Pennsylvania requires data centers over 25 megawatts to obtain local approvals and meet power, grid-cost, environmental, and community commitments; covered facilities also face annual energy and water reporting. These rules make large projects harder, not impossible, while eligible centers may receive equipment tax breaks.

Rating and summary from Pennsylvania statewide as there are no scored current or future laws outside temporary restrictions for West Lampeter Township.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

pending · West Lampeter Township
Begins reviewing and drafting zoning rules for potential data centers, including definitions, siting rules, and resource protections; no new ordinance has been adopted yet.N/A — no data center-specific law or ban identified

People behind it

  • Directed by the Board of Supervisors to review ordinances and draft potential zoning language for data centers.

Sources

pending · West Lampeter Township
The draft has no ordinance number, and the township said the Planning Commission did not meet in September 2026 for lack of a quorum and that the draft will be on its November 10, 2026 agenda and possibly its December agenda before it returns to the Board of Supervisors with comments.West Lampeter Township, Lancaster County — proposed data-center ordinance (None Adopted)

What this means

The proposal would impose noise limits and sound testing, setbacks from homes or other protected places and building-height limits. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements25
  • Draft Section 285-48.A(17)(e) caps structures at 40 feet and limits roof-mounted equipment to 10 feet above the roof, with screening of rooftop components in subsection (f), but the district height limit for other principal buildings is not in the amending text.

  • Table sets 70 dBA day and 65 dBA night only next to the CH district; the A, R-3, MSL, and RV rows are blank and other districts are not listed, so the least protective case has no limit, Table 285-48.A(17)(g)

  • Pre-construction study records existing levels, but no background cap is set, draft § 285-48.A(17)(g)[2][a]

  • Numeric dBC limits (80 day, 65 night) only next to CH, other rows blank; pre- and post-construction studies must address low-frequency propagation, draft § 285-48.A(17)(g)[2][a]-[b] and Table

  • Pre-construction study with the initial plan and post-construction study after occupancy, draft § 285-48.A(17)(g)[2][a]-[b]

  • Generator testing between 7:00 a.m. and 7:00 p.m. only; no hours cap, draft § 285-48.A(17)(g)[2][d]

  • Water feasibility study including wells within 1,000 ft; no pump tests or well limits, draft § 285-48.A(17)(i)[1][a]

  • Water used for cooling must be disclosed, draft § 285-48.A(17)(i)[1][a](i)

  • Projected water needs disclosed; no cap, reporting, or drought plan, draft § 285-48.A(17)(i)[1][a](i)

  • Cooling wastewater disposal approved by the SEO or DEP with the application, draft § 285-48.A(17)(i)[6]

  • Emissions must meet state and federal standards, draft § 285-48.A(17)(i)[3]

  • Plan for removal, recycling, and disposal of servers, batteries, and hazardous materials, draft § 285-48.A(17)(i)[5][a].

  • Generators and fuel cells addressed in screening and noise rules, draft § 285-48.A(17)(f) and (g)

  • Substations are part of the accessory use and must be screened, draft § 285-33 and draft § 285-48.A(17)(f)

  • Berm buffer yard with evergreen screen next to homes; no 100-ft width, draft § 285-48.A(17)(d)

  • Fully shielded fixtures with a 25-ft height limit; no limit on light crossing the line, draft § 285-48.A(17)(g)[1]

  • All equipment screened on all sides, 12 ft for ground equipment, with acoustic screening, draft § 285-48.A(17)(f).

  • Emergency Response Plan accepted by local emergency services; no annual updates or radio coverage, draft § 285-48.A(17)(i)[7]

  • Training procedures for all first responders required, draft § 285-48.A(17)(i)[7]

  • Battery secondary containment at 110%; no storage setbacks, draft § 285-48.A(17)(i)[4]

  • Annual fire safety inspections; no third-party electrical inspection, draft § 285-48.A(17)(i)[7]

  • Decommissioning plan and recorded agreement; no financial security, draft § 285-48.A(17)(i)[5]

  • Draft Section 285-33 defines a Data Center to include artificial intelligence, machine learning, and cryptocurrency mining, and excludes computers secondary to another permitted use such as office servers, but that exclusion states no size or power threshold.

  • One post-construction noise and vibration study, draft § 285-48.A(17)(g)[2]

  • Draft Section 285-48.A(17)(g)[2][e] rescinds the Certificate of Occupancy if required noise or vibration mitigation is not completed, but no notice or hearing is required before rescission.

Benefits & exceptionsHide benefits & exceptions1
  • Proposed approval pathway: Proposed: special exception in the I/M Industrial/Mixed Use District

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data