West Hempfield Township
Anti-Data Center Policies
West Hempfield Township allows data centers as conditional uses in the I-2 district, but size limits, setbacks, and operating requirements significantly restrict feasible projects.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · West Hempfield TownshipAllows accessory data-center facilities in any district, while limiting larger facilities to I-2 industrial areas and requiring safeguards for size, setbacks, noise, water, emergency access, lighting, and decommissioning.Ordinance 6-26 — West Hempfield Township Data Center Regulations (Chapter 145, §703.10; related Chapter 130 amendments)
What this means
The measure would allow data centers as conditional uses in the I-2 district, but caps their combined footprint at 120,000 square feet and requires separation from nearby homes and some farm buildings. Sound studies, water and emergency plans, and other operating rules would add costs and make approval and operation harder, though green roofs can allow a larger footprint.
Restrictions & requirementsHide restrictions & requirements18
Primary data centers and conversions of buildings existing as of January 1, 2026, to data centers require conditional-use approval in the I-2 General Industrial District. Accessory data centers are exempt if they are compact, support one entity’s internal IT operations, are accessory to the principal use, and are not in a separate structure. conditional-use approval
In I-2, data center footprint is capped at an aggregate 120,000 square feet. A green roof covering at least 30% of total roof area allows a 10% increase; coverage of at least 75% allows an increase of up to 30%. 120,000 square feet
Buildings must meet the zoning district’s minimum setback or a setback equal to the tallest proposed data center building’s height, whichever is more restrictive. If the site abuts a residential use or district, data center buildings must also be at least 1,000 feet from R-1, R-2, or R-3 property lines and existing dwelling units in any district. minimum required by the zoning district
If the site abuts an existing agricultural structure housing livestock or poultry, noise-producing data center buildings and accessory uses must be at least 1,000 feet from that structure. at least 1,000 feet
Structures are limited to 75 feet in height, and roof-mounted mechanical or accessory equipment may not extend more than 20 feet above the roof. Maximum permitted height
Non-noise-producing accessory structures must be at least 50 feet from property lines and adjoining rights-of-way; noise-producing accessory structures must meet the data center’s setbacks. at least 50 feet
Noise-producing equipment must be positioned so the data center building lies between the equipment and an affected residential lot or livestock/poultry building. Where multiple residentially adjacent sides exist, equipment must be placed on the non-abutting side or the side with the greatest setback, with preference given to existing residences. data center is between the affected lot and the equipment
Facades facing a road or a district that permits residential use must include at least two specified design elements every 150 horizontal feet on the first floor; if more than two sides qualify, their design and materials must be consistent. Upper floors must be matte white. at least two of the following design elements
Loading spaces or bays may be located on only one side facade of the principal data center building. only permitted to be located on one side façade
Applicants must submit pre- and post-construction sound studies examining exterior sound-producing equipment. Where residential or livestock/poultry receptors are adjacent, the pre-construction study must document ambient noise; the post-construction study is due before occupancy and must show noise at the relevant property line is no higher than pre-construction levels. prior to an occupancy permit
Sound-producing rooftop and ground-mounted equipment must be fully screened from view, with screening positioned to shield the direction of emitted sound. Data center screening must also meet the industrial performance standards; where the general screening rule applies, vegetative screening may be supplemented but not replaced by opaque fencing or walls. fully screened from view
Public water and sewer must be provided, and applicants must provide evidence that utility providers have sufficient capacity. Proposals must include the latest water-conservation technology, including closed-loop systems to reduce public-water demand. Public water and sewer facilities
Applicants must demonstrate an adequate second means of site ingress and egress suitable for emergency access. adequate second means of ingress and egress
Owners must submit an emergency response plan prepared by a qualified professional and reviewed and accepted by the local fire department and emergency management services during land development review. It must address fire suppression, containment, ventilation, evacuation, emergency-equipment access, first-responder training, and annual fire-safety inspections. reviewed and accepted by the local fire department
A decommissioning plan must be included with the land development submission, showing how the site will be returned to a neutral state and how electronic waste and other hazardous materials will be handled and removed. submitted as part of any land development submission
Data centers must provide one parking space per employee on the largest shift, plus three visitor spaces. three visitor spaces
Lighting is subject to limits including full cut-off or shielding for horizontal lighting, no more than 0.1 footcandle at residential uses and 0.5 initial footcandle at non-residential uses, a 3000K maximum LED color temperature, and a 20-foot maximum fixture height. Parking-area and traffic-way lighting must be extinguished within half an hour after closing; after-hours safety lighting is limited to 25% of regular-hours fixtures, with specified alternatives for continued nighttime activity. extinguished nightly within ½ hour
Turf grass must be minimized. Turf grass shall be minimized
Benefits & exceptionsHide benefits & exceptions4
Compact accessory data centers supporting one entity’s internal IT operations are permitted in all zoning districts if they are accessory to a principal use and not in a separate structure. Permitted in all zoning districts
Data centers may seek conditional-use approval in the I-2 General Industrial District. Converting a building to a data center is also eligible if the building existed as of January 1, 2026; both are subject to the data-center regulations. A data center subject to the provisions
In the I-2 District, the aggregate data-center footprint allowance can increase by 10% if green roofs cover at least 30% of total roof area, and by up to 30% if they cover at least 75%. Increase of aggregate footprint area
In the I-1 and I-2 Industrial Districts, fences or walls up to 12 feet high are allowed, with an extra setback of one foot for each foot of height over six feet. More than twelve feet
Sources
current law · West Hempfield TownshipLimits data centers to 120,000 square feet and 75 feet tall, keeps them at least 1,000 feet from homes and farms, and sets rules for where they can be built and for noise, sound, and light.N/A — no verified data-center-specific law identified in the supplied search results
What this means
The measure would limit data centers to 120,000 square feet and 75 feet tall, and require them to be 1,000 feet from homes and farms. These limits, along with sound, light, and water rules, could rule out many sites, though they would not ban data centers entirely.
