West Penn Township

Anti-Data Center Policies

West Penn Township allows data centers only in industrial districts with supervisors’ conditional-use approval, but setbacks, minimum site sizes, noise limits, and water and cooling requirements can narrow suitable sites and add costs or delays.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · West Penn Township
Restricts data centers to industrial districts with township approval, requires a 1,000-foot buffer from residential districts and water-reuse and water-study measures, and sets noise limits of 40–50 decibels.West Penn Township Data Center Ordinance

What this means

The ordinance allows data centers, but only in industrial districts and with supervisor approval as a conditional use (approval by supervisors). The 1,000-foot residential setback, lower noise limits, and water-system requirements could make suitable sites harder to find and add meaningful costs and delays (setback and noise limits).

People behind it

  • Was tasked with preparing the draft data center ordinance.

  • Sent the draft for planning commission review and adopted the ordinance.

Restrictions & requirementsHide restrictions & requirements7
  • Data centers are permitted only as a conditional use in industrial districts, requiring approval by the township supervisors: only be permitted as a conditional use in industrial districts.

  • A data center must be at least 1,000 feet from residential districts: a minimum of 1,000 feet from residential districts.

  • Noise limits are set at 40 to 50 decibels: range between 40 and 50 decibels.

  • Data centers must have a water recirculation system: must have a water recirculation system.

  • On-site wells cannot be used for cooling if public water is available: wouldn’t be able to use on-site wells for cooling purposes if public water is available.

  • If using nonpublic water, a data center must complete a water feasibility study: complete a water feasibility study.

  • Where public water is unavailable, a data center must meet the township’s water-extraction requirements under a separate ordinance: meet a stringent set of water extraction requirements.

Benefits & exceptionsHide benefits & exceptions1
  • Data centers may be built as a conditional use in industrial districts, subject to approval by township supervisors (“only be permitted as a conditional use in industrial districts”).

Sources

current law · West Penn Township
The township secretary said the Board of Supervisors adopted this text as Ordinance 2 of 2026 at the October 5, 2026 hearing, and the final version is expected from the Solicitor by the November meeting.West Penn Township, Schuylkill County — data-center ordinance (Ordinance 2 of 2026)

What this means

The measure imposes setbacks from homes or other protected places, minimum site-size requirements and cooling and water-use rules. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.

Restrictions & requirementsHide restrictions & requirements29
  • Conditional use with a hearing; no expiration of approval, Sections 3 and 4Q

  • Buffer widths scale with footprint, but no footprint or megawatt cap, Section 4P(3)

  • Riparian forest buffer of 100 ft on each side, widened on slopes of 10% or more and by 25 ft at wetlands, Section 4Y(6)-(8)

  • Section 4F(1)(a) sets a CNEL of 40 dBA from 7 p.m. to 7 a.m. and 45 dBA from 7 a.m. to 7 p.m. at the property line, with CNEL defined in Section 2 as the midnight-to-midnight A-weighted average, and Section 4F(2)(b) requires ANSI-described sound level meters and generally accepted methodology.

  • 50 dBC at night and 60 dBC by day at the property line, Section 4F(1)(a)

  • Noise study with the application and as-built study after 90 days of occupancy; no building permit study, Section 4F(2)

  • Vibration study showing no vibration perceptible beyond the property line, Section 4F(5).

  • Closed-loop cooling required unless an alternative uses less water and energy, Section 4R(2).

  • Drought response plan and projected water needs; no cap or usage reporting, Section 4R(4)(a) and (6)

  • Stormwater management plan required under the SALDO, Section 4U(3)

  • Generators must meet environmental standards and Tier 4 is to be considered, not required, Section 4M

  • Heat must not be perceptible beyond the property line and heat islands addressed in the impact analysis, Sections 4G and 4Q(5)

  • Utility capacity verification and third-party electrical inspection, both before occupancy rather than before approval, Section 4I

  • Rooftop solar required on buildings over 400,000 sq ft where feasible and solar-ready roofs; no energy usage plan, Section 4Z

  • Substations screened by 8-ft landscaping or wall and placed to the side or rear, and on-site lines of 34.5 kV or less buried, Section 4L

  • Buffer yard of 100 to 300 ft with dense plantings next to residential property lines or zones within 500 ft, Section 4P(3).

  • Full cutoff fixtures and 0.1 footcandle limit at homes; light may cross the property line, Section 4J

  • Ground and rooftop equipment fully screened; no 12-ft equipment screen and acoustic barrier only at the zoning officer's discretion, Sections 4F(3) and 4P(2)

  • Line-of-sight study for service area screening; no renderings, Section 4P(1)

  • Emergency Response Plan filed with county and township emergency management, radio coverage, and 24-hour contact sign; no fire company review or annual updates, Sections 4N and 4T

  • Applicant must provide local responders with the chemicals and supplies needed for a fire, Section 4T(2).

  • Types and storage duration of materials disclosed; no storage setbacks or containment, Section 4Q(1)

  • Third-party final electrical inspection before occupancy; no annual inspections, Section 4I(5)

  • Vehicle trips described in the impact analysis; no traffic study, Section 4Q(1)

  • 100% security, immediate notice, and removal within 12 months, decommissioning section (labeled Section 3) A(1)-(2)

  • Cost estimate updated every 10 years, and obligations carry over at transfer, decommissioning section (labeled Section 3) A(2) and (4)

  • One as-built noise study after 90 days of occupancy, Section 4F(2)(a)

  • Section 6A(2) states that approval is revoked if the operation is altered so it no longer conforms, and Section 6C provides civil enforcement before a district justice with fines up to $5,000 a day, but no notice and hearing is required before revocation.

  • Section 6B requires the applicant to pay all land development application fees and engineer review fees, Section 6A(4) and (5) require an approved land development plan reviewed under the SALDO, and Section 4F(2) sends the noise study to the Township Engineer for review.

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Conditional use in the HC, LI/B, CI, and EI Districts

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data