Pennsylvania requires data centers over 25 megawatts to obtain local approvals and meet power, grid-cost, environmental, and community commitments; covered facilities also face annual energy and water reporting. These rules make large projects harder, not impossible, while eligible centers may receive equipment tax breaks.

Rating and summary from Pennsylvania statewide as there are no scored current or future laws outside temporary restrictions for West Donegal Township.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

pending · West Donegal Township
Would allow data centers only in the General Industrial zone with special approval and require them to meet rules for noise, water, energy, safety, emissions, setbacks, and screening.Proposed West Donegal Township data-center zoning ordinance amendment

What this means

The proposal would allow data centers only in the General Industrial zone through a special-exception process, with extensive plans and studies required before approval as a special exception. It also imposes substantial operating and site limits, including public-water-only cooling, closed-loop cooling, noise limits, and large setbacks and buffers for data center operations, making development significantly harder without banning it outright.

People behind it

  • Proposed the zoning ordinance amendment to add definitions and regulations for data centers.

  • Named as the applicant for the proposed amendment; as township manager, he described the ordinance as being prepared and clarified its review process.

Restrictions & requirementsHide restrictions & requirements23
  • Data centers may be established or expanded only in the General Industrial zone and require a special exception from the Zoning Hearing Board.

  • A special-exception application must include a sketch-plan-level site plan, prepared by a professional engineer or registered landscape architect, showing buildings, accessory uses, fencing, buffers and landscaping.

  • Applicants must submit a water-utilization report, certified by a professional engineer, detailing water intake, sources, discharge, destinations and cooling systems. They must also provide a public water provider’s letter confirming capacity to serve the center by the hearing.

  • Applicants must submit a professionally certified energy-management plan detailing annual electricity demand, energy sources, storage capacity if applicable, and efforts to maximize renewable or clean energy.

  • Applicants must submit an emergency-response plan addressing floods, fires, explosions and catastrophic weather, provide it to local emergency responders for review and comment, and document their submission and comments.

  • Applicants must submit a noise-mitigation plan with a detailed acoustic study of expected normal-operation noise and strategies to minimize it and achieve a neutral impact on abutting properties; a professional acoustical engineer must certify the plan.

  • Applicants must submit an electronic-waste plan covering safe removal and recycling or disposal of server infrastructure, hazardous materials, batteries and related waste when the center is updated or decommissioned.

  • Applicants must submit a professionally certified thermal-impact plan describing waste-heat reuse or dissipation and vegetative, green-roof or site-design measures to offset urban heat effects.

  • Backup power equipment must minimize air pollutants and meet applicable state and federal emissions laws. Backup generators must meet EPA Tier 4 standards or equivalent; annual testing and reports to the Township and relevant agencies are required.

  • Operators must make good-faith efforts to maximize renewable or clean energy for electricity and cooling, through on-site generation or verifiable power-purchase agreements, and applicants must present information about those efforts to the Zoning Hearing Board.

  • Data centers are prohibited in FEMA-designated 100-year and 500-year floodplains.

  • Battery-storage systems must meet fire-suppression standards, be UL-certified and follow hazardous-material handling protocols.

  • Before the first building receives an occupancy certificate, operators must give emergency responders the final response plan and provide the Police Department and Township an emergency contact’s name, telephone number and email. Operators must consult responders at least annually, provide training if requested, and report contact changes within 10 days.

  • Noise at lot lines adjoining residential, agricultural or institutional districts is limited to 60 dBA from 7 a.m. to 10 p.m. and 50 dBA from 10 p.m. to 7 a.m., on Sundays and on legal holidays. Noise adjoining commercial, industrial, or mining and natural-extraction districts is limited to 65 dBA at all times.

  • Testing, recharging and maintenance of emergency generators and other backup power equipment may occur only on weekdays, Monday through Friday, from 9 a.m. to 5 p.m.

  • Parking must comply with the Township’s parking rules, and operators must make efforts to provide only necessary parking and minimize impervious parking surfaces. Data centers are treated as industrial establishments for parking calculations: one space per employee on the largest shift plus five visitor spaces, with a plan showing anticipated parking needs.

  • Data-center buildings must be at least 200 feet from residential or community-use property lot lines and from residential or institutional districts. Ground-mounted cooling, ventilation, heat or power equipment must be at least 300 feet from those properties and districts.

