West Chillisquaque Township

Anti-Data Center Policies

West Chillisquaque Township’s enacted ordinance limits noise and building height, requires sound testing and setbacks from homes and other protected places, and increases project costs; data centers can still be approved.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · West Chillisquaque Township
Section 14.17 was added by Ordinance No. 151, enacted on March 10, 2026, and on September 24, 2026 the Planning Commission recommended amendments that would allow 75-foot buildings plus 10 feet of rooftop equipment and require a setback of 200 feet plus 2 feet for each foot of building height, with the supervisors' October 13, 2026 agenda listing the draft for referral to the county and the township secretary anticipating a hearing in December 2026.West Chillisquaque Township, Northumberland County — data-center ordinance (No. 151)

What this means

The measure imposes noise limits and sound testing, setbacks from homes or other protected places and building-height limits. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements18
  • 60 ft maximum, including roof-mounted cooling and ventilation equipment; accessory uses no taller than the principal building, § 14.17.3.1 and § 14.17.3.2

  • 67 dBA weekday daytime and 57 dBA at night and on weekends at the property line, § 14.17.6.1

  • Section 14.17.6.1 requires preliminary, interim, and as-built sound studies using ANSI S1.4 sound level meters, with the as-built study six months after the certificate of occupancy, but the limits apply to normal operations and no study is required at full operating load.

  • Water feasibility study required where the use relies on nonpublic water, public authority certification for public water, and Susquehanna River Basin Commission approval above set withdrawals, § 14.17.7.1 to § 14.17.7.3

  • The feasibility study must describe how water will be used, including for cooling, but only for nonpublic water, § 14.17.7.2.3

  • Projected water demand disclosed in the feasibility study; no cap, reporting, or drought plan, § 14.17.7.2.1

  • Section 14.17.7.4 requires the applicant to demonstrate that disposal of domestic, cooling, and industrial wastewater has been provided and approved by the Sewage Enforcement Officer or DEP, but does not state that the approval must be in hand before the zoning permit.

  • Utility certification of available capacity required; no third-party electrical inspection, § 14.17.8.1.

  • On-site generation for normal operations is a separate use with its own zoning approval, § 14.17.8.2 and § 1.12.

  • Substations are part of the accessory use, and power supply equipment within 300 ft of roads, residential districts, or sensitive receptors must be enclosed or screened, § 1.12 and § 14.17.5.1

  • Known impacts on electric rates must be noted; no duty to pay for grid upgrades, § 14.17.8.1

  • Landscaped buffer next to residential districts, sensitive receptors, and public roads, built to the Section 12.16 screening standards; width not stated, § 14.17.4

  • Equipment within 300 ft of roads, residential districts, or sensitive receptors enclosed or screened; no height or acoustic standard, § 14.17.5.1

  • Emergency Response Plan reviewed and accepted by the fire department and emergency services; no annual updates, radio coverage, or posted contacts, § 14.17.9.1

  • Plan must ensure first responders receive training, cost not assigned, § 14.17.9.1.4

  • Annual fire safety inspections; no third-party electrical inspection before occupancy, § 14.17.9.1.5

  • As-built sound study after opening, with later studies at the Township's option, § 14.17.6.1.3

  • A failed as-built sound study is a violation of the ordinance, § 14.17.6.1.3

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Special exception in the Industrial District

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data