Anti-Data Center Policies

Wellsboro Borough’s enacted ordinance allows data centers but limits where they can locate and imposes setbacks and operating rules for cooling, water use, lighting, environmental impacts, and noise, narrowing feasible projects.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Borough of Wellsboro
Restricts data centers to the Commercial Manufacturing district and requires them to follow rules addressing lighting, water use, noise, and environmental impacts.N/A — No identified Wellsboro data center-specific law or ban

What this means

The measure would not ban data centers, but it would limit them to the Commercial Manufacturing district and require rules on lighting, water use, environmental impact, and noise (location and operating rules). Those location limits and operating requirements create significant barriers, even though development remains possible.

People behind it

  • Held the public hearing on the amendment and passed it unanimously.

Restrictions & requirementsHide restrictions & requirements2
  • Data centers may be built only in the Commercial Manufacturing district. The ordinance requires them to be built only in the Commercial Manufacturing district

  • Data centers must comply with operating requirements concerning light levels, water usage, and environmental impact. All data centers

Benefits & exceptionsHide benefits & exceptions1
  • Data centers may be built in the Commercial Manufacturing district, provided they follow the ordinance’s operating guidelines. Built only in the Commercial Manufacturing district.

Sources

current law · Wellsboro Borough
The current rules are in Ordinance 721, which Borough Council enacted on September 14, 2026.Wellsboro Borough, Tioga County — data-center ordinance (Ordinance 721 (2026))

What this means

The measure imposes setbacks from homes or other protected places and cooling and water-use rules. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.

Restrictions & requirementsHide restrictions & requirements29
  • Conditional use after a hearing before Borough Council; approval expires if permits are not obtained within six months, Section 27-1702

  • Section 14.25.1.2 requires all data center principal buildings, accessory structures, and Data Center Electric Utility substations to be at least 1,000 ft from any existing residential structure or other occupied building not on the project parcel.

  • Setback heading covers other occupied buildings, but no distance is set for schools, day care, hospitals, or parks, Section 14.25.1.2

  • District height limit of 45 ft applies to all conditional uses, Sections 27-903 and 14.25.1.1

  • 200 ft setback from water bodies and wetlands plus an environmental impact assessment, Sections 14.25.1.2 and 14.25.1.13

  • Single 57 dBA CNEL limit, Section 14.25.1.3

  • Generator testing only from 9 AM to 6 PM; no weekday limit or hours cap, Section 14.25.1.9

  • Water feasibility study by a Council-selected vendor for nonpublic water, Section 14.25.1.11

  • Section 14.25.1.14(d) requires all data centers to use a closed loop cooling system and prohibits open-loop, once-through, and discharge-based systems, but no water-use rate is set for any evaporative system and no showing that such a system meets the noise limits is required.

  • Projected water demand disclosed in the feasibility study, Section 14.25.1.11

  • Sewer authority certification and description of water discharged, Section 14.25.1.11

  • Stormwater impacts and mitigation must be addressed in the impact assessment, Section 14.25.1.13

  • Tier 4 generators required; no annual emissions testing or reports, Section 14.25.1.9

  • Heat must not be perceptible past the property line and heat islands must be assessed, Sections 14.25.1.4 and 14.25.1.13

  • Utility verification of capacity and third-party final electrical inspection, Section 14.25.1.6

  • LEED Certified level required, but no energy usage plan or required on-site renewables, Section 14.25.1.15

  • On-site generation permitted subject to environmental, safety, and interconnection standards, Section 14.25.1.9

  • Substations screened to 8 ft and placed to the side or rear; on-site lines of 34.5 kV or less buried, Section 14.25.1.8

  • Impact assessment must evaluate effects on electrical grids and consumer electric rates, Section 14.25.1.13

  • Must comply with the Tioga County Lighting Ordinance 2024-1, Section 14.25.1.7

  • Only substations must be screened

  • Emergency response plan to county and fire department, in-building radio coverage, and 24-hour contact signs; no annual update, Sections 14.25.1.10 and 14.25.1.12

  • Fire chief must certify adequate supplies, equipment, and training; no applicant funding, Section 14.25.1.12

  • Types and storage duration of materials must be described, Section 14.25.1.13

  • Third-party final electrical inspection; no annual fire inspection, Section 14.25.1.6

  • Trip generation narrative only; no traffic impact study

  • Bond or letter of credit of at least 100 percent of net decommissioning cost; no closure notice or removal deadline, Section 14.25.1.16

  • Sections 14.25.1.11(ii) and 14.25.1.16(i) require the applicant to pay all costs of the water feasibility study and the decommissioning plan, each prepared by a vendor selected by the Borough Council, and Section 14.25.1.13 does the same for the impact assessment.

  • Conditional use application must name the applicant, owner, developer, and operator, but not the end user, Section 27-1702.2.G

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Conditional use in the Commercial Manufacturing District

Sources