Waterford Township

Anti-Data Center Policies

Pennsylvania requires data centers over 25 megawatts to obtain local approvals and meet power, grid-cost, environmental, and community commitments; covered facilities also face annual energy and water reporting. These rules make large projects harder, not impossible, while eligible centers may receive equipment tax breaks.

Rating and summary from Pennsylvania statewide as there are no scored current or future laws outside temporary restrictions for Waterford Township.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

pending · Waterford Township
The draft is unnumbered and undated, the Planning Commission sent it to the township solicitor for review as of September 24, 2026, and no hearing has been scheduled.Waterford Township, Erie County — proposed data-center ordinance (None Adopted)

What this means

The proposal would impose setbacks from homes or other protected places, limited eligible locations and noise limits and sound testing. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.

Restrictions & requirementsHide restrictions & requirements26
  • Conditional use approval by the Board of Supervisors; no one-year expiration of approval, Section 2 C

  • 45 ft for principal buildings and 35 ft for accessory buildings; rooftop equipment not limited, Section 4 B

  • Environmental Impact Assessment and an impact analysis covering wildlife, groundwater, surface water, and soil required, Sections 3 and 12

  • 57 dBA day and 50 dBA night at any property line, above the 50 and 45 dBA standard, Section 7 A

  • Section 7 B requires preliminary, interim construction-phase, and post-construction as-built sound studies, with the as-built study at designed operating capacity and peak operational loads.

  • Generators are only included in the sound studies; no testing hours or cap, Section 7 B

  • Hydrogeologic study and water feasibility study for non-public sources; wells for cooling not barred and no pump tests, Sections 3 and 8 A

  • Cooling method not required to be disclosed or restricted

  • Projected water demand disclosed in the feasibility study for non-public sources; no cap, reporting, or drought plan, Section 8 A

  • Township stormwater ordinances plus groundwater recharge and post-construction runoff analysis, long-term maintenance plans, and enhanced bonding with review every 5 years, Section 9.

  • Air quality is only an impact analysis topic; no emission standard for generators, Section 12

  • Equipment removal at decommissioning only; no disposal or recycling requirement, Section 13 A

  • Written utility documentation confirming available capacity with the application; no electrical inspection, Section 10.

  • Energy Management Plan covering demand, supply, backup power, and renewable energy usage; no on-site renewable requirement, Section 10

  • Electrical substations counted as accessory uses and transformers screened from roads and adjacent properties, Sections 1 and 6 A

  • Battery storage hazards only listed as an Emergency Response Plan topic; no NFPA 855 or fire code requirement, Section 11 A

  • Planted buffer of at least 100 ft along residential property lines, Section 5.

  • Cooling equipment, generators, transformers, and mechanical systems screened from roads and adjacent properties; no all-sides, height, or acoustic standard, Section 6 A-B

  • Emergency Response Plan with annual drills and posted 24-hour emergency contact signage; no fire company review, annual updates, or radio coverage, Section 11

  • Applicant must train local responders, supply firefighting or hazardous material equipment the fire departments need, and pay emergency preparedness costs, Section 11 B.

  • Hazardous material incidents must be addressed in the Emergency Response Plan; no storage setbacks or containment, Section 11 A

  • Annual drills only; no fire safety or electrical inspections

  • Section 3 requires a Traffic Impact Study with every conditional use application but states no required contents.

  • Decommissioning plan and security acceptable to the township; no 110% amount, closure notice, or removal deadline, Section 13

  • Bond reviewed every five years; no update after the first year, Section 13 B

  • One post-construction as-built sound study, Section 7 B

Benefits & exceptionsHide benefits & exceptions1
  • Proposed approval pathway: Proposed: conditional use in Approved Solar Overlay Districts

Sources