdrawals reach 100,000 gallons per day or consumptive use reaches 20,000 gallons per day, averaged over 30 days.

  • The applicant should provide an electric interconnection agreement showing that capacity is available and the center will be served, and note known project-related effects on electric rates or availability for other uses.

  • An independent noise-study expert must conduct a noise study at the applicant’s expense. Center noise may not exceed 70 dBA at the property line, except during a power outage.

  • The application must describe on-site processing, materials, products, waste handling, operational scale and staffing, and likely environmental impacts and mitigation. The applicant must provide expert evidence that impacts meet applicable standards, and the Zoning Officer may request additional information.

Benefits & exceptionsHide benefits & exceptions5
  • Data processing centers are allowed as a conditional use in the Industrial District, subject to approval and applicable requirements. Data Processing Center

  • Data centers may be up to 75 feet tall, above the Industrial District’s general 50-foot limit. They must be on a lot of at least 25 acres, and lot coverage is capped at 70%. Maximum Building Height

  • Zoning permits must be issued or rejected within 90 days, and conditional-use hearings and decisions have specified deadlines. A conditional use may be deemed approved if the Township misses the applicable deadline, unless the applicant agrees to an extension. Permit review deadline

  • For a filed conditional-use application that would ultimately involve subdivision or land development, a later ordinance amendment generally cannot adversely affect the application, and the applicant may proceed under the rules in effect when it was filed. The Township may refuse an application or permit if a prohibitory amendment is pending. No change or amendment

  • A lawful nonconforming use may continue and may be expanded or altered by conditional use, but the total expansion or alteration cannot exceed 50% of the area devoted to the use when it became nonconforming. Any nonconforming use may be expanded or altered

Sources

current law · West Pennsboro Township
The rules are in Section 3.04(I)4 of Ordinance 2025-03, the new zoning ordinance the Board of Supervisors adopted on August 25, 2025.West Pennsboro Township, Cumberland County — data-center ordinance (No. 2025-03)

What this means

The measure imposes noise limits and sound testing, water-supply requirements and minimum site-size requirements. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements12
  • Conditional use with Board of Supervisors hearing; no expiration of approval, Table 3.01 and § 1.16(F)

  • 75-ft maximum height, § 3.04(I)4.a(6)

  • Water study maps streams within 1,000 ft and effects on streams, § 3.04(I)4.e

  • Single 70 dBA limit at property line, § 3.04(I)4.g

  • Noise study with application only, § 3.04(I)4.g

  • Noise limit waived during power outages; no testing limits, § 3.04(I)4.g

  • Water feasibility study with safe yield and well impacts; no ban on wells for cooling, § 3.04(I)4.e

  • Projected water needs calculations required, § 3.04(I)4.e(1)

  • Study must identify how water is recycled or released, § 3.04(I)4.e(7)

  • Utility interconnection agreement advised ("should"), not required, § 3.04(I)4.f

  • Section 3.04(I)4.d requires a traffic impact study for every data processing center, prepared under the Subdivision and Land Development Ordinance requirements and approved by the Township Engineer, but the zoning text does not require coverage of construction traffic or a study area reaching the nearest arterial or interchange, and those SALDO requirements are not in the text read.

  • Noise study by independent expert paid by applicant; no municipal review cost, § 3.04(I)4.g

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Conditional use in the Industrial (I) district

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data