People behind it
- Brett Miller
Explicitly identified as a co-sponsor of House Bill 2496.
- West Hempfield Township
Proposed and administers the local data-center ordinance and curative-amendment process.
- West Hempfield Township Board of Supervisors
Held the public hearing and adopted the ordinance; identified as the body enacting the measure.
Show 1 more peopleShow fewer people
- West Hempfield Township Planning Commission
Recommended adoption of the draft ordinance and is leading ongoing revisions.
Restrictions & requirementsHide restrictions & requirements7
Data centers are allowed only in the zoning districts listed in the ordinance. Data centers
A data center must obtain conditional-use approval before it can be built or expanded. Conditional use
A data center may be no larger than 120,000 square feet. The new regulation limits any future data center to 120,000 square feet
A data center may be no taller than 75 feet. and 75 feet in height
A data center must be at least 1,000 feet from any farm or home. data centers to be 1,000 feet from any farm or home
Data centers are subject to restrictions on sound, light, and noise; the article does not specify numerical limits. with restrictions on sound, light and noise
The current law requires a feasibility study concerning groundwater use. the current law requires a feasibility study
Benefits & exceptionsHide benefits & exceptions1
Allows data centers in the Industrial District through conditional-use approval, subject to approval and applicable ordinance standards. Data centers
Sources
current law · West Hempfield TownshipThe current rules are in Ordinance 6-26, which the Board of Supervisors adopted on September 1, 2026 after its public hearing that evening, and the township Planning Commission began discussing further amendments on October 15, 2026.West Hempfield Township, Lancaster County — data-center ordinance (No. 6-26)
What this means
The measure imposes setbacks from homes or other protected places. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.
Restrictions & requirementsHide restrictions & requirements19
Conditional use, § 502.2(B); no expiration of approval
Section 703.10.A caps data centers at an aggregate of 120,000 square feet of data center footprint area, but the ordinance does not state that accessory uses or outdoor equipment such as cooling infrastructure and substations count toward the cap.
Section 703.10.D.2 sets any data center building 1,000 feet from R-1, R-2, and R-3 lot lines and existing dwellings, and Section 703.10.F requires noise-producing accessory structures to meet the same data center setback.
Well study only; no riparian buffer or impact assessment
Must meet Article 800 noise standards; no data center dBA limits, § 703.10.K
Section 703.10.K requires the post-construction study to show ambient noise at the property line no greater than pre-construction levels, but no metric, L90 background, measurement method, or floor is stated.
Pre-construction and post-construction sound studies, § 703.10.K
Public water required; well feasibility study if wells proposed, § 703.10.L, § 802.27
Closed-loop systems named in water conservation rule; evaporative cooling not restricted, § 703.10.M
Public sewer required; no cooling discharge plan, § 703.10.L
Decommissioning plan covers e-waste removal, § 703.10.R
Capacity evidence for water and sewer only, § 703.10.L
Rooftop and ground equipment fully screened from view, § 703.10.K
Emergency plan accepted by the fire department; no updates, radio, or contacts, § 703.10.P
Plan must provide responder training; no funding, § 703.10.P
Hazardous materials named only in decommissioning plan
Annual fire safety inspections, § 703.10.P
Decommissioning plan without security, § 703.10.R
One post-construction sound study, § 703.10.K
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Conditional use in the I-2 General Industrial District
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data