West Goshen Township
Anti-Data Center Policies
Pennsylvania requires data centers over 25 megawatts to obtain local approvals and meet power, grid-cost, environmental, and community commitments; covered facilities also face annual energy and water reporting. These rules make large projects harder, not impossible, while eligible centers may receive equipment tax breaks.
Rating and summary from Pennsylvania statewide as there are no scored current or future laws outside temporary restrictions for West Goshen Township.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
pending · West Goshen TownshipRestricts data centers under the proposed zoning ordinance to conditional-use approval in the Industrial District and sets requirements for setbacks, water and sewer, power, noise, generators, emergency response, and decommissioning.Proposed West Goshen Township Zoning Ordinance Amendment—Data Centers (§§ 240-6, 240-19, and 240-31)
What this means
The proposal would allow data centers only through conditional-use approval in the Industrial District, with a 7-acre minimum lot and setbacks that can reach 1,000 feet near homes or other sensitive sites. It also requires detailed studies and safeguards for noise, water, power, emergency response, and eventual cleanup, creating substantial hurdles with no offsetting incentives.
People behind it
- West Goshen Township Board of Supervisors
Awarded the proposal for the comprehensive zoning update and authorized the proposed ordinance for advertisement and public review. Awarded a proposal to Gilmore & Associates; authorized the proposed Zoning Ordinance for advertisement
- Gilmore & Associates
Selected to prepare the comprehensive update and presented the draft ordinance. awarded a proposal to Gilmore & Associates for a comprehensive update
- Land Planning Committee
Reviewed zoning uses and districts and recommended updates. Through the Land Planning Committee
Show 1 more peopleShow fewer people
- West Goshen Township Planning Commission
Scheduled to review the proposed ordinance. will review the proposed Zoning Ordinance
Restrictions & requirementsHide restrictions & requirements13
Data centers are allowed only in the Industrial District and require conditional-use approval. The application must include a fee and plan, and the applicant must prove compliance with the ordinance’s standards at a public hearing. Approval generally expires if the applicant does not apply for a building or use-and-occupancy permit within one year. The Industrial District lists data centers as conditional uses.
A data center must occupy at least 7 acres and be no more than 60 feet tall, including rooftop equipment and accessory uses. Setbacks are 200 feet from other properties and road rights-of-way, increased to 1,000 feet where adjoining residential uses or districts, or a sensitive-receptor lot, are involved. Minimum lot area shall be 7 acres.
General conditional-use approval standards require the applicant to show, among other things, that traffic impacts will not reduce critical intersections below Level of Service C, that adequate water and sewer service is available, and that runoff will not increase at property boundaries. The Township may impose additional conditions. No conditional use shall be approved unless.
Mechanical equipment, including cooling equipment, must be screened from view on all sides with a visually solid screen. Screened from view on all sides.
The applicant must use public water, document expected water use, and obtain provider documentation that service is sufficient without harming pressure or availability for other Township users. It must use air-cooled, closed-loop, or similar high-efficiency cooling systems. Public water is required to be used.
A data center must connect to public sewer; submit an analysis of wastewater quantity and type; show that the sewer authority can convey and treat it; and may not discharge data-center wastewater into stormwater systems or surface waters. A Data Center shall be connected to public sewer.
For grid power, the applicant must provide utility-provider confirmation of available capacity and detailed plans for power supply, including substations. If feasible and reasonably obtainable, it must also analyze potential effects on public electricity rates and reliability. the necessary capacity is available.
On-site power-generation facilities are accessory uses that need Board approval as part of conditional use approval and must meet applicable laws and safety reviews. Substations visible from a roadway require year-round opaque landscaping and screening walls; substations abutting a non-Limited-Industrial district boundary or a parcel with residential use must be at least 800 feet from the property line. On-site power lines of 34.5 kV or less must be buried. On-site energy generation.
A qualified professional must prepare a pre-construction noise and vibration study for the conditional-use application and a post-construction study within 180 days after operations begin. Limits vary by neighboring land use and time of day; for residential receptors, for example, the limits are 55 dBA by day and 45 dBA at night, with separate low-frequency limits. The Township may require further testing, interim mitigation, and corrective action; identified violations generally must be remedied within 90 days. pre-construction noise and vibration study.
Backup generators may be used only for outages or similar emergencies, testing, or utility-requested peak-demand reduction, and only Tier IV generators are allowed. Testing must be announced on a public website at least 24 hours in advance, with 24-hour advance notice to the Township. Only Tier IV generators shall be utilized.
The applicant must submit an emergency response plan reviewed and accepted by local fire and emergency services, provide first-responder training, and arrange annual fire-safety inspections. The applicant must reimburse costs for specialized first-responder training, including future ongoing training. Battery or other energy storage must meet NFPA 855 or similar standards and include storage-specific fire suppression. Costs incurred, including specialized training.
