Loading map…

Warrington Township

Anti-Data Center Policies

Warrington Township’s enacted ordinance limits noise and building height and requires sound testing and setbacks from homes and other protected places, increasing costs while still allowing data-center approval.

Incentives

Financial Incentive
3

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Warrington Township
The standards are in new Zoning Ordinance Section 764, added by Ordinance No. 2026-04, which the Board of Supervisors enacted on October 14, 2026 after a public hearing that day, effective immediately.Warrington Township, York County — data-center ordinance (No. 2026-04)

What this means

The measure imposes noise limits and sound testing, setbacks from homes or other protected places and building-height limits. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements17
  • 200 ft from all property lines; buffer yards of 100 to 300 ft within 500 ft of schools, day care, hospitals, and parks, § 764.C and O(3)

  • 35 ft maximum height; rooftop equipment screened and set back but not capped, § 764.B and O(2)(b)

  • Riparian forest buffer of 100 ft on each side, wider on slopes and 25 ft more at wetlands, § 764.X

  • Single 60 dBA CNEL limit at the property boundary, § 764.F(1)

  • Public water connection required if available; water supply impacts evaluated, § 764.A(4) and P(5)

  • Impact analysis must address sewage disposal and wastewater, § 764.P(5) and (6)

  • Township stormwater ordinance applies and a stormwater management plan is required, § 764.P(3) and S(3)

  • Heat may not be perceptible at the property line, and heat island impacts must be analyzed, § 764.G and P(6)

  • Disposal of materials must comply with state and federal rules, § 764.P(4)

  • Utility capacity verification and third-party electrical inspection before occupancy, not before approval, § 764.I

  • LEED certification and rooftop solar required; no energy usage plan, § 764.U and Y

  • Substations screened by an 8 ft opaque wall or landscaping, and on-site lines of 34.5 kV or less buried; placement not set, § 764.L

  • Buffer yards of 100 to 300 ft with 8 ft berms next to homes and sensitive uses, § 764.O(3).

  • Ground equipment fully screened and rooftop equipment screened on all four sides; no acoustic screening required, § 764.O(2)

  • Line-of-sight study for service area screening; no renderings, § 764.O(1)

  • Posted 24-hour emergency contacts and in-building radio coverage; no emergency plan, § 764.M and R

  • Types of materials stored must be disclosed, § 764.P(1)

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Conditional use in the Village Commercial Zone

Sources

expired · Warrington Township
The Board of Supervisors adopted Resolution 2026-09, formalizing the data center moratorium effective from the March 11, 2026 motion.Warrington Township, York County — data-center resolution 2026-09

What this means

While in force, the measure paused covered data-center applications or development while new rules are prepared. That stops affected projects from moving ahead during the pause, even though it is not a permanent ban.

Timing

The Board of Supervisors adopted Resolution 2026-09, formalizing the data center moratorium effective from the March 11, 2026 motion.

Sources

expired · Warrington Township
The Board of Supervisors adopted Resolution 2026-15, an administrative pause under Section 609.2 of the Municipalities Planning Code that gave the Planning Commission six months to prepare a data center ordinance.Warrington Township, York County — data-center resolution 2026-15

What this means

While in force, the measure paused covered data-center applications or development for six months. That stops affected projects from moving ahead during the pause, even though it is not a permanent ban.

Timing

The Board of Supervisors adopted Resolution 2026-15, an administrative pause under Section 609.2 of the Municipalities Planning Code that gave the Planning Commission six months to prepare a data center ordinance.

Sources

pending · Warrington Township
Would allow data centers as a conditional use in Warrington Township’s Village Commercial Zone and impose site, noise, safety, environmental, and energy requirements.N/A — no confirmed data-center-specific Warrington Township measure identified

What this means

The proposal would allow data centers only as conditional uses in the Village Commercial zone, while requiring 200-foot setbacks and extensive environmental, safety, noise, and screening measures. These rules could make projects costly and difficult to site, creating significant barriers, though they do not ban data centers outright.

People behind it

  • Identified as proposing the zoning ordinance amendment to add data centers as a conditional use in the Village Commercial Zone.

Restrictions & requirementsHide restrictions & requirements30
  • Data centers and related uses may be allowed only as a conditional use in the Village Commercial Zone; the amendment does not authorize them as a permitted use by right. allowed as a conditional use

  • Applicants must meet the amendment’s additional standards as well as the zoning and subdivision ordinances; where requirements conflict, the stricter rule applies unless the amendment says otherwise. the most restrictive regulations shall be applied

  • Before the conditional-use hearing, the applicant must submit an environmental and community impact analysis covering operations, traffic, materials, nearby resources, disposal compliance, and potential effects on services and public facilities. Prior to the commencement of the hearing

  • A separate environmental impact assessment by a qualified professional is required, addressing environmental effects and mitigation, air emissions, stormwater, plan consistency, alternatives, and critical impact areas. An Environmental Impact Assessment shall be performed

  • Buildings and associated structures must be sited and designed to address visual impacts, safe access and queuing, parking, natural resources, and stormwater management; multi-building campuses are encouraged to transition from smaller street-facing buildings to larger interior buildings. Buildings shall be sited and oriented

  • Connection to public water and public sewer, with permanent metering, is required if those services are available. if available

  • Data center buildings may not exceed 35 feet in height. maximum building height

  • Principal buildings, accessory structures, and data center electric substations must be at least 200 feet from property lines. Parking must be at least 100 feet from public road rights-of-way and property lines. at least two hundred (200) feet

  • Parking must include at least one space per employee on the largest shift, plus three visitor spaces; at least one loading space is required, and loading spaces or bays may be on only one façade of the principal building. one parking space per employee

