Neutral Data Center Policies
Walker Township’s zoning ordinance does not address data centers specifically; facilities may fit permitted warehouse uses or require conditional-use review, with added permits and operating limits.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Walker TownshipRequires data-center proposals to follow general zoning and permitting rules; because data centers are not specifically listed, an unlisted use may require conditional-use approval.Walker Township Zoning Ordinance of 2003
What this means
The ordinance does not mention data centers specifically: a facility might fit the permitted enclosed-warehouse uses in the Light Industrial district, or need conditional-use review if treated as an unlisted use (enclosed warehousing or storage facilities; uses not provided for). Zoning permits and industrial operating standards add some paperwork and limits, but there is no data-center ban or special incentive, so the likely effect is minor added burden.
People behind it
- Walker Township Board of Supervisors
Enacted and ordained the zoning ordinance.
- Mike Lesniak
Identified as the Township Zoning Officer; the ordinance assigns the Zoning Officer responsibility for administering and enforcing it.
Restrictions & requirementsHide restrictions & requirements3
New construction, structural alterations, and changes in land use require a zoning permit before work begins or the changed use starts. Permit applications require plans and a fee, and the Zoning Officer has up to 30 days to issue or deny a permit. Permit requirements
A building or land cannot be occupied or used until a Certificate of Compliance is issued. The Zoning Officer must issue or deny it within 15 days after inspection and approval. Certificate requirement
If a data-center proposal is treated as a lawful use that is neither specifically permitted nor prohibited, it must go to the Township Supervisors for conditional-use review. The applicant must show the use is compatible with the district and meets other stated criteria; the Supervisors hold a public hearing, and approval generally expires if required permits or conditions are not met within six months. Unlisted-use procedure
Benefits & exceptionsHide benefits & exceptions4
In the Light Industrial district, enclosed warehousing or storage facilities and research and development facilities are permitted principal uses, subject to zoning approval and applicable requirements. A data center could benefit if the Township classifies it under one of these use categories; the ordinance does not expressly name data centers. Enclosed warehousing or storage facilities
If a proposed use is lawful but not specifically listed as permitted or prohibited, it may be referred to the Supervisors for conditional-use review. Approval requires, among other things, that the use be similar and compatible with uses in the district, not permitted in another district, and consistent with the ordinance. lawful use is neither specifically permitted nor prohibited
Utility supply facilities may be considered through special-exception review in the Light Industrial district, providing a zoning pathway for certain utility infrastructure. Approval is not automatic and depends on the ordinance’s review standards. Utility supply facilities
A lawful nonconforming use or structure may generally continue even if it does not conform to district rules, offering protection if zoning requirements later change. The protection may end if the use is abandoned for one year, and other limits apply to expansion or reconstruction. may be continued
Sources
pending · Walker TownshipThe ordinance has no number yet, and the township advertised it for consideration for adoption at the Board of Supervisors meeting on November 4, 2026.Walker Township, Centre County — proposed data-center ordinance (None Adopted)
What this means
The proposal would impose cooling and water-use rules, noise limits and sound testing and setbacks from homes or other protected places. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.
Restrictions & requirementsHide restrictions & requirements14
Allowed only in the Light Industrial and Mineral Extraction districts, which excludes agricultural districts; no preserved farmland or agricultural security area bar, Section 3.A
District setback, impervious coverage, and density requirements stated as applying; no data center minimum, Section 3.B
District impervious coverage limit stated as applying; no footprint or megawatt cap, Section 3.B
District setbacks only; no residential setback, Section 3.B
Noise may not be audible beyond the property line from 7 pm to 7 am, or 100 ft beyond it by day; no numeric limits, Section 3.C
Documentation of adequate supply or hydrogeologic proof of sustainable yield, and SRBC approval above thresholds; no well bar or pump tests, Section 10.B and C
Water-cooled systems allowed only as closed-loop with non-potable water and drift controls, and potable water barred for cooling, Section 10.D.
Sections 7.C and 10.G of the proposed ordinance require annual reports of total water use verified by calibrated meters, and Section 10.E requires a water management plan with drought response, but the drought response is not tied to state, basin commission, or supplier drought declarations.
Water management plan must cover wastewater discharges, and cooling tower blowdown must be pretreated, Section 10.E and F.
Renewable Energy Implementation Plan and 100% renewable procurement, which may be met by contracts or certificates; on-site generation not required, Sections 4 and 5
Energy storage must comply with NFPA 855; no battery-specific suppression, Section 6.B
Annual reports on electricity use, renewable procurement, and metered water use, Section 7
Sections 7.D and 11 allow fines of up to $600 per day, permit suspension, and revocation of the conditional use after notice with at least 30 days to correct, but no hearing precedes revocation and enforcement under Sections 616.1 and 617.2 of the Municipalities Planning Code is not cited.
Section 5.C allows third-party review of the Renewable Energy Implementation Plan at the applicant's expense, but the review is discretionary and limited to that one plan rather than the applicant's studies generally in land development review.
Benefits & exceptionsHide benefits & exceptions1
Proposed approval pathway: Proposed: conditional use in the Light Industrial and Mineral Extraction districts
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data