  • Data-center operations must provide buffer yards along property boundaries, except at site entrances and exits. Buffers must be at least 100 feet along public-street frontage and property lines abutting residential or community-use property or residential or institutional districts, and at least 50 feet beside other nonresidential uses or districts.

  • Buffers generally may be crossed only by essential utilities and access drives; utility crossings must use the shortest practical route and replace lost screening. Buffers require a landscape plan prepared by a professional landscape architect, and any berms must have slopes no steeper than 3:1 and be planted.

  • Cooling, ventilation and operating equipment must be screened to reduce noise and visual impact. Ground equipment must be fully enclosed when technically feasible; otherwise, it must be screened by a visually solid barrier. Rooftop equipment must be screened on all four sides, and equipment visible above a parapet must be set back from it by at least the equipment’s height.

  • Building sides facing a road or a district permitting residential use must include at least two specified design features every 150 horizontal feet, such as changes in height, recesses, windows or materials. Where more than two sides are subject to the rule, their design and materials must be consistent.

  • All consumptive and cooling water must come from the public water provider. Operators may not drill wells or use water from wells on other properties for those purposes; delivered non-potable water is allowed for fire-suppression tanks.

  • Any water-cooling system must be a closed-loop system.

Benefits & exceptionsHide benefits & exceptions3
  • Data centers may be established or expanded by special exception in the General Industrial zone, subject to the ordinance’s application requirements: “Data Centers” are listed as special exceptions.

  • The measure defines data-center accessory uses to include supporting facilities such as offices, utilities, substations, batteries, mechanical and cooling equipment, backup power, communications links, and security facilities, when located on the same lot or unified adjacent lots: “Ancillary uses, structures, equipment and appurtenances”.

  • For parking calculations, a data center is treated as an industrial establishment: one space per employee on the largest shift plus five visitor spaces. The application must include a plan showing that parking will meet anticipated needs: “A data center shall be considered an industrial establishment”.

Sources

pending · West Donegal Township
The draft is dated June 13, 2026 and remains under review, and the zoning officer said by email on October 21, 2026 that no hearing date has been set.West Donegal Township, Lancaster County — proposed data-center ordinance (None Adopted)

What this means

The proposal would impose cooling and water-use rules, noise limits and sound testing and setbacks from homes or other protected places. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements17
  • Section 240-105.2.A requires a special exception application to establish or expand a data center, but it lists no expansion triggers such as added building area, generators, cooling, battery, substation capacity, or electrical demand, and does not exempt like-for-like replacement.

  • 60 dBA by day and 50 dBA at night at residential lot lines, § 240-105.2.F(1)

  • Acoustic study with the application only, § 240-105.2.A(5)

  • Public water required for all consumptive use and cooling, and wells barred, § 240-105.2.M(1)

  • Section 240-105.2.M(2) requires any water cooling system to be a closed loop system, but the definitions allow cooling towers and no evaporative system is barred or limited to a stated water-use rate shown to meet the noise limits.

  • Daily intake volume disclosed; no cap or reporting, § 240-105.2.A(2)

  • Backup generators must meet EPA Tier 4, with annual testing reports, § 240-105.2.B

  • Thermal impact mitigation plan including waste heat reuse, § 240-105.2.A(7).

  • Electronic waste plan for servers, batteries, and hazardous materials, § 240-105.2.A(6).

  • Water provider letter only; no electric utility letter, § 240-105.2.A(2)

  • Energy management plan; renewable energy encouraged only, § 240-105.2.A(3) and C

  • Substations screened, § 240-105.2.K(1)

  • Battery storage must meet fire suppression standards and be UL-certified; NFPA 855 not cited, § 240-105.2.E(1)

  • 100-ft landscaped buffer yard next to residential properties and districts, § 240-105.2.J.

  • Ground equipment enclosed where feasible and roof equipment screened on four sides; no 12-ft standard, § 240-105.2.K

  • Emergency plan shared with responders and an emergency contact; no annual update, § 240-105.2.A(4) and E

  • Annual generator emissions test reports, § 240-105.2.B

Benefits & exceptionsHide benefits & exceptions1
  • Proposed approval pathway: Proposed: special exception in the GI District

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data