  • Noise at the property boundary may not exceed 60 dBA CNEL, except for specified emergency, utility, snow-removal, or road-repair work; the zoning officer may require a noise barrier when compliance is inconclusive. shall not exceed 60 dBA

  • Air, dust, smoke, glare, exhaust, heat, and humidity from operations must not be perceptible at or beyond the property line. not perceptible at or beyond the property line

  • Operational equipment must be in metered, grounded, pre-engineered metal enclosures rated to resist an internal electrical fire for at least 30 minutes, with fire baffles that close automatically. Battery or other energy-storage proposals must demonstrate compliance with NFPA 855 or similar standards and provide storage-specific fire suppression. resist an internal electrical fire for at least 30 minutes

  • Before a certificate of completion or occupancy, the applicant must obtain written service-provider verification of adequate utility capacity and infrastructure, adequate cooling and operation systems, and no electrical interference or voltage fluctuations; written proof of a third-party final electrical inspection is also required. Prior to approval of the certificate of completion or occupancy

  • Lighting must be shielded and directed to limit spill and glare: residential properties may receive no projected illumination, while light reaching a nonresidential property may not exceed 0.5 initial footcandle. LED color temperature is capped at 3,000 K, luminaires at 20 feet, and roof-mounted light poles are prohibited. Parking and traffic-way lighting must be extinguished within 30 minutes after closing, subject to specified reduced-lighting or motion-control options for continued nighttime activity. shall at no time exceed 0.5 initial footcandle

  • Perimeter fences may not exceed eight feet above ground. shall not exceed eight (8) feet

  • Substations must have year-round opaque landscaping or an eight-foot screen wall; power lines serving the property must be buried, including on-site lines of 34.5 kV or less. Substation setbacks are measured from the compound’s edge, and on-site substations do not need screening between themselves and the principal building. On-site power lines of 34.5 kV and below must be buried

  • Each operation must post 24-hour emergency contact signage visible at the access entrance, listing the company if applicable, owner or representative, and local power company with telephone numbers. 24-hour emergency contact signage

  • Unless physically impossible, loading docks, truck entries, and truck drive aisles must face away from abutting sensitive receptors; they must be located away from nearby receptors to the greatest feasible extent, with screening provided. oriented away from abutting Sensitive Receptors

  • Buffer yards and screening are required along property boundaries except at site entrances and exits. Service areas must be screened from specified roads, sensitive receptors, and existing residences; ground equipment generally must be screened and cannot be placed in a required setback, and rooftop equipment must be screened or set back from the parapet. buffer yards and screening along all property boundary lines

  • Enhanced berm-and-planting buffers are required beside roads and sensitive receptors. Required widths depend on the combined building footprint: 100-foot buffers for footprints under 100,000 square feet; 150 feet along streets and qualifying sensitive-receptor boundaries for 100,000–250,000 square feet; and 300 feet in those locations above 250,000 square feet. Other property lines generally require 100 feet for the smallest category and 50 feet for the larger categories; berms must be at least eight feet high. combined footprint of the principal structure

  • The required landscape buffers have specified tree and shrub quantities, sizes, species limits, and screening outcomes, including a complete visual screen at least 12 feet high within three years. Existing vegetation may substitute for new berms and plantings only if approved by the Board of Supervisors. complete visual screen of the property

  • Exterior building colors must be low-reflective, subtle, or earth tone; fluorescent and metallic wall colors are prohibited. Fluorescent and metallic colors shall be prohibited

  • The applicant must coordinate with the township emergency management coordinator to ensure adequate in-building radio coverage for emergency responders and install enhancement systems if needed. shall install enhancement systems as needed

  • The environmental assessment must identify stationary and mobile sources of PM2.5, volatile organic compounds, and nitrogen oxides and specify emission-reduction practices. If 15 or more trucks may park or gather at the facility, anti-idling signs are required in specified areas and must be strictly enforced. 15 or more trucks may park or congregate

  • Data centers must implement low-impact site-design and energy/resource-efficiency practices, including measures such as minimizing disturbance and impervious surfaces; the amendment also lists practices such as reclaimed cooling water and alternative energy. required to implement low-impact development practices

  • LEED certification is required unless a variance is granted, and roof-mounted solar energy systems are required. LEED certification is required

  • Removal of trees at least six inches in diameter at breast height must be minimized; no more than 50% of any covered tree mass, tree line, hedgerow, or individual freestanding trees may be removed. In no case shall more than 50%

  • A Pennsylvania Natural Heritage Program study dated within two years of the first application for conditional use or subdivision and land development must be submitted, along with required agency clearance letters; the applicant must follow their species-protection measures. dated within two (2) years

  • Sites containing, alongside, or within 150 feet of specified waters must protect, restore, or establish a riparian forest buffer. The buffer is at least 100 feet on each side, with added width for steeper slopes or certain wetlands; earth disturbance, development, and material storage are barred within it, and it must be protected in perpetuity. minimum of 100 feet on each side

  • All roofs must be designed and built to be solar-ready; roof areas without solar panels or other utilities must use roofing with a solar reflective index of at least 78 for the building’s life. For complexes over 400,000 square feet, rooftop solar panels must be installed and operated before occupancy to supply as much of the facility’s power as feasible. complexes over 400,000 square feet

Benefits & exceptionsHide benefits & exceptions2
  • Data centers and related uses may seek conditional-use approval in the Village Commercial Zone, creating a defined route to approval there; they are not allowed automatically and remain subject to the amendment’s standards. “as a conditional use”

  • The defined data-center accessory uses include supporting infrastructure such as electrical substations, utility lines, cooling-water facilities, and generators for temporary backup power. They must be secondary and incidental to the data center and located on the same tract or adjacent parcels developed as a unified project; normal-operation energy generation systems are excluded. “Ancillary uses or structures”

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data