Washington Township

Anti-Data Center Policies

Washington Township requires data centers to meet noise limits and testing rules, keep setbacks from homes and other protected places, and meet minimum site-size requirements, increasing costs while still allowing approval.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Washington Township
The rules are in Ordinance 310, which the Board of Supervisors adopted on April 8, 2026.Washington Township, Northampton County — data-center ordinance (No. 310)

What this means

The measure imposes noise limits and sound testing, setbacks from homes or other protected places and minimum site-size requirements. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements13
  • 100-ft buffer yard from all property lines; no residential setback, Section 3(4)

  • Environmental impact assessment required, Section 3(13)

  • 67 dBA day and 57 dBA night at property lines, Section 3(18)

  • Section 3(18)(A) requires preliminary, interim, and as-built sound studies using ANSI S1.4-2014 sound level meters, with the as-built study six months after the certificate of occupancy, but the as-built study is not required at full operating load.

  • Water resources impact study at 4,000 gpd and DRBC review, Section 3(12)

  • Sewer capacity letter or on-lot sewage report, Section 3(12)

  • Applicant study of required upgrades and how applicant will pay, Section 3(15).

  • Section 3(4) requires a 100 ft buffer yard from all property lines, planted as an impenetrable screen of 100 percent evergreen trees, with a recorded note that dead plant material shall be replaced and a performance guarantee for the plantings.

  • Buffer yard screening and 8-ft fence, Section 3(4), (5), (7)

  • Fire protection plan to fire company, Knox box, radio coverage, Section 3(11), (16)

  • Spill containment system required, Section 3(5)

  • One as-built sound study, later study on request, Section 3(18)

  • Section 3(18)(A)(5) allows the Township to revoke zoning permits if a sound violation is not remedied within 90 days of notice, but no hearing precedes revocation and Sections 616.1 and 617.2 of the Municipalities Planning Code are not cited.

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Special exception in the Commercial and Industrial districts

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data