At application, the operator must submit a decommissioning plan covering safe shutdown, equipment removal, materials disposal or recycling, and site restoration. The Township may require financial security for decommissioning and restoration. Above-ground structures and equipment must be removed unless the Township approves adaptive reuse. submit a Decommissioning Plan.
The parking schedule requires one parking space per 8,000 square feet of floor area designed for regular employee access. One space per 8,000 s.f..
Benefits & exceptionsHide benefits & exceptions5
Data centers are allowed in the Industrial District through conditional-use approval, with a stated minimum lot area of 7 acres and maximum building height of 60 feet. “Data center use shall satisfy”
The ordinance recognizes a broad range of data-center accessory uses, including on-site energy generation, substations, cooling systems, utility lines, and water and wastewater facilities. These must be on the same tract or adjacent parcels developed as a unified project. “Ancillary uses or structures secondary and incidental”
On-site power generation—including solar, wind, fossil-fuel, or nuclear facilities—is treated as an accessory use and may be considered in the data center’s conditional-use application; it remains subject to approval and applicable reviews and regulations. “shall be considered an accessory use”
An on-site electric substation serving a data center may be located beside or behind the principal building, and no buffer or screening is required between the building and the substation. Other siting and screening limits apply. “do not require a buffer or screening”
The data-center-specific noise standards supersede the Township’s general noise provisions for data centers. The standards still impose numeric limits, monitoring, and mitigation requirements. “shall supersede noise standards”
Sources
pending · West Goshen TownshipAfter the county Planning Commission reviewed the draft on August 13, 2026, the township sent revisions to the county on September 8, 2026 and posted the revised draft on its website, and as of the Supervisors' October 20, 2026 meeting no follow-up county review letter had been received and no hearing or adoption date had been set.West Goshen Township, Chester County — proposed data-center ordinance (None Adopted)
What this means
The proposal would impose setbacks from homes or other protected places, minimum site-size requirements and noise limits and sound testing. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.
Restrictions & requirementsHide restrictions & requirements23
I Industrial district only, Table of Permitted Uses (Use G9) and § 84-35
Conditional use decided by the Supervisors; approval expires if no building permit is sought within 1 year, not tied to start of construction, § 84-142 D(7).
Section 84-13.G(9)(c) applies the setback to the Data Center, the Data Center Accessory Uses, and associated equipment and structures, and increases it to 1,000 feet next to residential uses, district boundaries, and Sensitive Receptor lots.
55 dBA day and 45 dBA night for residential receivers, § 84-13.G(9)(j)[9] Table 2
Section 84-13.G(9)(j)[9] Table 6 makes an increase of 3 dBA or more above the baseline ambient level a violation, and Table 5 documents the baseline with a Type 1 or Type 2 meter over at least 15 minutes.
70 dBC day and 60 dBC night, § 84-13.G(9)(j)[9] Table 3
Study with the conditional use application and as-built study within 180 days of operation, § 84-13.G(9)(j)[1] and [3]
Tests announced 24 hours in advance; no hour limits, § 84-13.G(9)(k)
Public water required with provider sufficiency documentation; no hydrogeologic study, § 84-13.G(9)(f)
Air-cooled, closed-loop, or similar high-efficiency systems required, § 84-13.G(9)(f)[1][c]
Daily and annual water use estimates, § 84-13.G(9)(f)[1][a]
Public sewer, wastewater analysis with the application, and sewer authority certification; no cooling discharge plan, § 84-13.G(9)(g)
Tier IV generators only; no annual testing or reports, § 84-13.G(9)(k)
Decommissioning plan covers disposal or recycling of materials, § 84-13.G(9)(m)[2]
Utility capacity certification with the application; no electrical inspection, § 84-13.G(9)(h)[1].
On-site generation is an accessory use approved with the conditional use, without its own setbacks, § 84-13.G(9)(i)[1]
Substations to the side or rear and screened; lines of 34.5 kV or less buried, § 84-13.G(9)(i)[2]-[4]
Equipment screened on all sides; no height or acoustic standard, § 84-13.G(9)(e)
Emergency Response Plan accepted by the fire department; no annual updates or radio coverage, § 84-13.G(9)(l)[1]
General hazardous storage and anti-contamination rules; no storage setbacks, § 84-53 C and E applied by § 84-13.G(9)(a)
Annual fire safety inspections, § 84-13.G(9)(l)[1][e]
Decommissioning plan; financial security optional, § 84-13.G(9)(m)
One as-built noise and vibration study, with more testing on complaints, § 84-13.G(9)(j)[3] and [7]
Benefits & exceptionsHide benefits & exceptions1
Proposed approval pathway: Proposed: conditional use in the I Industrial district
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data