Loading map…

Borough of Wernersville

Anti-Data Center Policies

Wernersville’s enacted ordinance limits noise and building height, requires sound testing, and sets setbacks from homes and other protected places, increasing costs while still allowing data centers to be approved.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Wernersville Borough
Borough Council enacted it as Ordinance No. 645 on September 2, 2026, after South Heidelberg (Ordinance No. 296, August 25, 2026) and before Lower Heidelberg (Ordinance No. 634, September 15, 2026), and the next step is for the adopted text to be posted on eCode360 or a municipal website.Wernersville Borough, Berks County — data-center ordinance (No. 645)

What this means

The measure imposes noise limits and sound testing, setbacks from homes or other protected places and building-height limits. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements13
  • Conditional use in I-3 Limited Industrial District only, § 423.3(e)

  • Conditional use; no approval expiration, § 423.3(e)

  • Sensitive receptor defined but no data center setback

  • 60 ft; no rooftop equipment limit, § 532.a.i

  • 67 dBA day and 57 dBA night at lot line, § 532.c

  • The shared ordinance text (Wernersville Ordinance 645, noise study section, matching Lower Heidelberg Section 532.d) requires preliminary, interim, and as-built noise studies using ANSI S1.4-2014 meters, but the as-built study is not required at full operating load.

  • Generator testing subject to noise limits only

  • Water feasibility study applies to all I-3 uses and is not stated for data centers, § 423.5.p.i

  • Substations are part of the use, and equipment must sit behind the principal building away from streets and dwellings; no screening or buried lines, §§ 201 and 532.a.v

  • Buffer yards apply to large warehouses only

  • As-built noise study after occupancy, more on request, § 532.d.iii

  • Owner must remediate noise violations, § 532.d.iii

  • Applicant pays for own noise studies; no independent review

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Conditional use in the I-3 Limited Industrial District (joint zoning; no I-3 land in the borough)

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data