West Deer Township
Anti-Data Center Policies
West Deer Township’s enacted rules restrict data centers through siting, setback, cooling, water-use, and other requirements; a separate description calls the enacted ordinance a proposal, limiting projects to specified districts and adding studies and safeguards.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · West Deer TownshipProposes to allow data centers only with conditional-use approval in designated zones and require safeguards for noise, water, cooling, power, safety, and decommissioning.Draft Data Center Ordinance
What this means
The proposal would allow data centers only as conditional uses in industrial and highway-commercial districts, while requiring at least 20 acres and a 1,500-foot buffer from several community facilities (minimum lot size and setbacks). It also requires extensive studies, closed-loop cooling, noise limits, and funding to cover decommissioning, creating significant development and operating barriers (closed-loop cooling and decommissioning requirements).
People behind it
- West Deer Township Board of Supervisors
The draft states that the Board seeks to adopt and implement the amendment and that it enacts the ordinance. adopting and implementing this zoning amendment
Restrictions & requirementsHide restrictions & requirements22
Data centers may be established only as conditional uses in the Industrial and C-2 zoning districts, and applicants must also obtain land-development approval. The conditional-use districts and land-development approval requirement
A data center must be at least 1,500 feet from any school, daycare, senior care facility, medical or emergency services facility, place of worship, or public park. The 1,500-foot setback
The conditional-use application must include a site plan, operating narrative, community impact statement, noise study, 10-year expansion plan, electronic-waste plan, electric-provider capacity documentation, and water-source documentation. Required application materials
A lot must be at least 20 acres; lot coverage is capped at 65%, with at least 10% of lot area, excluding stormwater facilities, designated as open space. Lot size and coverage limits
Buildings may be no taller than 35 feet or 2.5 stories. The building-height limit
Operations must be in a permanent building, and the operational area must be enclosed by a fence at least 7 feet high with a conspicuous sign identifying the responsible entity, its address, and a contact telephone number. Building, fence, and sign requirements
Noise must stay within 5 dBA above ambient from 10 p.m. to 8 a.m. and 10 dBA above ambient from 8 a.m. to 10 p.m.; applicants must establish or use the specified default ambient levels. After a complaint, the operator must begin monitoring within 24 hours and monitor for 48 hours; if verified excess noise continues for three days without corrective action, operations must cease until compliant. Noise limits and complaint response
Backup diesel or gas generator testing is permitted only from 8 a.m. to 6 p.m. Generator testing hours
Vibration from the data center or its accessory uses may not be perceptible beyond the property line, and a qualified professional must conduct a post-construction study while the facility and backup power equipment are operating. Vibration limits and testing
For non-public water sources, applicants must fund a water-feasibility study demonstrating adequate supply and no adverse effect on nearby groundwater or surface water; the study must include specified source, demand, well, water-body, and impact information. Non-public water study requirements
Projects withdrawing at least 100,000 gallons per day on a 30-day average, or using at least 20,000 gallons per day consumptively on that average, must provide proof of review and approval from the municipal water authority or authorities providing service. Water-use approval thresholds
Applicants must demonstrate adequate wastewater disposal and obtain approval from the applicable Sewage Enforcement Officer, drainage-basin authority, and/or Pennsylvania Department of Environmental Protection. Wastewater disposal approvals
Closed-loop cooling is required for server racks and IT equipment. Open evaporative cooling towers are prohibited unless the applicant proves by clear and convincing evidence that closed-loop technology is infeasible, requests an exemption with engineering documentation and alternatives, and obtains a conditional exemption and applicable state permits. Cooling-system rule and exception
A data center may not rely on private potable wells for its primary cooling make-up water. Private-well restriction
Applicants must obtain written utility verification of adequate capacity and show that capacity for other Township needs remains consistent with normal projected growth; known project impacts on electric rates or availability must be documented and made public. An emergency electrical termination switch must also be installed outside any data-center structure. Power-capacity and switch requirements
Lighting is subject to limits at receiving properties: no more than 0.1 foot-candle at residential uses or 0.5 foot-candle at non-residential uses. Lighting must be shielded, LED color temperature may not exceed 3000K, fixtures may not be mounted more than 20 feet high, and nighttime parking and traffic lighting must be extinguished or reduced as specified. Lighting limits and operating rules
Data centers and accessory uses may not cause dust, smoke, glare, heat, exhaust, air, humidity, or vibration to be perceptible at or beyond property lines; rooftop equipment must also be screened under specified design and setback rules. Operational and rooftop-equipment standards
Parking must be provided at one space per 8,000 square feet of employee-accessible floor area or one space per employee on the largest shift, whichever requirement is lower. Parking formula
Applicants must submit an emergency-response plan for review by the Township fire department and emergency services and ensure first responders are trained. Projects with battery storage or other energy-storage devices must comply with NFPA 855 or successor standards and provide fire suppression designed for battery storage. Emergency-plan and energy-storage requirements
Applicants must submit a decommissioning plan covering removal and site restoration, with cost estimates updated every three years, and provide financial security equal to 110% of estimated decommissioning and restoration costs. Decommissioning plan and financial security
A facility is considered abandoned after 12 consecutive months without active operation. After written notice, the owner has 30 days to respond; following a final abandonment determination, decommissioning must start within 60 days and finish within 180 days after it starts. Abandonment and decommissioning deadlines
Small-scale data centers are defined as no more than 20,000 square feet and may not have external power-generation or cooling equipment or facilities. Small-scale center limits
Benefits & exceptionsHide benefits & exceptions2
Data centers may seek conditional-use approval in the Industrial and Highway Commercial C-2 districts; this is limited to those districts and requires approval. “Data Centers as authorized conditional uses”
The Township may grant an exception to the closed-loop cooling requirement, allowing open evaporative cooling towers if the applicant demonstrates that closed-loop technology is infeasible for the project. The applicant must request the exception in writing, provide engineering documentation and proposed alternatives, and obtain all applicable state permits; the Township may impose conditions. “An exemption may be granted by the Township”
Sources
current law · West Deer TownshipThe Board of Supervisors held a public hearing and enacted Ordinance No. 466 on September 16, 2026, by a vote of 3 to 1, and it took effect on enactment.West Deer Township, Allegheny County — data-center ordinance (No. 466)
What this means
The measure imposes setbacks from homes or other protected places, minimum site-size requirements and cooling and water-use rules. The limits sharply reduce usable sites or workable project designs, making development substantially harder despite an available approval route.
