West Conshohocken allows data centers only through conditional-use or special-permit review in designated districts, with setbacks, operating limits and on-site power requirements.
Incentives
Financial Incentive2
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Borough of West ConshohockenRestricts data centers to conditional-use approval in the heavy-industrial district and requires them to commit to generating power on-site.Borough of West Conshohocken zoning ordinance regulating computer data centers
What this means
The measure would allow data centers only through conditional-use approval in the heavy industrial district, limiting where they can be built. It also requires on-site power generation, which could add significant cost and complexity, even though it does not ban data centers outright (conditional-use limit; on-site power requirement).
People behind it
- West Conshohocken Borough Council
Voted to adopt the zoning ordinance addressing data centers.
Restrictions & requirementsHide restrictions & requirements3
Data centers are permitted only by conditional use in the heavy industrial zoning district, limiting where they may be built and requiring conditional-use approval. Conditional use in the heavy industrial zoning district
An applicant must commit to alternative power systems on the same lot as the data center, using non-traditional or lower-emission sources; the conditional-use application must identify the system type and capacity. Alternative power systems located on the same lot
Alternative onsite power-generation facilities must meet the ordinance’s noise, light, glare, and setback requirements. Noise, light, glare, and setback requirements
Benefits & exceptionsHide benefits & exceptions1
Allows data centers by conditional use in the heavy industrial zoning district, rather than excluding them there. Applicants must commit to on-site alternative power generation, identify its type and capacity, and meet the ordinance’s noise, light, glare, and setback requirements. Allows data centers by conditional use
Sources
current law · West Conshohocken BoroughBorough Council adopted the rules as Ordinance No. 2026-02 on June 9, 2026 and amended them by Ordinance No. 2026-04 on September 8, 2026, and Innovation 411 Fee Owner LLC has filed land development and conditional use applications for the Innovation 611 Data Center on Front Street.West Conshohocken Borough, Montgomery County — data-center ordinance / amendment 2026-04
What this means
The measure imposes setbacks from homes or other protected places, cooling and water-use rules and noise limits and sound testing. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.
Restrictions & requirementsHide restrictions & requirements27
60 dBA weekday daytime and 50 dBA weekend limits at the property line with ANSI S1.4 meters; above 50 and 45 dBA, and no weekday night limit stated, § 113-69.1.A(6) as amended
Noise not to clearly exceed the average intensity from other causes beyond the district boundary; no numeric background cap, § 113-69.1.B(2)(b)
67 dBC weekday daytime and 57 dBC weekend at the property line, above 60 and 55 dBC, § 113-69.1.A(6) as amended
Preliminary study in the conditional use process, interim study at building permit at approved maximum buildout, and as-built study 6 months after occupancy, using ANSI S1.4 meters, with limits applied with all generators running, § 113-69.1.A(6)(a)-(c) as amended
Generators limited to backup and emergency use; the 2026-02 weekday 3 PM to 5 PM testing window was removed when Ord. 2026-04 replaced A(6), § 113-69.1.A(15)
Vibration not to clearly exceed the average from other causes beyond the district boundary; no numeric limit, § 113-69.1.B(2)(b)
Public water capacity documentation if public water is used, and utility capacity documentation before approval; public water not required and no well study, § 113-69.1.A(17) and A(21)(b)
Closed-loop cooling required for all equipment unless an alternative is shown to use less water and energy, § 113-69.1.A(21)(a)
Drought response plan required; no metered use reporting, § 113-69.1.A(21)(c)
Wastewater analysis including HVAC discharge and documentation of public system capacity; sewer authority or DEP approvals not required before the zoning permit, § 113-69.1.A(21)(d)
Decommissioning plan covers disposal or recycling of materials and waste under environmental laws; no electronic waste plan, § 113-69.1.A(23)
Documentation of available electrical capacity before conditional use approval; utility service request and executed agreement not required, § 113-69.1.A(17)
On-site lower-emission power required, with type and capacity identified, and LEED certification; no energy plan with demand, § 113-69.1.A(16) and A(19)
On-site alternative power must meet noise, light, glare, and setback rules; not a separate use with its own approval, § 113-69.1.A(19)
NFPA 855 with battery-specific fire suppression; no setbacks, fire test data, or hazard mitigation analysis, § 113-69.1.A(20)(d) as amended
Evidence of impacts on local and regional electric rates with the application; required upgrades and costs not disclosed, § 113-69.1.A(22)
50-ft transitional landscape buffer against any other use, § 113-69.1.A(9)
Photometric plan and no objectionable glare beyond the property line only; no shielding requirement, § 113-69.1.A(14) and B(2)(d)
All ground and rooftop mechanical equipment fully screened on all sides with a visually solid screen, and sound reducing materials or systems required to meet the noise limits, § 113-69.1.A(6) and A(12)
Emergency Services Coordination Plan acceptable to the Department of Emergency Services, with 24-hour contact signage and radio coverage; no annual plan update or walk-through, § 113-69.1.A(20) as amended
Emergency Action Plan with spill prevention and containment for fuel and batteries and hazardous material storage procedures, submitted to the Borough Fire and Safety Team; no storage setbacks, § 113-69.1.A(20) (Ord. 2026-02)
Compliance with the Department of Emergency Services annual fire and life safety inspection program; no correction period stated, § 113-69.1.A(20)(a)[5] as amended
Truck idling limit only; no construction hours, haul routes, or road bond, § 113-69.1.A(18)
Decommissioning plan at conditional use and each land development submission, without financial security, § 113-69.1.A(23)
As-built sound study required every year, § 113-69.1.A(6)(d) as amended
Penalties and injunctions under Article XIX and the MPC, and revocation only for permits issued in error or by misrepresentation; no revocation grounds after notice and a hearing, § 113-69.1.A(6)(c) and D
Enforcement costs recoverable, but no applicant-paid review of studies, § 113-69.1.D(3)
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Conditional use in the HI Heavy Industrial District
Sources
current law · West Conshohocken BoroughBorough Council held a public hearing and voted 6 to 0 to adopt Ordinance No. 2026-02, permitting a computer data center as a conditional use in the HI Heavy Industrial District.West Conshohocken Borough, Montgomery County — data-center ordinance / amendment 2026-02 (2026-06-09)
What this means
The measure provides a route for data centers through a special permit or conditional-use review in designated districts. That offers legal certainty, but the extra approval step can add time and uncertainty.
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Borough Council held a public hearing and voted 6 to 0 to adopt Ordinance No. 2026-02, permitting a computer data center as a conditional use in the HI Heavy Industrial District.
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data