Valencia Borough does not specifically name data centers; if treated as an unlisted use, they may require conditional-use approval in the LSC District, with a minimum two-acre lot and a 60% limit on impervious coverage.
current law · Valencia BoroughDoes not specifically regulate data centers; an unlisted data-center use may require conditional-use approval in the Large Scale Commercial district.Valencia Borough zoning provisions (data-center-specific provisions not identified)
What this means
The ordinance does not specifically name data centers; if treated as an unlisted use, they may be allowed only as a conditional use in the LSC District. That adds approval steps and site limits, including a two-acre minimum lot and a 60% cap on impervious coverage, but the rules do not ban data centers or single them out for especially severe limits.
People behind it
- Shanon McKenna
Moved to accept and pass Ordinance 238.
- Brian Himmelstein
Seconded the motion to accept and pass Ordinance 238.
- Valencia Borough Council
Adopted Ordinance 238; the ordinance states that Council intended to adopt it.
Show 2 more peopleShow fewer people
- Valencia Borough Planning Commission
Reviewed and recommended adoption of the zoning ordinance and map.
- Chris Rearick
Zoning Officer; the ordinance assigns the Zoning Officer day-to-day administration of its provisions.
Restrictions & requirementsHide restrictions & requirements7
A use not expressly listed in the zoning districts may be allowed only as a conditional use in the Large Scale Commercial (LSC) District, subject to the ordinance’s general criteria. The ordinance does not specifically name data centers, so it does not establish a data-center-specific authorization. unlisted uses may be permitted as a conditional use in the LSC District
Construction or structural alteration requires the applicable zoning permit, and use or occupancy may require a zoning occupancy permit. The Borough’s instructions require zoning-officer approval before applying for a building permit; certain structures may also require a permit from Adams Township. must first get approval from the Valencia Borough Zoning Officer
The Borough’s building-and-planning process requires a zoning certificate application, a plot-plan drawing, and the applicable fee, submitted to the Zoning Officer. Include the appropriate fee
A conditional-use application requires a development plan and other specified materials, an application fee or deposit, and a public hearing before Borough Council. Council must issue a written decision within 45 days after the last hearing; approval expires after two years unless the required permit is obtained and construction or the approved use begins. shall hold a public hearing
Applicable district rules impose minimum lot sizes, setbacks, and maximum lot and impervious-surface coverage; the ordinance also limits building height to two and one-half stories unless otherwise permitted. If a proposed lot lacks both public water and public sanitary sewer, the general minimum lot size is one acre. one-acre minimum lot size
Development must meet the Borough Stormwater Management Ordinance and applicable environmental standards. Site alteration, regrading, filling, or vegetation clearing before Borough Council reviews and approves development plans is prohibited. shall meet the standards of the Subdivision and Land Development Ordinance and the Stormwater Management Ordinance
Operating uses are subject to performance standards addressing nuisance conditions and emissions. Exterior lighting generally may not exceed one-half footcandle measured three feet above ground or spill onto adjacent properties; noise limits include 60 dBA in specified residential-use contexts and 65 dBA in the LSC District for more than two hours in a 24-hour period. all uses in all districts shall be subject to the following standards of operation
Benefits & exceptionsHide benefits & exceptions1
A use not expressly listed in the zoning districts may be considered for conditional-use approval in the Large Scale Commercial District, providing a permitting route for an unlisted use. Approval requires meeting the ordinance’s general conditional-use standards and LSC dimensional, compatibility, and other applicable requirements. Uses not expressly listed