Restrictions & requirementsHide restrictions & requirements32
Conditional use with land development approval; no one-year expiration found, § 210-162.A(65)
Community impact statement must address effects on farmland; not barred, § 210-162.A(65)(c)[3]
35 ft maximum; rooftop equipment screened but not height-limited, § 210-162.A(65)(g) and (o)[3]
Community impact statement must address effects on wells, streams, and wetlands; no riparian buffer, § 210-162.A(65)(c)[3]
Section 210-162.A(65)(c)[5] requires a ten-year plan showing planned growth or expansion, but the plan does not state the electrical demand of each phase and no new approval is required for expansion.
Limits set relative to ambient, with default ambient of 50 dBA day and 45 dBA night, § 210-162.A(65) Noise [1]-[2]
Section 210-162.A(65) Noise [1] and [2] limit noise to 5 dBA above the 72-hour average ambient at night and 10 dBA by day, using ANSI sound meters and generally accepted procedures, but the ambient is an average rather than an L90 and no floor is set below which the cap does not apply.
Noise study with the application and complaint monitoring after opening; no building permit or post-opening study, § 210-162.A(65)(c)[4] and Noise [4]
Generator testing only between 8:00 a.m. and 6:00 p.m.; no weekday or hours cap, § 210-162.A(65) Noise [5]
Water authority documentation or a water feasibility study for non-public sources; no pump tests, § 210-162.A(65) Water supply
Closed-loop cooling required and open evaporative cooling towers prohibited unless exempted, § 210-162.A(65) Cooling System Requirements.
Projected water demand disclosed; no use cap, usage reporting, or drought plan, § 210-162.A(65) Water supply [2]
Section 210-162.A(65) Water supply [4] requires the applicant to show that disposal of domestic and cooling or industrial wastewater has been provided and approved by the Sewage Enforcement Officer, the Deer Creek Drainage Basin Authority, or PA DEP, but it does not state that the approval must be in hand before the zoning permit.
Heat may not be perceptible at or beyond the property lines; no thermal impact plan, § 210-162.A(65)(o)[2]
Electronic waste recycling and management plan required; contents not specified, § 210-162.A(65)(c)[6]
Utility certification of available capacity with the application; no electrical inspection, § 210-162.A(65)(c)[7].
Projected electrical demand and power sources in the community impact statement; no renewable requirement, § 210-162.A(65)(c)[3]
Substations counted as accessory uses; no screening or line burial standard, Section 1
NFPA 855 with battery-specific fire suppression, § 210-162.A(65) Emergency Response Plan [3].
Known impacts on electric rates must be documented and made public; no cost assignment, § 210-162.A(65) Electrical Power Supply [1]
Shielded lighting with 0.1 footcandle limit on residential property, § 210-162.A(65)(n)
Rooftop screens must use materials complementary to the building exterior; no facade standards, § 210-162.A(65)(o)[3]
Rooftop equipment screened on all four sides; ground equipment not addressed, § 210-162.A(65)(o)[3]
Emergency Response Plan reviewed by the fire department; no annual update or radio coverage requirement, § 210-162.A(65) Emergency Response Plan [1]
Applicant must ensure first responders receive training; funding not required, § 210-162.A(65) Emergency Response Plan [2]
Safety data sheets required for water treatment chemicals; no containment or storage setbacks, § 210-162.A(65) Water supply [2]
Community impact statement must address construction and operational traffic; no traffic impact study, § 210-162.A(65)(c)[3]
110% security, but removal may take up to 240 days after a final abandonment finding and no closure notice, § 210-162.A(65)(r)
Post-construction vibration study; noise reports only after complaints, § 210-162.A(65) Vibration [2] and Noise [4]
Operations must cease if verified excess noise is not corrected within three days, § 210-162.A(65) Noise [4].
Ambient noise documentation reviewed by the Township consultant; cost not assigned, § 210-162.A(65) Noise [1]
Fence sign must name the entity controlling the data center; developer and end user not required, § 210-162.A(65)(i)
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Conditional use in the I and C-2 districts
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data