Warwick Township
Anti-Data Center Policies
Warwick Township’s enacted ordinance requires noise limits and testing, setbacks from homes and other protected places, and minimum site sizes; data centers may still be approved, but face added costs.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Warwick TownshipThe current rules are in Ordinance No. 2026-03, which the Board of Supervisors adopted unanimously on July 20, 2026.Warwick Township, Bucks County — data-center ordinance (No. 2026-03)
What this means
The measure imposes noise limits and sound testing, setbacks from homes or other protected places and minimum site-size requirements. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.
Restrictions & requirementsHide restrictions & requirements25
Conditional use; no approval expiration, § 195-16.H(19)A
Section 195-16.H(19)D(3) limits a data center to 35 ft inclusive of roof-mounted equipment, but the district height limit for other principal buildings is not in the amendment text read.
67 dBA weekday day, 47 dBA night and weekends, § 195-16.H(19)G(1)
Section 195-16.H(19)G(1) requires preliminary, building permit, and as-built studies with ANSI S1.4 meters, but the as-built study six months after occupancy is not required at full operating load.
Generator sound evaluated; no testing limits, § 195-16.H(19)G(2)
Section 195-16.H(19)G(3) requires a vibration study showing zero particle velocity at the property line, but no measurement method or instrument standard is stated.
Capacity assessment and DRBC approval for large withdrawals, § 195-16.H(19)H
Reclaimed water for cooling only encouraged, § 195-16.H(19)M
Water consumption assessment, § 195-16.H(19)H(1)
Stormwater management plan required, § 195-16.H(19)L(3)
Emission sources identified in impact assessment; no generator standard
Electric will-serve letter and capacity assessment; no third-party inspection, § 195-16.H(19)H(1).
Rooftop, canopy, and facade solar required where feasible; no energy plan, § 195-16.H(19)O
Substations are accessory uses and equipment is screened, § 195-16.H(19)C, F
Section 195-16.H(19)H(2) requires the applicant to provide, at its own expense, the system improvements needed to address the capacity limits or constraints that the utility assessment identifies.
Landscape buffer per § 195-63, width not set, § 195-16.H(19)E
Equipment within 300 ft enclosed or screened, § 195-16.H(19)F(1)
Emergency response plan reviewed by fire official, with annual inspections; no radio or contact rules, § 195-16.H(19)I(1)
First responders must receive system training, § 195-16.H(19)I(1)(d)
Annual fire safety inspections; no third-party electrical inspection, § 195-16.H(19)I(1)(e)
Access roads evaluated in emergency plan only
MPC § 509 security and removal within 6 months; no 110% amount, § 195-16.H(19)Q
As-built study six months after occupancy, § 195-16.H(19)G(1)(c)
Exceeding limits after as-built study is a violation, § 195-16.H(19)G(1)(c)
Applicant pays only for decommissioning inspection, § 195-16.H(19)Q
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Conditional use in the LI district
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data